Get complete information related to latest Solar Pumps Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Solar Pumps Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Solar Pumps Tenders.
Tender For corrigendum : supply of spares of ash slurry pump model d-135 and clinker grinder of ash handling plant pump house stage-i at kstps kota under proprietary category- u seal 916-321(for ash slury pump) pt. no. 916-321 , suction sleeve 916-012 , shaft 916-305 , stuffing box 916-016 , shaft sleeve 916-022 , impeller part no. 916-029 , bell suction side part no.916-010 , bell liner suction side 916-011 , bell engine side part no. 916-014 , liner engine side 916-016 , discharge adopter , reducer 12 x 10" , bearing retainer ring 916-314 , oil level indicator , compression spring , oil gauge, 40 nb bsp p. no. 1 1/2" ispt , adopter sleeve 916-312 , flinger p. no. 916-026 , thrust coller , gland half , spares for clinker grinder assembly for ahp stage-l , 8"x8" tangential inlet , hydro ejector , assembly
Tender For corrigendum : procurement of spares of pembril make fluid coupling model 23scr25b of ash slurry pump for ph- ii and model 41scr 24x for ph i and ii at sgtps, birsinghpur - spares for pembril make fluid coupling (model-23scr25b) of ash slurry pump for ph-ii, input shaft, scoop housing bracket, shaft, bearing cover, bearing nut, bearing liner, set bolt, locking washer, shaft ring, if fitted, self locking nut, casing plug for cover plate, oil retaining ring, locking washer part no.56, locking washer part no. 60, scoop housing shroud, counter sunk screw, self locking nut, key woodruff, circlip, end cover, circlip external, circlip internal, scoop housing assembly, impeller, joint collector ring impeller, bonded seal part no. 196, bonded seal part no. 182f, vent tube, connecting tube, leak of nozzel, joint scoop housing bracket, feed tube, pillow block, runner baffle, set bolt, self alinging bearing, spring if (fitted), scoop pin, dowel, runner, end cover, bearing liner, spares of pembril make fluid coupling (model: 41scr-24x) for ph-i&ii, operating rod, operating lever, joint centre spigot, control lever, woodruff key, bearing liner(23124), bearing liner (nu 228), scoop housing assembly, scoop tube assembly, feed tube, leak of nozzle set, centre spigot, shaft, bearing nut, bolt for multi disc unit, self locking nut, vent tube, locking washer/star washer, allen screw for liner, .
Tender For corrigendum : tn11194supply of spares of ash slurry pump model d-135 and clinker grinder of ash handling plant pump house stage-i at kstps kota under proprietary category - u seal 916-321(for ash slury pump) pt. no. 916-321, suction sleeve 916-012, shaft 916-305, stuffing box 916-016, shaft sleeve 916-022, impeller part no. 916-029, bell suction side part no.916-010, bell liner suction side 916-011, bell engine side part no. 916-014, liner engine side 916-016, discharge adopter, reducer 12 x 10", bearing retainer ring 916-314, oil level indicator, "compression spring 916-320(1 set of 8 nos.)", oil gauge, 40 nb bsp p. no. 1 1/2" ispt, adopter sleeve 916-312, flinger p. no. 916-026, thrust coller, gland half, spares for clinker grinder assembly for ahp stage-i, "8""x8"" tangential inlet hydro ejector assembly part no. a-218-r/l"
Tender For construction of pressurized pipe system to supply water for solar micro irrigation to deliver at farmers field up to 1 ha with a duty of 0.84 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 meter residual head at 1 ha for micro pressurized irrigation in distt. bilaspur in 135 ha. in kharif ( left side of bhaisajhar lift irrigation scheme. as indicated in index map), out of total gross command area, 135 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (ftl line) of bhaisajhar lift irrigation scheme as indicated in the index map for micro irrigation system without exceeding total power requirement for solarpumps with solar panel it includes all activities starting from investigation , planning ,design, drawing, construction of underground distribution network for micro irrigation system down to 1 ha chak in 8 ha consisting of providing, laying & fixing of all types of pressurized pipe lines with all necessary valves to serve as main line, branch line, distributaries, minors and sub-minors of pressurized irrigation system of bhishajhar lift irrigation project (to serve total cca not less than 135 ha in kharif ) including providing control at 4 ha and 2 ha with fixing multiple outlets with duty of 0.84 lit/sec/ha upto 4 ha and distribution network up to 1 ha chak, to serves the area as shown in index map with discharge of 3 times the specified duty at 1 ha chak including scada & successful trial run and commissioning and as per scope work and as directed by engineer-in-charge.. the work also includes formation of fpo as per company act/rule, management, operation and maintenance (mom) and defect liability (dl) for the period of 05 years after completion and mom and dl period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by engineer-in-charge as per details given in scope of work. mou between agency and fpo to operate scheme after 05 years of mom and dl period and to arrange linkage facility to the fpo
Tender For construction of pressurized pipe distribution network lift irrigation scheme to supply water for irrigation to deliver at farmers field up to 1 ha with a duty of 0.70 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 meter residual head at 1 ha for pressurized irrigation by rotation in village kapua, block -patharia ,dist. -mungeli in 160 ha. in kharif (right side of khairi anicut as indicated in index map), out of total gross command area 270 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (ftl line) of khairi anicut as indicated in the index map for irrigation system without exceeding total power requirement for solarpumps with solar panel of 100 kwp.it includes all activities starting from survey, investigation, designing, estimating costing, procurement, construction, laying, installing, energizing, etc. of pumping system, rising and gravity mains, main line, branch lines, distribution network, controlling and regulation system , scada work with automation etc. for supply of filtered water for irrigation under pressure. the work also includes construction of chowkidar quarter, pump house, installation of solar power plant and sub station with transformer of required capacity by liasoning with cseb, management, operation and maintenance (mom) and defect liability (dl) for the period of 05 years after completion and mom and dl period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by engineer-in-charge as per details given in scope of work
Tender For construction of pressurized pipe distribution network lift irrigation scheme to supply water for irrigation to deliver at farmers field up to 1 ha with a duty of 0.70 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 meter residual head at 1 ha for pressurized irrigation by rotation in village bandhapali, baghanpur, bundeli , baragaon and barpali block sarangarh ,dist. sarangarah-bilaigarh in 150 ha. in kharif (madhavpali anicut as indicated in index map), out of total gross command area 270 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (ftl line) of madhavpali anicut of dist- sarangarah-bilaigarh as indicated in the index map for irrigation system without exceeding total power requirement for solarpumps with solar panel of 110 kwp.it includes all activities starting from survey, investigation, designing, estimating costing, procurement, construction, laying, installing, energizing, etc. of pumping system, rising and gravity mains, main line, branch lines, distribution network, controlling and regulation system , scada work with automation etc. for supply of filtered water for irrigation under pressure. the work also includes construction of chowkidar quarter, pump house, installation of solar power plant and sub-station with transformer of required capacity by liasoning with cseb, management, operation and maintenance (mom) and defect liability (dl) for the period of 05 years after completion and mom and dl period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by engineer-in-charge as per details given in scope of work.
Tender For corrigendum : procurement of critical spares of bottom ash hopper and slurry pump installed at ash handling plant at 2x600 mw, sstpp, mppgcl, dongalia.