Get complete information related to latest Servo Controller Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Servo Controller Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Servo Controller Tenders.
Tender For repair replacement of submersible horizontal pumping sets for tubewell booster consisting mainly of motor, pump electrical control panel, starter, cable and all accessories sluice valve, non return valves specials, lowering pipe etc. including all
Tender For mtc of repair replacement of submersible horizontal pumping sets for tubewell booster consisting mainly of motor, pump electrical control panel, starter, cable and all accessories sluice valve, non return valves specials,lowering pipe etc. inclu
Tender For repair/replacement of submersible/ horizontal pumping sets for tubewell/ booster consisting mainly of motor, pump electrical control panel, starter, cable and all accessories sluice valve, non return valves specials, lowering pipe etc. including all
Tender For mtc of repair replacement of submersible horizontal pumping sets for tubewell booster consisting mainly of motor, pump electrical control panel, starter, cable and all accessories sluice valve, non return valves specials, lowering pipe etc. includin
Tender For b9)-a/mtc. of ephs (w/s) in sector-24, u/e panipat-repair of submersible pumping machineries including motor pumps electrical control panel starter cable with kit kat and all accessories, non-return sluice valve, sluice valve and specials etc.
Tender For b8)-a/mtc. of ephs (w/s) in sector-12 and 12-hbc, u/e panipat-repair of submersible pumping machineries including motor pumps electrical control panel starter cable with kit kat and all accessories
Tender For providing materials for watersupply items to mathi gp davanagere dist. - mains wire //ana gp, panel board items //ana gp, cable 4mm //ana gp, pump 18 stage //ana gp, pump 16 stage //ana gp, pump 14 stage //ana gp, pump 12 stage //ana gp, moter 10hp //ana gp, moter 7.5hp //ana gp, moter 6hp //ana gp, bar casing up //gp, bar casing //gp, steeg box //gp, panel bourd //gp, nrv 2 g a //gp, puc 63 m m threeded elbow //gp, puc cap 25 m m //gp, puc cap 75 m m //gp, puc cap 63 m m //gp, motor 6 h p 10 stage //gp, motar cail //gp, elbow 1/2 g a //gp, caller 1/2 g a //gp, nipple 1/2 g a 2 feet //gp, nipple 1/2 g a 1 feet //gp, elbow 3/4 g a //gp, caller 3/4 g a //gp, nipple 3/4 g a 2 feet //gp, nipple 3/4 g a1 feet //gp, electrical tape//gp, motor 7.5 15 stage //gp, motor 7.5 12 stage//gp, realy //gp, volto meter //gp, hamse meter //gp, starter //gp, praventer //gp, auto stater //gp, pipe 2 g a //gp, caller 2 g a //gp, nipple 2 g a feet //gp, bend 2 g a //gp, cabel 4 sq //gp, xcet blade //gp, selvent //gp, puc tee 25 mm //gp, puc tee 75 mm //gp, puc tee 63 mm //gp, puc elbow 75 mm //gp, puc elbow 63 mm //gp, puc elbow 25 mm //gp, puc caller 75 mm //gp, puc caller 63 mm //gp, puc caller 25 mm //gp, repair coupler 110 mm //gp, repair coupler 90 mm//gp, repair coupler 75 mm //gp, repair coupler 63 mm //gp, puc ballwall 75 mm //gp, puc ballwall 63 mm //gp, puc ballwall 20 mm //gp, puc ballwall 25 mm //gp, puc pipe 110 mm //gp, puc pipe 90 mm //gp, puc pipe 75 mm //gp, puc pipe 63 mm //gp, puc pipe 50 mm //gp, puc pipe 40 mm //gp, puc pipe 32 mm //gp, puc pipe 25 mm //gp, puc pipe 20 mm //gp
Tender For annual maintenance of bore well motor pumps,starter panel board and supply of specials for water supply section in sandur tmc limits for fy-2025-26 - erecting and commissioning of new hand pump including fixing of gi pipes, fixing of hand pump to the borewell and giving satisfactory test etc. complete., erecting and commissioning of new hand pump india mark iii including fixing of gi pipes fixing of hand pump to the borewell and giving satisfactory test etc complete, repair top head assembly of hand pumps by removing the top head assembly replacing the wornout parts such as handle axle chain bearings reassembling after greasing in position and giving satisfactory test etc complete excluding the cost of parts required for replacement etc complete, dismantling india mark iii hand pump from position releasing plunger rods valves piston overhauling the components replace the wornout parts and re erecting in position etc with cutting threading wherever necessary adjusting the rod and giving satisfactory test etc the replaced materials to be returned to the departmental store the cost exclude the cost of parts required for replacement , dismantling india markiii hand pump from position releasing gi pipes rods pump cylinder and strainer overhauling the components replace the wornout parts and re erecting in position etc with cutting threading wherever necessar adjusting the rod and giving satisfactory test etc the replaced materials to be returned to the departmental store the cost exclude the cost of parts required for replacement, providing and greasing the chain of hand pump both india mark ii and india mark iii by removing the top head cover cleaning wanter tank and head assembly removing all dirt inside and outside the hand pump body and refixing the top head cover by fixing the bolts and nuts including replacing the bolts and nuts with new ones wherever necssary etc complete , labour charges for repairing of existing hand pump both india mark ii and india makr iii above the ground level including replacing of worn out parts such as top head inspection cover complete excluding the cost of spares, labour charges for repairing of existing hand pump both india mark ii and india makr iii below the ground level after dismantling the hand pump head assembly, water tank riser assembly plunger rods pump cylinder replacing of worn out parts in the pumpset cylinder including overhauling of cylinder cutting the gi pipes and rods and threading the same, complete excluding the cost of spares, scraping of old paints stains etc and provide painting with anti corrosive pint over a cost primer etc with approved brand of paint and primer etc. including the cost of all materials labour transportation and numbering etc as directed by the departmental officials , fishing out power pump from the borewell including the cost of labour materials with all lead and lifts etc complete , labour charges for lifting of non functioning submersible pump set along with cable and gi pipes each length 6m for 50 mm, labour charges for lifting of non functioning submersible pump set along with cable and gi pipes each length 6m for 32 mm, lifting of struck up submersible pump set. upto 300 ft , lifting of struck up submersible pump set above 300 ft , labour charges for erection of new or repaired submersible pump set along with gi pipes 32mm or 50mm cable (new submersible pump set if required will be supplied by the department free of cost and released pump set should be handed over to department) including transportation. (each length 6 m), labour charges for lowering additional gi pipes of dia 32 or 50 mm dia including transportation charges (new gi pipe required will be supplied by the department free of cost & released gi pipes should be handed over to the department (labour charges only). upto 3 mtr lengths, labour charges for lowering additional gi pipes of dia 32or 50 mm dia including transportation charges (new gi pipe required will be supplied by the dep