Get complete information related to latest Spv System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Spv System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Spv System Tenders.
Tender For supply of set of rubber packing (gasket) for doors & windows of 3 phase locos set consisting of 9items as following:- (1) modified window glass (log) packing (outer) drg. no. c/els/lgd/rc/4/11 (alt.1) =12 mtrs. (2) packing for wind screen (log inner) of 3 phase locos. drg. c/els/lgd/b.f/4/41 (alt.1)=12 mtrs. (3) gasket for window outer frame of wag9/wap7 locos (04 nos to be supplied each of 1.75mtrs as a single closed piece as per drg.), drg. no.c/els/lgd/rc/4/10 (alt-1) =07 mtrs. (4) packing forcab triangular window of 3 phase locos (inner) drg. no. c/ els/lgd/b.f/4/39 (alt.1) = 06 mtrs. (5) packing for cab triangular window of 3 phase locos (outer) drg. no.c/els/lgd/b.f/4/38 (alt.1) =06 mtrs. (6)packing for machine room door of 3 phase drg. no. c/els/lgd/b.f/4/38 (alt.1)=12 mtrs. (7) cab door packing for wag9 locos drg.no. c/els/lgd/rc/4/17 (alt.1) = 22 mtrs. (8) packing (outer) for main door window glass of wag9 locos drg. no.c/els/lgd/rc/4/13 (alt-1) =10 mtrs. (9) main door glass packing(inner) for wag9 locos drg. no. c/els/lgd/rc/4/16 (alt-1) =10 mtrs. [ warranty period: 30 monthsafter the date of delivery ]
Tender For corrigendum : design engineering procurement, supply, installation , testing and commissioning of grid connected roof top solar photo voltaic(spv) system of capacity 3 kwp complete with inverter, mounting structure, cable, wiring etc. including all accessories, specification of roof top solar panel annexure -a attached. and government approved test certificate is mandatory. ]
Tender For a. design, engineering, procurement, supply, installation, testing & commissioning of hybrid grid connected (on grid)/battery roof top solar photo voltaic (spv) system complete with inverter ,each 1 kwp capacity, 100ah battery (lfpp), mounting structure, cables, wiring etc. including all accessories. qty of hybrid inverter including lfpp battery is 13 nos. b. supply & testing of lithium battery 12.8v, 100ah with enclosure (qty 15 nos.) for additional backup. detailed specification as per annexure a. ]
Tender For corrigendum : supply of set of rubber packing (gasket) for doors & windows of 3 phase locos set consisting of 9 items as following:- (1) modified window glass (log) packing (outer) drg. no. c/els/lgd/rc/4/11 (alt.1) =12 mtrs. (2)packing for wind screen (log inner) of 3 phase locos. drg. c/els/lgd/b.f/4/41 (alt.1) =12 mtrs. (3) gasket for window outer frame of wag9/wap7 locos (04 nos. to be supplied each of 1.75 mtrs as a single closed piece as per drg.), drg. no.c/els/lgd/rc/4/10 (alt-1) =07 mtrs. (4) packing for cab triangular window of 3 phase locos (inner) drg. no. c/ els/lgd/b.f/4/39 (alt.1) = 06 mtrs. (5) packing for cab triangular window of 3 phase locos (outer) drg.no.c/els/lgd /b.f/4/38 (alt.1) =06 mtrs. (6) packing for machine room door of 3 phase drg. no. c/els/lgd/b.f/4/38 (alt.1)=12 mtrs. (7) cab door packing for wag9 locos drg.no. c/els/lgd/rc/4/17 (alt.1) = 22 mtrs. (8) packing (outer) for main door window glass of wag9 locos drg. no.c/els/lgd/rc/4/13 (alt-1) =10 mtrs. (9) main door glass packing(inner) for wag9 locos drg. no. c/els/lgd/rc/4/16 (alt-1) =10 mtrs. clw?s approved sources.id no- 2101221 . [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of rubber packing (gasket) for doors & windows of 3 phase locos set consisting of 9 items. details of items are as following:--(1) modified window glass (log) packing (outer) drg. no. c/els/lgd/rc/4/11 (alt.1) =12 mtrs. (2)packing for wind screen (log inner) of 3 phase locos. drg. c/els/lgd/b.f/4/41 (alt.1) =12 mtrs. (3) gasket for window outer frame of wag9/wap7 locos (04 nos. to be supplied each of 1.75 mtrs as a single closed piece as per drg.) drg. no. c/els/lgd/rc/4/10 (alt-1) =07 mtrs. (4) packing for cab triangular window of 3 phase locos (inner) drg. no. c/els/lgd/b.f/4/39 (alt.1) = 06 mtrs. (5) packing for cab triangular window of 3 phase locos (outer) drg. no. c/els/lgd/b.f/4/38 (alt.1) =06 mtrs. (6) packing for machine room door of 3 phase drg. no. c/els/lgd/b.f/4/38 (alt.1)=12 mtrs. (7) cab door packing for wag9 locos drg. no. c/els/lgd/rc/4/17 (alt.1) = 22 mtrs. (8) packing (outer) for main door window glass of wag9 locos drg. no. c/els/lgd/rc/4/13 (alt-1) =10 mtrs. (9) main door glass packing(inner) for wag9 locos drg. no. c/els/lgd/rc/4/16 (alt-1) =10 mtrs. [ warranty period: 12 months after the date of delivery ]