Get complete information related to latest Stator Coil Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Stator Coil Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Stator Coil Tenders.
Tender For corrigendum : supply of lt circuit breaker at vindhyachal and allahabad substation e e - supply of 415v 3400a 75 ka 3-pole ac lt air circuit breaker and accessories for retrofitment as per attached ts and sow , retrofitment kit with copper bus thickness 8mm width 10cm for supplied acb , retrofitment of new lt air circuit breaker in acdb including dismantling of old circuit breaker , spring charging motor , aux. contact sets , bus bar seal off insulators , arc-chutes , moving contacts , arcing contacts fixed moving , springs closing opening , closing coil with resistor , tripping coil with resistor , supply of 415v 1000a 3-pole ac lt air circuit breaker and accessories for retrofitment as per attached ts and scope of work , supply of 415v 800a 3-pole ac lt air circuit breaker and accessories for retrofitment as per attached ts and scope of work
Tender For corrigendum : supply of spares of prabhu make ht starters for mcl basundhara area : : 5 =5 = - isolator 630a 6 point 6kv on off earth , isolator fixed contact set of 3 , isolator moving contact set of 3 , vaccum contactor 400amp 6 point 6kv grade , diode by255 for vacuum contactor , bottle f vcum cntctr 400amps 6 point 6kv , vacuum contactor closing coil 110v dc , auxiliary switch for vacuum contactor 2n , auxiliary contactor 3no and 1nc 110v , dmc mldd 6 point 6kv insltr fuse , earth leakage relay 30ma 3a w time delay , p t 50va pri 0 110v sec 0 8 12v , ammeter 96sq mm , ammeter selector switch , voltmeter 96sqmm , voltmeter selector switch , push button with element for start sto , lamp holder with lamp on off trip , timer electronics 3sec to 3min on delay , relay overvoltage and undervoltage
Tender For 1)inspection of statorcoil for identification of exact no. of the faulty coil and setting up the arrangements for rotor pole coils removing and rotation as per scope of works along with supply of materials and other consumables as per scope of works2)de-brazing the rotor pole terminations and removing the rotor poles (as required). dismantling of rotor poles using suitable and compatible tools, fixtures, and lifting arrangements. ensure safe handling and proper marking for reassemble. rotate and position the rotor appropriately to access the damaged statorcoil area.3)remove insulation from both ends of the affected winding section.4)de-brazing of defective coils. 5)driving out the slot wedges carefully remove wedges from stator winding slots without damaging adjacent coils or core.(entire stator winding shall be inspected in case of loose wedges, worn out wedges and missing wedges shall be replaced) along with supply of materials and other consumables.6)insulation removal- remove insulation from both ends of the affected winding sections.7)cutting the coil bindings in both sides. cut the identified damaged winding portion using appropriate tools. carefully pull out the damaged coil from the stator slots without affecting surrounding windings.8)damaged winding cutting- cut the identified damaged winding portion using appropriate tools.9)winding extraction- carefully pull out the damaged coil from the stator slots without affecting surrounding windings. while removing the faulty coils from stator, utmost care should be taken to prevent any damage to stator core.10)removal of faulty coils from the slot.11)slot cleaning and preparation-clean stator inner tooth slots thoroughly. use emery paper to smoothen and maintain uniform slot condition.12)cleaning of carbon deposits/heavy oil content from complete statorcoils through co2 cleaning process /dry ice blasting.13)new coil installation-insert new statorcoil with proper alignment. fix securely using new wedges of appropriate grade and size.14)brazing of the coil ends.15)re-fixing the rotor poles and connecting them.16)insulation application-apply insulation as per specified class (e.g. class f/ classh). ensure proper curing and finishing.17)complete co2 / dry ice cleaning of stator and rotor.re insertion of removed rotor poles. 18)final checks & testing- insulation resistance (ir) test, high voltage (hvdc) test, continuity check, visual inspection and any other tests which are required (will be carried out by kpcl).19)assembling of removed damper doors and stator covers.20)maintain quality standards throughout the process & use calibrated tools and approved materials.21)presence of the agency during excitation and synchronization of the unit by kpcl.22)safety & quality-follow all safety procedures and ppe requirements
Tender For supply of high rate discharge battery cell tester (i) range = 2.5 - 0 - 2.5, volts (ii) accuracy + 2.5% of f.s.d, (iii) permanent magnet moving coil type of dc volt meter with center zero scale of 60 divisions and external zero adjuster (iv) sensitivity 1000 ohms per volt. [ warranty period: 30 months after the date of delivery ]
Tender For supply of ''ammeter for traction motor moving coil type dc ammeter 144 x 144 mm on scale side and 135 x 135 mm on body side 90- degree deflection.range 0-1000 amp fsd 75 mv.confirming to is 1248(1983). conforming to is 1248(1968),model m-144 of ]
Tender For supply of set of moving coil meters for wag-9/wap-7 loco as per sketch no.wcr-tkd-el/4-sk-040(03 items 12 nos.) [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of set of moving coil meters for wag-9/wap-7 loco as per sketch no.wcr-tkd-el/4-sk-040(03 items 12 nos.) [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of kv meter self illuminated flush type moving coil ac voltmeter with inbuilt rectifer with metal clamp and shock proof rubber gasket to range 0-170 volts to be graph 0-30kv with suitable calibration as 140 v showing 25 kv. size 96 x 96 mm accuracy +/- 1.5% to is : 1248/1968 or latest. [ warranty period: 30 months after the date of delivery ]