Get complete information related to latest Slaked Lime Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Slaked Lime Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Slaked Lime Tenders.
Tender For - rj-19-11/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixin
Tender For - rj-19-04/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village magispur to kesarpura, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village magispur to kesarpura, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village magispur to kesarpura, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade
Tender For - rj-19-03/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village sirpoi to dhablakhinchi, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village sirpoi to dhablakhinchi, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village sirpoi to dhablakhinchi, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village sirpoi to dhablakhinchi, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village sirpoi to dhablakhinchi, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village sirpoi to dhablakhinchi, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village sirpoi to dhablakhinchi, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed
Tender For rj-19-13/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using visco
Tender For rj-19-14/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as
Tender For - rj-19-07/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village nipaniya to kherana, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village nipaniya to kherana, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village nipaniya to kherana, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village nipaniya to kherana, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village nipaniya to kherana, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village nipaniya to kherana, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village nipaniya to kherana, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of either type
Tender For - rj-19-08/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village dola to padiyarkhedi, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village dola to padiyarkhedi, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village dola to padiyarkhedi, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village dola to padiyarkhedi, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village dola to padiyarkhedi, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village dola to padiyarkhedi, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village dola to padiyarkhedi, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of eith
Tender For - rj-19-10/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village mathaniya to ruaprel, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village mathaniya to ruaprel, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village mathaniya to ruaprel, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village mathaniya to ruaprel, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village mathaniya to ruaprel, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village mathaniya to ruaprel, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village mathaniya to ruaprel, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of eith
Tender For supply of material for 4 months under jurisdiction of road division no.3, m.c. chandigarh. - supply and carriage of stone aggregate 11.2mm nominal size including loading/unloading & stacking at site of work to the entire satisfaction of the engineer in charge., supply and carriage of stone aggregate of 53-22.4 mm nominal size crushed stone aggregates as per mort&h specification from hard durable tough stone of uniform texture collected from any approved quarry to the site of work including loading and unloading and stacking uniformly complete in all respect to the entire satisfaction of the engineer in charge., supply and carriage of stone aggregate of 63-45 mm nominal size crushed stone aggregates as per mort&h specification from hard durable tough stone of uniform texture collected from any approved quarry to the site of work including loading and unloading and stacking uniformly complete in all respect to the entire satisfaction of the engineer in charge
Tender For providing of building materials and execution of the allied works under the work conservation of well area of lahore gate including rampart at red fort - material and work, u. lime katni (in air tight bags), surkhi (free from silt, dust, organic any other foreign material), river course sand (free from silt, dust, organic any other foreign material), gum babool, gur desi, belgiri, jute/sun, lakhori brick (as per site requirements nominal size & specification), brick jeera 6mm (free from clay, organic material), brick aggregate (free from clay, organic material) 20 to 25 mm nominal size, red sand stone thickness 100mm of required size, copper dowel (as per site requirement), red sand stone required (as per site requirement size), red sand stone 50 mm (as per site required size thick for jalie work), red sand stone 40 mm (as per site required size thick undressed for chajja), copper rod 10 mm (as per site requirement), un slakedlime katni (in air tight bags) fine quality, marble dust powder [kg], batasha [kg], araldite [kg], 6 inch dia ballies (6 ft ) [each], ply 12mm thick [m2] water resistant, mud (clay ) [cum] free from impurities, dry uppley [each], planks 50m thick [m2] (well seasoned), jute rope 1 inch [kg], "dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres leaddismantling old lime plaster", demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge.nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix), demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge., painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 13.62.1 two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture, provision of provising and fixing of galvanised mild steel material xpended material (xpm) jali of 4mm thick silver in clour inluding fixing charges etc complete, "float glass panes 9.7.7.1 4 mm thick glass pane (weight not less than 10kg/sqm)", "providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).9.1.2 sal wood", "providing and fixing factory made single extruded wpc (wood polymer composite) solid plain flush door shutter of required size comprising of virgin polymer of k value 58-60 (suspension grade), calcium carbonate and natural fibers (wood powder/ rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 n (face) & 900 n (edge), minimum compressive strength 50 n/mm2, modulus of elasticity 850 n/mm2 and resistance to spread of flame of class a category with property of being termite/ borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk s.s screws, all as per direction of engineer-in- charge. (note: stainless steel butt hinges and necessary s.s screws shall be paid separately) 30 mm thick 26.87.1", "providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the rcc structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry :