Web Analytics Made Easy - StatCounter

Slat Tenders

Get complete information related to latest Slat Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Slat Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Slat Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44842214 Due date: 14 May, 202614 May, 2026 NA
Tender For corrigendum : supply of bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44761071 Due date: 12 May, 202612 May, 2026 NA
Tender For corrigendum : supply of harness of underframe and roof arrangement for lhb eog non ac lgs coaches with centralised fdb in doorway area., as per drawing: edts451, rev- nil, packing instruction: cable harness: complete one coach set cable harness to be protected with biodegradable transparent polythene sheet and packed in a wooden box. soft eco-friendly packing material hay,straw, etc be provided inside the wooden box to protect any damage to cable insulation while packing/unpacking.bottom frame to be made of wooden planks 20mm thick & should have support of atleast 3 wooden battons of size 100x100mm of suitable length to facilitate lifting by fork lifter. rigid pvc conduit supplied loose along with harness should be packed as per instructions .the material used for product packaging shall be eco-friendly.a list should be pasted on each packing showing order no ,pl no, description of the item, drg.no/spec.no, qty , firm's name &address and date of despatch etc. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44761072 Due date: 19 May, 202619 May, 2026 NA
Tender For corrigendum : supply of harness of lhb eog non -ac lscn coaches with fdb on cabin side area only, as per drawing: edts452, packing instruction: cable harness: complete one coach set cable harness to be protected with biodegradable transparent polythene sheet and packed ina wooden box. soft eco-friendly packing material hay,straw, etc be provided inside the wooden box to protect any damage to cable insulation while packing/unpacking.bottom frame to be made of wooden planks 20mm thick & should have support of atleast 3 wooden battons of size 100x100mm of suitable length to facilitate lifting by fork lifter. rigid pvc conduit supplied loose along with harness should be packed as perinstructions .the material used for product packaging shall be eco-friendly.a list should be pasted on each packing showing order no ,pl no, description of the item, drg.no/spec.no, qty , firm's name &address and date of despatch etc. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :45025385 Due date: 06 May, 202606 May, 2026 NA
Tender For corrigendum : supply of set of door cut out for bangladesh coaches..note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25dcbangla version 1, packing instruction: (1) the transportation arrangement should be as per drawing no icf/j&t/sk-1845 alt. `nil?. (2) a list should be pasted showing purchase order no., pl no., description of item, drg. no./spec. no. , order quantity, firm's name, address and date of despatch. etc. (3) transit damage (if any) shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44996364 Due date: 15 May, 202615 May, 2026 NA
Tender For modified fuel oil filling cap assly. as per blw drg. no. tpl-0837 alt-'b' or latest & blw part no.11033538. drawing attached. note:1) material to be procured from blw approved source for this item only. 2) test certificate (tc) & guarantee or warranty certificate are to be provided along with supply. ]

Central Government/Public Sector

CTN :44947942 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For corrigendum : supply of sole bar (2750 mm long) to bpl drg. no. crw/sk-565, alt. nil with one coat of zinc chromium red oxide. material & specification as per drawing. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44992590 Due date: 26 May, 202626 May, 2026 NA
Tender For corrigendum : supply of yoke pin for up-graded ht-cbc. drawing no. : rdso's drg. no. sk-62724, alt. 31 , item no.12. material and specification : rdso's spec. no. wd-70-bd-10, (rev. 4) of november 2024. uvam item ref. : 3100446--upgraded high tensile centre buffer coupler for for freight stock wagons , rdso item id: 3100446 sub item : 3100446005--sub item:yoke pin [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44821381 Due date: 26 May, 202626 May, 2026 NA
Tender For corrigendum : supply of modified junction box for speed sensor device conforming to rdso drawing no. cg-19005,alt. 2 or latest and rdso specification no. rdso/2011/cg-04, rev. 04 of march 2025. material specification as per oems rdso approved drawing. [ warranty period: 36 months after the date of delivery ]

Central Government/Public Sector

CTN :45063857 Due date: 12 May, 202612 May, 2026 NA
Tender For supply of turbine speed sensor as per drawing no. 31164733002 rev04 and hwr material code w97311647045

Central Government / Public Sector

CTN :45014720 Due date: 25 May, 202625 May, 2026 NA
Tender For corrigendum : supply of split cotter, to drawing / specification rdso's sk. 98052, alt- nil , item no.2, material & specification as per drawing. [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up