Web Analytics Made Easy - StatCounter

Sintering Furnace Tenders

Get complete information related to latest Sintering Furnace Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Sintering Furnace Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Sintering Furnace Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45427448 Due date: 25 Jun, 202625 Jun, 2026 2.39 Lacs
Tender For corrigendum : works contract for civil works for installation of sintering furnace.

CTN :45622898 Due date: 04 Jul, 202604 Jul, 2026 NA
Tender For thermocouple, duplex, ungrounded, type: c, for pinaka sintering furnace as per the detailed specif

Central Government/Public Sector

CTN :45627369 Due date: 26 Jun, 202626 Jun, 2026 NA
Tender For bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

Central Government/Public Sector

CTN :45424778 Due date: 26 Jun, 202626 Jun, 2026 NA
Tender For corrigendum : bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

Central Government/Public Sector

CTN :45184710 Due date: 19 Jun, 202619 Jun, 2026 NA
Tender For corrigendum : bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

Central Government/Public Sector

CTN :45331280 Due date: 23 Jun, 202623 Jun, 2026 NA
Tender For supply of high temperature sintering furnace

Central Government/Public Sector

CTN :45071985 Due date: 01 Jun, 202601 Jun, 2026 NA
Tender For corrigendum : supply of microwave sintering furnace

Central Government/Public Sector

CTN :45262130 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For slag removal and bed cleaning works for both cnc plasma cutting machines (inv. nos. m19501 & m19587) and operation of stress relieving furnace at lhb division/icf

CTN :45146283 Due date: 25 May, 202625 May, 2026 14.50 Lacs
Tender For microwave sintering furnace

Central Government/Public Sector

CTN :45200722 Due date: 16 May, 202616 May, 2026 1.92 Lacs
Tender For electrical works for commissioning of sintering furnace
 Loading, Please wait...

Connect us via What's Up