Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of
Tender For auction sale of depot ferrous scrap - pl no: 98050126. condemned and unserviceable ferrous melting scrap consisting of side buffer plungers, buffer casings with/without spindle, knuckles and coupler yoke for cbc,end shields,control arms,connecting rods, axle boxes, axle box housings with or without original attachments, bmbc components ,side bearer covers,gear wheels of sizes ,screw couplings and its link parts, bearing cover casings,grease collors,tensioning rods,anchor links with or without silent blocks, brake shoes with or with out brake blocks, draw hooks, draw beams,draft keys,iron pulleys, pipes of sorts and sizes, spacers,sims,washers, bolts,nuts, studs,pins, brackets,brake shoe keys, metal rings, rods of sorts and sizes, cotter pins, full/broken coil springs, hanger blocks, iron balls of roller bearings and its inner and outer spacers, huck bolts,huck bolt tails , ms plate cuttings, traction motor end shields, end locking screws ,bearing racers, locking plates, bearing adapters,valves of sorts and sizes , brake rigging components, ctrb bearings and its components, connecting rod assemblies, buffer plunger full assemblies , valve springs , buffer spindles, axle box covers, angle cut pieces , main bearing caps, connection straps, cam shaft parts, cut off angle cocks, bss hanger pins, pull rods,damper brackets,center pivot top and bottom parts,cbc couplers,compensating beams,bearing housings/axle box caps, transmission bars, right angle gear covers, cr tanks,traction motor components , vibration dampers, gate valves, isolating valves, ball joint traction lever,tm motor ip cores,cooler headers,roll links,traction centers, liner sleeves,air duct assemblies,brake headers, and other similar items melting in nature.note: 1] crane loading is permitted. 2] if any non ferrous items found, should be removed and returned to railways by the purchaser.
Tender For corrigendum : supply of pump spare parts like shaft sleeve etc c c - 1800001175 o ring nit.rubber for 125 hp pump wilo make , 1800001176 sleeve nut r wilo make , 1800001177 sleeve nut lh wilo make , 1800001178 bearing housing lh wilo make , 1800001179 bearing housing r wilo make , 1800001180 bearing end cover lh wilo make , 1800001181 bearing end cover r wilo make , 1800001182 stuffing box bush ci wilo make , 1800001183 logging ring bb wilo make , 1800001184 shaft sleeve 125 hp pump wilo make , 1800001185 shaft 125 hp pump wilo make , 1800001186 neck ring bb wilo make , 1800001187 locking washer ms wilo make , 1800001188 lock nut ms wilo make , 1800001189 impeller key ss410 30hp pump wilo make , 1800001190 sleeve nut r ss410 30 hp pump wilo make , 1800001191 sleeve nut lh ss410 30hp pump wilo make , 1800001192 bearing housing thrust end ci for 30 hp wilo make , 1800001193 bearing housing coupling endci for 30 wilo make , 1800001194 bearing end cover thrust end ci for 30 wilo make , 1800001195 bearing end cover coupling end ci for wilo make , 1800001196 logging ring bb wilo make , 1800001197 stuffing box bush ci 30 hp pump wilo make , 1800001198 shaft sleeve 30 hp pump wilo make , 1800001199 shaft ss 410 30 hp pump wilo make , 1800001200 neck ring bb 30 hp pump wilo make , 1800001201 locking washer ms 30hp pump wilo make
Tender For supply of tr 15 , valve body tractor , self screw , ms sheet 4 ft x 8 ft x 3.5 mm , ms sheet 4 ft x 8 ft x 1.75 mm , patta bolt , screw jipson 50 mm , screw jipson 75 mm , screw jipson 100 mm , bed switch 05 amp , hexa blade , hub 30209 , valve body advs , cooler pad small , cooler pad large , cooler pump large copper , cooler pump small copper , pvc pipe 1 by 2 inch roll of 30 mtr , plug top 15 amp , plug top 05 amp , motor shaft bush for cooler motor , flexible wire 40 by 76 copper , mcb 32 amp with box , mcb 63 amp with box , mcb 63 amp with double pole , cable aluminium 4 core 10 mm , gloves electric , capacitor 08 mfd , capacitor 10 mfd , capacitor 25 mfd , nut and bolt for rotavator , dustbin with lid , pvc clip 3 mm pkt of 100 , pvc clip 5 mm pkt of 100 , pvc clip 10 mm pkt of 100 , pvc clip 25 mm pkt of 100 , pvc clip 50 mm pkt of 100 , plastic sutli
