Get complete information related to latest Shaft Pinion Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Shaft Pinion Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Shaft Pinion Tenders.
Tender For supply of spares of rig and mud pump - plunger rod for rd 395 pump , valve seat for rd 395 pump , wing guided valve for rd 395 pump , washer for rd 395 pump , valve cup for rd 395 pump , spring for rd 395 pump , liners 3.5 inch for rd 395 pump , v packing for rd 395 pump , valve cover packing for rd 395 pump , taper roller bering for rd 395 pump , whole clutch assembly for rd 395 pump , main gear for rd 470 mud pump , shaftpinion for rd 470 mud pump , cup piston for rd 470 mud pump , o ring piston rod for rd 470 mud pump , rod pistong for rd 470 mud pump , rod ext cross head for rd 470 mud pump , packing gland for rd 470 mud pump , valve seat for rd 470 mud pump , valve for rd 470 mud pump , seal rubber valve for rd 470 mud pump , retainer valve seal for rd 470 mud pump , spring valve for rd 470 mud pump , square ring for rd 470 mud pump , liner 4 inch for rd 470 mud pump , chuck jaw, mech, nw set of 4 pcs. for rd 60 rig , chuck bushing set of 4 pcs. for rd 60 rig , chuck screw set of 4 pcs for rd 60 rig , hyd. chuck assembly o ring set of 4 pcs. for rd 60 rig , hyd. chuck assembly v packing set of 4 pcs. for rd 60 rig , hyd. chuck assembly gland set of 4 pcs. for rd 60 rig , hyd. chuck assembly piston rod set of 4 pcs. for rd 60 rig , feed screw for jaw set of 4 pcs. for rd 60 rig , chuck jaw, hyraulic, nw set of 4 pcs. for rd 60 rig , input shaft for rd 60 rig , sliding gear for rd 60 rig , gear bevel for rd 60 rig , hyd. cylinder cup piston set of 4 pcs for rd 60 rig , bolt, lock for rd 60 rig , hyd. pto assembly for rd 60 rig , directional control valve with lever for rd 60 rig , pressure feed control valve assembly for rd 60 rig , rubber tyre coupling only tyre for rd 60 rig , oil seal for rd 60 rig , bearing 6028 for rd 60 rig , retainer sela and bearing for rd 60 rig , seal oil for rd 60 rig , o ring for rd 60 rig , gland for rd 60 rig , v packing for rd 60 rig , o ringh for rd 60 rig , piston assembly hydraulic for rd 60 rig , oil seal ratainer for rd 60 rig , lining for rd 60 rig , shaft bevel piston for rd 60 rig , pinion bevel nw for rd 60 rig , output ger pto for rd 60 rig , input gear pto for rd 60 rig
Tender For custom bid for services - 30 mw & 14 mw tg miscellaneous works at nspcl-bhilai power plant-2- 10.10 tmstu61bd000 steam tur(bearing pedestal)attend defect: 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. clean front pedestal housing., 5. take measurement as per instruction of eic. (involves checking of pinionshaft/gear, assembly, main oil pump gear wheel, gov. assembly & checking the backlash of gears.), 6. attend the defect/trouble shoot the problem in front pedestal as per instruction of eic., this includes the following work beside defect attending as per instruction of eic., 7. dismantle pinionshaft and record the alignment w.r.t to the gov. assembly., a) dismantle mop (main oil pump) bearings and gear., b) do servicing of mop and replace damaged items., c) dismantle governor assembly (consists of gop-governing oil pump and other, elements)., d) do servicing of gop and replace damaged items., e) assemble mop and governor assembly., f) put governor assembly in position., g) do alignment of the pinionshaft w.r.t to governor assembly., h) put electronic over speed shaft (pinionshaft) in position., i) put mop assembly in position., j) record backlash of gears and if requires, do adjustment., 8. measure the clearances of first three rows of oil gland fins & its servicing, 9. assembly of oil gland segments (new or old) and setting of clearances., 10. after the work, box up front pedestal top cover., 11. link control valve linkages, oil piping etc., 12. do rig test for setting governing characteristics., 10.20 tmstu56oh000 steam tur (bearings) serv- 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. check bearing interference, toc, soc etc., 5. remove turbine front bearing top & bottom halves., 6. do the dpt and ut of turbine bearing., 7. check thrust bearing pads and do dpt, ut and blue matching., 8. check toc, soc, bearing interference of bearing after servicing., 10.30 tmstu01bd794 steam tur (<=30mw#) repl-gland- 1. removal of first 2 rows of hp front steam gland segments., 2. servicing of (new or old) gland segments and springs., 3. measurement of dimensions and machining of gland segments if required., 10.40 tmtgs01bd701 turbine gov. sys (<=30mw#) maintenance- i) attending passing defect in four nos. steam control valves, ii) servicing of two nos. hydraulic servomotors (including relay gear) of control valves, iii) inspection & servicing of speed governor and setting its governor characteristics (rig test)., iv) inspection & servicing of cies valve (left & right)., 1. ensure ptw from concerned person., 2. breaking of insulation around steam control valves & removal of debris from site., 3. dismantle linkages and decouple all four nos. control valves from spring box assembly, 4. remove spring box assembly from position., 5. dismantle bonnet bolts & remove all four control valves., 6. check blue contact / kerosene test of plug with respective seats., 7. do lapping of all control valves, replace plug/other components, if required., 8. assemble all control valves and tighten bonnet bolts., 9. servicing of cies valves (left & right), 10.servicing of spring box assembly hinges & pins etc., 11.place spring box assembly & couple all control vales with spring box., 12. servicing of two nos. hydraulic servomotors of control valves., 13. servicing of primary relay oil cylinder for checking for excessive draining of oil. replacement of relay gear power, piston if needed., 14. servicing of secondary relay., 15. servicing of linkage., 16. replacement of steam leak-off and impulse line pipes as per eic instruction. dp test of welding joints are to be, carried out., 17. inspection of speed governor, assessment of its component s healthiness, repl