Get complete information related to latest Ss Pipe Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Ss Pipe Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Ss Pipe Tenders.
Tender For corrigendum : dismantling and re-erection of flanged ms/sspipeline for pump#41, 47 and 48 delivery line de-scaling work at hwfl in pulp mill mechanical in tnpl unit 1
Tender For corrigendum : supply of kit for bogie piping stainless steel pipe as per drg.no. 11817513 [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of set of s.s. pipe fittings for co-co bogie piping (wag-9hc & wap-7) to set list el29230524 rev. 3, spec no. clw/ms/03/053 alt. 21 & str no. clw/2018/eldo/m/str/050 rev. 0. [warranty period: 30 months after the date of delivery ] ]
Tender For supply of oil injection pump kit for emd ta bearing puller arrangement (maximum working pressure:3000 bar, oil tank capacity: 200 ml, stroke volume:0.42 cubic cm) to be supplied with (1) high pressure sspipe: length 2 mtrs., connection: 3/4 bsp x 1/4 bsp, suitable for pressure upto 5000 bar, (2) adaptors (size ininch): 1/4 x 1/4 (bsp), 1/4 x 3/8 (bsp), 1/4 x 1/2 (bsp), ,1/4 x 3/4 (bsp), 1/4 (bsp) x 1/8 (nptf), (3) accessories: feeder bottle, pressure gauge (thread 3/8 inch bsp) & handle., make : pranam engineering, modal: oikp-3000 or equivalent. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of set of s.s. pipe fittings for co-co bogie piping (wag-9hc & wap-7) to set list el29230524 rev. 3, spec no. clw/ms/03/053 alt. 21 & str no. clw/2018/eldo/m/str/050 rev. 0. [warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : carrying out fabrication and erection of alloy steel piping work as per standard specification on labour contract basis in connection with the composite work for avu units part a for panipat refinery expansion project of iocl at panipat haryana