Get complete information related to latest Steel Drum Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Steel Drum Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Steel Drum Tenders.
Tender For auction sale of nicrome steel scrap,aluminium t b,aluminium dross,un servicable steeldrum,transformer oil use waste,steel scrap class c t and b mixed,steel scrap - a trim steel cc,card board scrap
Tender For supply of machinery oil r/brand, packed in 210 ltrnon-returnable new steeldrum. iocs= servo system hlp-46 hpcs= enklo hlp-46 bpcs= hydrol hlp-46 as per drg.no. nil alt nil [ warranty period: 30 months after the date of delivery ]
Tender For auction sale of steeldrum empty 205/210 litre capacity,oil waste contaminated (as is where is basis),mixed waste of used oil, mud, water, burned metal/scale & sludge etc,damaged g.i. body of unserviceable drinking water coolers etc.,copper scrap turning and boring approx copper 99.5%,oil used in machine (unserviceable),rusty billets different sizes
Tender For auction sale of old & used 12 v-180 ah battery,old & used aph basket and elements,empty steeldrum (size=200lit),empty steeldrum (size=20lit),empty plastic drum (size=50lit),old & used wastage tyres of scrap vehicles & spares parts etc,old & used flexible hose pipe, parts of mccb 250a etc,old wooden boxes
Tender For enamel gentian blue shade ral-5010 packed in new steeldrums plain ( non- returnable) 20 ltrs capacity. confirming to is:8662/2004 ( second rev.) with additional requirement of icf/md/spec.045 issue status.02 (rev. no.03) rdso amnd.no.81 (rev.0) for pigment content. supply should bemade along with material safety data sheet. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : testing of safety valve installed at boiler side on boiler drum, water separator equalizing line, main steam line, cold reheat line (crh), hot reheat line(hrh) and soot blower station by online valtest method for boiler unit 1 and 2 ph-1 and 3 and 4 - testing of safety valve installed at boiler side on boiler drum, water separator equalizing line, main steam line, cold reheat line (crh), hot reheat line (hrh) & soot blower station by online valtest method for boiler unit 1 & 2 at 2x600 mw and unit 3 & 4 at 2x660 mw, sstpp, mppgcl, dongalia.