Get complete information related to latest Shaft Key Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Shaft Key Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Shaft Key Tenders.
Tender For corrigendum : supply of worm wheel part no.-3 , worm shaft assembly part no.-4 , seal kit part no.-017-019 and 030 , travelling nut gs160 part no.-15 , end stop nut part no.-14 , worm wheel gs315 part no.-3 , seal kit for gs 315 gearbox part no.-017-019 and 030 , travelling nut gs250 part no.-15 , end stop nut gs250 part no.-14 , clutch ring part no.-26 , clutch fork assembly part no.-8 , return spring part no.-16 , declutch clutch tripping arm part no.-14 , compressing spring part no.-25 , hand wheel retiner ring part no.-30 , oil seal kit part no.-013 and 014 , o-ring kit part no.-01 to 07 , circlip kit part no.-021 to 025 , pinion gear shaft assembly part no.-36 , compression spring part no.-37 , hollow drive shaft assembly part no.-24 , worm shaft assembly part no.-21 , spur gear actuator part no.-2.2 , motor pinion actuator part no.- 2.1 , declutch clutch tripping arm art no.-14 , oil seal kit part no.-013 to 014 , hollow drive shaft assembly double start part no.-24 , motor pinion part no.-2.1
Tender For supply of water ring for rim quencher to wap drg. no. 722250410160 of sl.no. 1 and hollow shaft & adaptor with 2 nos. sprockets & key to wap drg. 732250410170.note:-thewarranty shall cover a period of 18 months from the date of delivery of material to the consignee or 12 months from the date of placing the item in service which ever is earlier. [ warranty period: 18 months after the date of delivery ] ]
Tender For supply, delivery, installation of one number dismantling joint along with replacement of worn out spare parts, testing and commissioning of 750 mm dia. pdv and other allied works of pump unit no. 5 at cwps-ii, grww. - supply, delivery, installation, testing andcommissioning of 700 mm dia ms dismantling joints., dismantling counter weight, lever, arm, hydraulic unit etc. and all other components of the hydraulic system one by one of 750 mm dia. pump discharge valve parts by parts sequentially and cautiously as per direction of the engineer-in-charge (eic) at grww., dismantling the 750 mm dia. pdv from the existing pipe-bay, installatio/fitting-fixing of barrel-piece/flange and lifting & keeping the same on the working platform sequentially and cautiously as per diretion of the eic at grww., to and fro transportation charges of 750 mm dia. pdv from grww to workshop including loading and unloading.., dismantling all the components of 750 mm dia. pdv parts by parts sequentially and cautiously as per direction of the eic at grww/workshop., supply, delivery and fitting-fixing of drive shaft of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of valve seal of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of seat ring (ss 410) of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of seat ring (epdm rubber) of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of stub bearing bush of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of drive bearing bush of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of clamping ring of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of end cover of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of o ring of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of shaft pin of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of allen screw of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply,delivery and fitting-fixing of gland plate of 750 mm dia. pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of shaftkey of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., repairing the damaged portion of the hole for holding the bearing of 750 mm dia. pdv by deposting metal, boring, machining, grinding etc., all complete, as per original shape and size and direction of eic at grww.., re-aasembling all the components of 750 mm dia. pdv parts by parts sequentially and cautiously as per direction of eic at grww., performing of necessary hydro-testing of the disc and body of 750 mm dia. pdv as per direction of eic at grww., lowering from the working-bay, installation, fitting-fixing of 750 mm dia. pdv in the existing pipe-bay removing the existing barrel-piece/flanges as per direction of the eic at grww., re-assembling and re-fitting all the components of the hydraulic system like counter weight, lever, arm, hydraulic unit etc. with the existing 750 mm dia. pdv installed in the pipe-bay parts by parts sequentially and cautiously as per direction of the eic at grww., test run, operation and commissioning of the entire system of 750 mm dia. pdv as per direction of the eic at grww.
