Web Analytics Made Easy - StatCounter

Stabling Line Tenders

Get complete information related to latest Stabling Line Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Stabling Line Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Stabling Line Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :41052977 Due date: 08 Aug, 202508 Aug, 2025 NA
Tender For earthwork, in cutting/filling, blanketing, viaduct , major bridges, minor bridge, robs, rub, protection works and other allied works between km 77.175 to km 82.869 (5.694 km) within punjab area for construction of new line from kartoli punjab to talwara block section of nangal dam - talwara new b.g. rail link.

Central Government/Public Sector

CTN :41052946 Due date: 05 Aug, 202505 Aug, 2025 NA
Tender For raising of passenger platform no.1 from rail level to high level at kanasar, bamanwali & jagdeowala stations over bikaner division along with extension to 480 mtrs. under jurisdication of aden/line/bikaner.

Central Government/Public Sector

CTN :41052960 Due date: 05 Aug, 202505 Aug, 2025 NA
Tender For trr (p) with 60 kg rail on passenger running loop line 11.463 kms in kolayat-phalodi section in the jurisdictions of aden/line/bkn

State Government

CTN :41058446 Due date: 31 Jul, 202531 Jul, 2025 1.17 Crore
Tender For dismantling of existing rail track, strengthening of track foundation of mamc stacker reclaimer and fixing of new travelling rail track in line and level at gsecl wtps.

CTN :41049348 Due date: 24 Jul, 202524 Jul, 2025 38.51 Lacs
Tender For construction of concrete road with guard wall at muraripur samir naiya house to basudebpur rail line

CTN :41038313 Due date: 30 Jul, 202530 Jul, 2025 1.54 Crore
Tender For 1)construction of road from nahorsapori pipolgos to rail line path, 2) construction of road from nh-38 to bortarani lakhi mandir under sopd-g under digboi margherita territorial road division , digboi lac in tinsukia district year 2025-26

Central Government/Public Sector

CTN :41028769 Due date: 18 Jul, 202518 Jul, 2025 14.83 Lacs
Tender For capital repair repair and overhauling of various finishing area equipment in mmsm-, repair works/replacement of protective doors., repair work of chain beam., repair works/replacement of cross feed conveyor beam, overhauling jobs/re-visioning foundation repair of fixed rollers., turning device bracket replacement., dismantling of tanks,man hole covers, pipe and flanges required manual cleaning of all sludge from the tank, filters changing gasket and seals changing for 5/2 hydraulics, piling table cylinders and racks re-visioning, retractable stopper complete re-visioning., scale pump house suction strainer cleaning, pipe clamps tightening of all the hydraulic systems and replacement wherever necessary upto 22 mm-1000nos,25 mm to 50 mm-1000 nos, above 50 mm-500 nos., complete hose changing for the mobile saw including repair/replacement of power chain, replacement of o rings on finishing hydraulic station size 200-300., clamping unit support rail alignment and strengthening (all mobile saws), all top clamping beam brackets revisioning and pins changing., re-welding of the pipe line joints in piling area approx.500 nos.of various sizes., all saws lift/lower cylinder., re-visioning, brackets repair replacement., revisioning/replacement of traveling wheels of mobile saws., removal of all the fixed rollers of lhs.saw area foundation repair, tools replacement, rollers replacement, fixing and alignment., overhauling of feeder mechanism., vertical conveyor buffer pads changing in piling/bundling section, vertical conveyor idle sprocket bearing replacement., repair of piling collecting grids., revisioning/overhauling of brakes in finishing area., clamping of all the coolers and tank cleaning of tying machines & hydraulic systems, foundation rectification of ccd., fixing of valves in hydraulic racks,, revisioning of fixed stopper., overhauling of hydraulic racks, ccd-1 & 3 shaft changing., piling platform rectification., saw area traversible stopper overhauling., fixing of hearing block stoppers on ccd beam., revisioning of limiting lever assembly., replacement of turning device magnet, rotory unit shaft changing, ccd-5 fulcrum near rotory unit replacement,

State Government

CTN :41013319 Due date: 31 Jul, 202531 Jul, 2025 35.59 Lacs
Tender For upgradation of bituminous road from sarthakpur more to rail line at sarthakpur of ward no-7 under amc.

