Get complete information related to latest Shock Absorber Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Shock Absorber Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Shock Absorber Tenders.
Tender For bid to ras bid to ras bid to ras corrigendum : supply of gasket to drg. no. 765-05-394 as per qai/rubber/cqa(icv) /005 dec. 2003 , gasket to drg. no. 765-07-33 as per qai/rubber/cqa(icv) / 005 dec. 2003 , shockabsorber to drg. no. 765-50-1963, specn. as per extract qai/rubber/cqa(icv) /005 dec. 2003 , gasket to drg. no. 765-50-2962, extract of ty 005216-75 as per qai/rubber/cqa(icv) /005 dec. 2003 , gasket to drg. no. 773-83-40 as per qai/rubber/cqa(icv) / 004 oct. 2003 , sealing ring to drg. no. 765-50-2963 extract of ty 005216-75 as per qai/rubber/cqa(icv) /005 dec.
Tender For design, supply, installation, commissioning and proving out of shockabsorber testing machine for lhb & yaw dampers on turnkey basis, along with all concomitant accessories, optional accessories, spares for 2 years normal operation and maitenance, consumables as per specification attached.make- amar engineers & fabrication /hindustan testing solution or similar. [ warranty period: 30 monthsafter the date of delivery ] ]
Tender For corrigendum : supply of trunion (r.h.threaded) for enhanced capacity screw coupling to rdso sk-99002, alt.'5', item-6 and rdso str no. c-9505 (revised aug. 2001) [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of trunion (r.h.threaded) for enhanced capacity screw coupling to rdso sk-99002, alt.'5', item-6 and rdso str no. c-9505 (revised aug. 2001) [ warranty period: 30 months after the date of delivery ] ]
Tender For providing of custom bid for services - ---- custom bid for services - revalidation of fall arrestor at hpcl kanpur terminal- annual maintenance and revalidation of fall protection system installed at tlf gantry (16 lines), calibration shed (1 line), sealing tower (4 lines), ethanol u/l gantry (2 lines) and tw gantry, spur 1 (14 sections of 50 mtr each and tw gantry, spur 2 (14 sections of 50 mtr each). i. conduct a thorough inspection of the existing fall arrestor system and lifeline. ii. assess the current condition of all components, including harnesses, lanyards, anchors, and connectors. iii. identify any wear, damage, or defects that could compromise safety. iv. ensure the system complies with the latest safety standards and regulations (e.g., osha, ansi). v. verify that all components meet manufacturer specifications and industry requirements. vi. perform load testing on the lifeline and anchor points to verify their strength and reliability. vii. conduct a drop test to ensure the fall arrestor system functions correctly. viii. provide certification of revalidation, including test results and compliance documentation. ix. carry out necessary maintenance, such as lubrication of moving parts and tightening of loose components. x. repair or replace any damaged or worn parts to restore the system to optimal working condition. xi. document all repairs and replacements made during the revalidation process. xii. recommend and implement any necessary upgrades to enhance the safety and performance of the system. xiii. install additional safety features if required, such as shockabsorbers or retractable lifelines. xiv. prepare a detailed report of the revalidation process, including inspection findings, test results, and maintenance performed. xv. maintain records of all certifications and compliance documents for future reference. xvi. schedule follow-up inspections to ensure continued compliance and safety. xvii. offer ongoing technical support and assistance as needed. xviii. lifting tools & tackles: vendor should get revalidation certification through a up factory competent person and submit all required documents to hpcl.