Tender For supply with fitment of tefc oil immersed single reduction worm gear box cetron make modelnumber : avru 24.,center distance 3 inch with hollow input shaft and having reduction ratio 40:1 , suitablefor 1 hp 1400 rpm , flange motor frame size : 80, make cetron or similar to suit airless centrifugal shot blasting machine rotary table type , model surface finishing equipment company qty-01 no. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of gun metal bearing liner for mill roller side bearing as per drg no bksbymhby29by820817 on conversion basis bore 375mm is code is 25 ratio 1979 02 set 4 pieces , gun metal bearing liner for transmission gear pinion shaft 1st motion as per sample on conversion basis is code is 25 ratio 1979 bore 200mm 01 set 2 pieces , gun metal bearing liner for mill roller for bottom half of top roller as per drg bksbymhby55by830809 on conversion basis is code is 25 ratio 1979 bore 375mm 01 set 2 pieces , gun metal bush for fibrizer hammer size od 70mm bore 60mm length 50mm is code is 25 ratio 1979 , gun metal hollow drum on conversion basis 88 10 2 size id 2inch od 3point5inch l 12inch , gun metal hollow drum on conversion basis 88 10 2 size id 2inch od 4point5inch l 13inch , gun metal hollow drum on conversion basis 88 10 2 size id 2point1by2inch od 4point5inch l 13inch , gun metal hollow drum on conversion basis 88 10 2 size id 1point5inch od 3point1by2inch l 12inch , gun metal hollow drum on conversion basis 88 10 2 size id 3inch od 5inch l 12inch , gun metal hollow drum on conversion basis 88 10 2 size id 2inch od 4inch l 12inch , gun metal soild drum on conversion basis 88 10 2 size od 2inch l 12inch , gun metal soild drum on conversion basis 88 10 2 size od 2point1by2inch l 12inch , gun metal soild drum on conversion basis 88 10 2 size od 3inch l 12inch
Tender For e-quotation for seeking firm rates for non-schedule items for preparing estimates. - supplying , installation, testing and commissioning of vertical turbine pump set with ss impeller capable to discharge 126 m3/hr.against total head of 50 m, (make kirloskar/jyoti/wilo-mather&platt/wpil) coupled with suitable capacity vertical hollow shaft/solid shaft squirrel cage induction motor , rating of motor 20% more bhp than that of pump (make kirloskar /abb /cgl/ siemens) operated on 415 +/- 10% volt, 3 phase , 50 c/s a.c supply , ie3 type as per is:325 and iec:63400-ihaving speed 1450 rpm,with heavy duty m.s. column assembly with ss line shaft and each coloumn of 5 feet length including cost of supplying , fitting and fixing of all required accessories such as cidf sluice valve-1 set, cidf nr valve-1 set, pressure gauge-1 no, strainer-1 no, m.s. channel base plate etc. all complete including cost of taken out existing old pumpset., supplying and installation of fasd starter suitable for above mentioned vt pumpset make lk/bch/schneider., supplying and laying of 25 mm2 , 1.1 kv, 3 core pvc insulated unarmoured copper cable make polycab/kei/gloster, from starter to motor., supplying, installation testing and commissioning of horizontal split casing centrifugal pump set with bronze impeller having discharge 126 m3/hr. against total head of 35 m, (make - kirloskar/jyoti/wilo-mather&platt/wpil), coupled with suitable capacity squirrel cage induction motor, rating of motor 20% more bhp than that of pump(make kirloskar /abb /cgl/ siemens) ,tefc, ie3 type as per is:325 and iec:63400-ihaving speed 1450 rpm,operated on 415 +/- 10% volt, 3 phase , 50 c/s a.c supply, mounted on a commonm.s. base plate including cost of supplying , fitting and fixing of all required accessories such as cidf sluice valve-1 set, cidf nr valve-1 set, pressure gauge-1 no, foot valve-1no, etc. all complete including cost of taken out existing old pumpset., supplying and installation of fasd starter suitable for above mentioned c/f pumpset make lk/bch/schneider., supplying and laying of 16 mm2 , 1.1 kv, 3 core pvc insulated unarmoured copper cable make polycab/kei/gloster, from starter to motor., cost towards complete repairing of control panel at intake well with changing of damaged parts such as :-1.150 amp tpn mccb,50 ka -1 no. as incoming feeder.2. 75 amp tp mccb, 50 ka-2no as outgoing feeder.3.star delta timer-2nos(one for each starter) 4. 32 amp switch fuse unit -01 no. for internal and external light load.5. (0-500 v) volt meter-01 no., ampere meter-01 no.,three phase indicator lamp,powder coating paint,push button on/off,on/off/trip indicator lamp,wiring,etc as per required and testing on full load ., cost towards providing all labour, tools and technicians for taken out and dismantling 40 hp vt p/set with bowl assembly, 6" dia. coloumn pipe and line shaft etc all complete., cost towards dismantling and repairing of complete bowl assembly., cost towards making supplying and fitting s.s. top shaft as per size and sample., cost towards making supplying and fitting of c.i. spider bearing having od 6.5" with rubber bush as per size and sample., cost towards lowering of vt p/set. after complete repairing and assembling works., cost towards complete repairing of control panel at clear water pump house with changing of damaged parts such as :-1.125 amp tpn mccb,50 ka -1 no. as incoming feeder.2. 63 amp tp mccb, 50 ka-2no as outgoing feeder.3.star delta timer-2nos(one for each starter) 4. 32 amp switch fuse unit -01 no. for internal and external light load.5. (0-500 v) volt meter-01 no., ampere meter-01 no.,three phase indicator lamp,powder coating paint,push button on/off,on/off/trip indicator lamp,wiring,etc as per required and testing on full load .