Tender For e-quotation for seeking firm rates for non-schedule items for preparing estimates. - s/i/t/c of new 80 hp vt pump set, supplying,installation,testing and commissioning of vt pumpset (confirming to is1710:2021 standards) with 35 ft suitable size ms column pipe assembly in random length of 5 ft.(make-jyoti/wpil/kirloskar) with ss/bronze impeller capable to discharge 216 m3/h against a total head of 68m coupled with vertical solid shaft tefc ie3,ip55 type squirrel cage induction motor (make-siemens/crompton/abb) operating on 3 phase 50 hz,415v+- 10% supply and having speed 1400-1500 rpm (bhp of motor should be 10% more than that of pumpset including cost pof supplying,fitting and fixing of all required accessories, repairing of 80 hp vt pump set at raw water, supplying all labour tools and tackles for taking out the 40hp vt pump set with bowl assembly, column pipe and line shaft etc., cost towards dismantling of complete bowl assembly., cost towards repairing and fitting the parts of vt pumpset as per requirement (works as complete overhauling of the pump) such as:-1.machining/lathe work 2.changing ss top shaft,line shaft(2 nos of 5 feet) of and bottom shaft2.repairing of bowl assembly and impleller3.supplying and fitting c.l spider bearing with rubber cut less bush-4nos4.supplying and fitting of worn-out nut-bolts,bolt-nut washer,gland body bush machining,other machining works,etc as per requirement, complete assembling the pump set and lowering including supplying all petty materials., cost for supplying and installation of required accesories for repair and maintenance of motor control panel such as:-150 amp contactor-2 no (for 1 no starter)160 amp,breaking capacity -36ka mccb 1 no56-90 a electronic overload relay-2 nostimer-2 nosvolt meter 1 nosamp motor 1 nospilot lamp 6 nosselector switch 4 nossingle phase preventer 2 nos[ all accessories of reputed make]with complete internal wiring with suitable size of copper wire and testing on load., repairing of 30hp c/f pump sets at clear water, cost for dismantling of 30 hp c/f and pump inspection,changing of its damaged parts such as:-key-01 no, gland tightner -1 set, gland tightner stud-2 nos, c.i bearing housing with cap -1 set, ball bearing 6306 (skf)-2 nos, grease, gland packing,maching of the pump parts as per required etc all complete and testing on load etc., cost towards complete repairing of motor control panel starter 30hp cf pump set opening and changing of damaged parts such as 1.mccb - 50 amp,25ka,3pole-2 nos (for motor backup protection),mccb -100 amp,50ka,3pole-1 no (main mccb)2.overload relay 26-40 amp-1no3.star delta timer-1no4.digital volt meter,ampere meter,three pahse indicator lamp,push button on/off,on/off/trip indicator,wiring,etc as per required, repairing of 15hp c/f pump sets at clear water, cost for dismantling of 15hp c/f and pump inspection,changing of its damaged parts such as:-key-01 no, gland tightner -1 set, gland tightner stud-2 nos, c.i bearing housing with cap -1 set, ball bearing 6306 (skf)-2 nos, grease, gland packing,maching of the pump parts as per required etc all complete and testing on load etc., cost towards complete repairing of motor control panel starter 30hp cf pump set opening and changing of damaged parts such as 1.mccb -25 amp,15ka,3pole-2 nos (for motor backup protection),mccb -50 amp,25ka,3pole-1 no (main mccb)2.overload relay 20-25 amp-1no3.star delta timer-1no4.digital volt meter,ampere meter,three pahse indicator lamp,push button on/off,on/off/trip indicator,wiring,etc as per required