Tender For corrigendum : providing of custom bid for services - replacement of tubes of the esp boilers(sulphur condenser boiler and process gas cooler boiler)
Tender For repairs of flue gas duct (aph outlet and to esp inlet) at the boiler of unit- 2 including t@p and consumables during the running and annual overhaul period 2025-26
Tender For break-down and running maintenance works for aluminum sheet and insulation for ducts (all elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the period from 01.04.2025 to 31.03.2026 for unit-1 boiler including t&p and consumables
Tender For break-down and running maintenance works for aluminum sheet and insulation for ducts (all elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the period from 01.04.2025 to 31.03.2026 for unit-ii boiler including t&p and consumables
Tender For hydrogen cylinders loading and unloading transportation of hydrogen cylinders from stores to unit gas rooms of units-1 and 2 scheduled greasing of all ht and lt motors pertaining to electrical division id fd pa mills coal feeders air pre heaters esps etc of boiler division vacuum pumps dmcw pumps etc of turbine division and ash slurry pump house pumps clarifier pump house pumps ash water pump house pumps raw water pump house pumps of cam division as and when required during the year 2025-26
Tender For break-down and running maintenance works for screwing of existing insulation sheets, repairs to insulation & cladding sheet for ducts (all elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the period 2025-26 for unit-3/ stage-ii boiler including t&p and consumables
Tender For overhauling of flue gas damper assembly of aph inlet/primary air/secondary air, servicing of esp inlet gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the capital overhauling of unit6 of 2x250mw
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - partial replacement of platen super heater, finalsuper heater and economizer tubes and pipe lines (ibr approved) of boiler no.1along with liasioning of boiler no.1 of steamgenerationplant, rcf ltd. (trombay unit)