Tender For reinforced conveyor rubber belt 10" width x 60 feet long x 13 to 15 mm thick for shot blasting machine cmc-1 & pmc -1 bucket elevator, is-1981, 6 plies. note: warranty: 12months from the date of fitment or 18 months from the date of supply, which ever is earlier.[ warranty period: 18 months after the date of delivery ] ]
Tender For corrigendum : supply, installation & commissioning of automated grit blasting machine for internal and external surface preparation of drum weld seam
Tender For supply of set of shot blasting machine material consist of 03 items a)spt 004 top curved wear plate-06, b) spt 008 wheel hood lid (no liners) primer -03, c) spt 173 wheel hood base (no liners) primer-03, this 03 items makes one set [ warranty period: 30 months after the date of delivery ] ]
Tender For reinforced conveyor rubber belt 10 inch width x 60 feet long x 13 to 15 mm thick for shot blasting machine cmc & pmc -1 bucket elevator. is-1981, 6 plies. note: warranty: 12months from the date of fitment or 18 months from the date of supply, which ever is earlier. [ warranty period: 18 months after the date of delivery ] ]
Tender For supply of different spare parts of rotary table type shot blasting machine as per annexure attached. make-surfex. [ warranty period: 30 months after the date of delivery ]
Tender For supply of mn. perforated sheets suitable for turntable type shot blasting machine as per attached railway drg. no. s-1984. [ warranty period: 30 months after the date of delivery ]
Tender For supply of one set of spares consisting of 02 items suitable for airless centrifugal shot blasting machine. as per technical specification and material test certificates as attached at annexure-a. model: - asbmf-1828, make: - surface international or equivalent [ warranty period: 30 months after the date of delivery ]
Tender For reinforced conveyor rubber belt 10 inch width x 60 feet long x 13 to 15 mm thick for shot blasting machine cmc & pmc -1 bucket elevator. is-1981, 6 plies. note: warranty: 12months from the date of fitment or 18 months from the date of supply, which ever is earlier. [ warranty period: 18 months after the date of delivery ]