Get complete information related to latest Steel Items Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Steel Items Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Steel Items Tenders.
Tender For procurement of steelitems ms plate, channel and ms angle on for kagithapuram basis - procurement of steelitems (ms plate, channel & ms angle) on f.o.r. tnpl kagithapuram bais.
Tender For supply of soft broom plastic , vim liquid dish wash 500 ml , red harpic , gas bag small , gala super mop refill , brasso 500 ml , liquid soap , scrapper steel wire , scrapper hard sponge , gas bag large , ncml solution , roller refill 4 , brush 2 , lysol , hand wash liquid , wiper soft with handle , wax for floor shinning , deck washing brush , plastic broom with handle , broom long handle , rope black 4mm , phenyl
Tender For supply of steelitems at kollam 40mt - angle equal ms is 226/2062 size:50 x 50 x 6 mm-length shall be approximately 6 meteres(make:sail/jsw/jindal/vizag/tata), beam ismb is 226/2062 size:250 x 125 mm (make:sail/jsw/jindal/vizag/tata), channel ismc is 206/2062 size: 200 x 75mm(make:sail/jsw/jindal/vizag/tata), plate ms is 2062 size:10 mm thick make:sail/jsw/jindal/vizag/tata,
Tender For supply of purveying oblice upkeeping of covered detachable frames at ge ep jodhpur , required hollow tail section 50 x 30 mm , required hollow tail section 20 x20 mm , required cold rolled mild steel wrinkle free prickled sheet 0 ponit 8mm thick , required other mild steelitems , required cold rolled 01 mm thick wrinckle free mild steel sheet , required red oxide metal primer , required og metal paint , required thinner , fabrication of detachable frame complete with welding rods and labour , complete paints with paints tools and labour
Tender For corrigendum : supply of purveying upkeeping of detachable frames 12 nos : : - purveying oblice upkeeping of detachable frames at ge ep jodhpur , required hollow tail section 50 x 30 mm , required hollow tail section 20 x20 mm , required cold rolled mild steel wrinkle free prickled sheet 0 ponit 8mm thick , required other mild steelitems , required red oxide metal primer , required og metal paint , required thinner , fabrication of detachable frame complete with welding rods and labour , complete paints with paints tools and labour
Tender For custom bid for services - miscellaneous machinery jobs for vessel ma ganga-i 20 fireline mains are to be pressure tested. the relief valve is to be overhauled and pressure tested, and the results are to be shown to the irs/mmd/iwt surveyor. leaky joints are to be renewed with new joints if required. all damaged fire line clamps are to be renewed as per the recommendation of irs/smpa. satisfactory trials is to be given with 02 nos fire hoses in fwd & aft in front of the surveyor. , 1 20.a in-situ pressure testing of fire line pipes up to 100nb 100 mtrs, 2 20.b supply of fire hose-65mm dia 18mtr length 2 nos, 3 20.c remove,refit ,overhaling & pressure testing of relief valve 1 nos, 4 20.d renewal of clamp support 50 nos, 5 20.e new sealing rings are to be provided in all fire hydrants 10 nos, 6 21 "emergency fire pump: pump is to be overhauled. suction (steel pipe size 62mm od short bend,610mm length), and delivery bend (steel pipe size 62mm od short bend with one side threaded 65mm od,610mm length), reducer, suction filter and hard polymer pipes (62mm id 75mm od, suction 12 mtr approx.) are to be renewed., *all spares for pump overhauling will be supplied by smpa." 1 l.s., 7 42 "hydrophore and air bottle: main air bottle fwd and aft outlet cocks (2 nos.) are to be renewed. safety/relief valves are to be renewed. sea water and fresh water hydrophore air charging cocks are to be renewed., **all material contractor supply" 1 l.s., 8 53 "insulation covering and netting is to be removed from the exhaust pipes for main engines and auxiliary engines for surveyors inspection and to be fitted back with new insulation and netting., **all material contractor supply, " 50 per running mtr., 9 54 "air compressor system both air bottle valve found leaking, same are to be renewed. air compressor (specification: tyco, wp-125 psi, tp--210 psi) is to be overhauled and satisfactory trial is to be shown to smpa., *** all spares smpa supply." 1 l.s, 10 55 "exhaust chimney of officer's & crew galley is to be serviced., **all material contractor supply" 2 nos., 11 3 "regarding blowers ( motors 4.1kw/5.5 hp) e/r 2 nos.. supply blower,1 no. e/r exhaust blower on boat deck (aft), its foundation & trunking is to be removed from place for cleaning, including closing arrangement. blower motor is to be overhauled. after proper alignment and balancing all blowers and trunkings, the same are to be fitted back in place. blower bottom water extraction passages are to be made. , *all material contractor supply" 3 per blower, 12 4 "regarding 2 nos.toilet exhaust blowers (motors 3 h.p.-crew and officers' toilet), their foundation & trunking is to be removed from the place for cleaning, including closing arrangement. blower motor is to be overhauled. after proper alignment and balancing all blowers and trunkings,same are to be fitted back in place. blower bottom water extraction passages are to be made. , *all material contractor supply" 2 per blower.