corporations/Associations/Others

CTN :41019754 Due date: 23 Jul, 202523 Jul, 2025 3.00 Lacs
Tender For execution of contract for supply works and other works in panagudi section - normal ground- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, normal ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, rocky ground (medium)- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, rocky ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- erection of 7.32m, 7.5m, 8m, 8.23m poles, normal ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, normal ground- erection of 9m & 9.14m poles, rocky ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, rocky ground- erection of 9m & 9.14m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 9m & 9.14m poles, hard rock requiring blasting and chisseling- erection of 9m & 9.14m poles, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, normal ground- erection of above 9.14m poles & 36 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, rocky ground- erection of above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- erection of above 9.14m poles & 36 length rs joists, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, normal ground- erection of 42 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, rocky ground- erection of 42 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 42 length rs joists, hard rock requiring blasting and chisseling- erection of 42 length rs joists, transporting of poles from road side to pole pit upto 2km - 7.32m, 7.5m, 8m, 8.23m rcc pole, transporting of poles from road side to pole pit upto 2km- 9m, 9.14m rcc/psc pole, transporting of poles from road side to pole pit upto 2km - rsj 36 pole, transporting of poles from road side to pole pit - rsj 42 and above, loading and unloading of poles - 7.32m, 7.5m, 8m, 8.23m rcc pole, loading and unloading of poles - 9m, 9.14m rcc/psc pole, loading and unloading of poles - rs joists, tubular & rail pole (above 9.14m), concreting of poles as per board standards (2*2*5). the materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing transporting of sant,jally,from box and water curing for 14 days etc,.complete), coping of pole (0.6m*0.6m*0.35m), concreting of stay (o.3m * 0.3m * 1.5m) including materials, coil earthing per pole & pole earthing, normal ground- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), normal ground- erection of stay set, rocky ground (medium)- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), rocky ground- erection of stay set, hard rock requires blasting & chisseling- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), hard rock requires blasting & chisseling- erection of stay set, loading and unloading charges of oil drums (with oil), loading and unloading charges of oil drums (without oil), loading and unloading charges of conductor drum, cable drum, loading and unloading charges of line materials, loading and unloading charges of metering set, 11kv lines-(pin point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to site

corporations/Associations/Others

CTN :41019757 Due date: 23 Jul, 202523 Jul, 2025 2.00 Lacs
Tender For execution of contract for supply works and other works in ittamozhy section - normal ground- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, normal ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, rocky ground (medium)- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, rocky ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- erection of 7.32m, 7.5m, 8m, 8.23m poles, normal ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, normal ground- erection of 9m & 9.14m poles, rocky ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, rocky ground- erection of 9m & 9.14m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 9m & 9.14m poles, hard rock requiring blasting and chisseling- erection of 9m & 9.14m poles, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, normal ground- erection of above 9.14m poles & 36 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, rocky ground- erection of above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- erection of above 9.14m poles & 36 length rs joists, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, normal ground- erection of 42 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, rocky ground- erection of 42 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 42 length rs joists, hard rock requiring blasting and chisseling- erection of 42 length rs joists, transporting of poles from road side to pole pit upto 2km - 7.32m, 7.5m, 8m, 8.23m rcc pole, transporting of poles from road side to pole pit upto 2km- 9m, 9.14m rcc/psc pole, transporting of poles from road side to pole pit upto 2km - rsj 36 pole, transporting of poles from road side to pole pit - rsj 42 and above, loading and unloading of poles - 7.32m, 7.5m, 8m, 8.23m rcc pole, loading and unloading of poles - 9m, 9.14m rcc/psc pole, loading and unloading of poles - rs joists, tubular & rail pole (above 9.14m), concreting of poles as per board standards (2*2*5). the materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing transporting of sant,jally,from box and water curing for 14 days etc,.complete), coping of pole (0.6m*0.6m*0.35m), concreting of stay (o.3m * 0.3m * 1.5m) including materials, coil earthing per pole & pole earthing, normal ground- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), normal ground- erection of stay set, rocky ground (medium)- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), rocky ground- erection of stay set, hard rock requires blasting & chisseling- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), hard rock requires blasting & chisseling- erection of stay set, loading and unloading charges of oil drums (with oil), loading and unloading charges of oil drums (without oil), loading and unloading charges of conductor drum, cable drum, loading and unloading charges of line materials, loading and unloading charges of metering set, 11kv lines-(pin point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to sit
 Loading, Please wait...

Connect us via What's Up