Get complete information related to latest Steel Safe Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Steel Safe Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Steel Safe Tenders.
Tender For supply and installation of mild steelsafety grill for outdoor unit of 1.5 tr split air conditioners , supply & installation of 3 track aluminum frame sliding window
Tender For tender for supply of soil investigation : : - mobalisation of necessary eqpt and man power to the project site and dismantling of the same of completion of field work from the site , provision of two bore hole of 150 mm dia in any type of soil upto max 10 mtr or upto refusal n 100 whichever meet first conducting standard penetration test as per is 2131 1981 reaffirmed 2016 test shall be made at not more than 1 50 mtr interval or on change of strata whichever is less , conducting following lab test on bore collected soil sample i direct triaxial shear test ii grain distribution curves & pattern in bore holes iii bulk density iv natural moisture content v dry density vi water table vii specific gravity viii atterberg limit ix hydrometer analysis x liquid & plastic limit xi swelling index , collection of lab test data calculation of gross and net safe bearing capacity and preparation of report on minimum 80 gsm a4 size white paper duly spiral bound in quintuplet duly vetted by any iit nit vetting shall not be in the personal capacity of the professor for foundation report shall recommend type of foundation and sizes at different depths below ngl including size gross and net safe bearing capacity , i photographic record of geo exploration as well as testing shall also part of the report ii recommendation as regards possibility of liquefaction of soil in case of saturated or partially saturated loose uncompacted sandy soil iii swelling index and swelling pressure in respect of black cotton soil and its depth layer if any iv depth of gr water table gwt in peak mansoon lowest and peak summer highest after correlation of result with seasonal of water table in the station v recommendation for filling under floors vi rl of ground level foundation level with ref to a bm should invariably be mentioned in the soil investigation report
Tender For corrigendum : supply of orv sagar nidhi ship modifications for integration of lars 80swl : - as per deliverables stage 1 indicated at scc , receipt of new lars from niot oem and safe storage at shipyard premises as specified in the scope of work, stage 2 point f , removal of the existing a frame onboard ship incl. of two hyd. cylinders, pistons, foundation and existing deep sea winch. handing over the two items to niot nominated contractor with full docs , modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class irs and dnv in dry dock , completion of intgr of lars by successfully completing of inst comm and hat of new lars onboard ship alongwith oem necessary support for sat will be carried out by niot and oem , cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 tons , all risk insurance for new lars and from date of receipt at shipyard till successful completion of hat and sat all risk insurance for the ship, people, niot property during drydock period as per nit
Tender For custom bid for services - operational enabling activities in chp of cob#1-5 complex; 1) section operational activities in tippler for running shifts scope of job involves 1. wagons are to be placed in md1 (for tippler#1) and md2 (for tippler#2) t hrough a capstan winch (maximum 7 wagons) by means of hook fixing, deco upling, and winch operation, after placement of wagons by the traffic dep artment, for unloading in both tippler#1 and tippler#2. 2. after tippling, the empty wagons shall be shifted to a safe distance fro m tippler#1 and tippler#2 with the help of the empty side winch. 3. the first empty wagon on the empty side shall be decoupled and then co upled with the subsequent empty wagon pushed from both tippler#1 and ti ppler#2. the process of decoupling and coupling with the subsequent wag on shall continue until the completion of wagon unloading in both tipplers. 4. checking and cleaning of all underground equipments like (raf1 &raf2), belt conveyors, chutes and pitpumps at the beginning of each shift and per iodically to avoid any breakdowns. 5. periodical checking and cleaning of chutes during unloading from tippl er section to coal yard. 6. gate changing and diversion of belt routes as rquired for operation up to coal yard. 7. sample collection for labaratory purpose as per instruction of executi ng officer/chargeman. unit of measurement is "each". each is defined as the scope of job mentione d done in tippler section of old coal handling plant of coke ovens in a day, 2) scope of job involves 1. checking and cleaning of all belt conveyors, chutes, weigh feeders, and pit pumps of the blending section in both mt and expansion side shall be ca rried out at the beginning of each shift and periodically during the shift t o avoid chute jamming and ensure proper coal feeding to the service bunke 5 / 25 rs. 2. close monitoring of the discharge from weigh feeders shall be ensured as per the prescribed blend ratio, and air blasters shall be operated imme diately in case any weigh feeder is not discharging. 3. blending has to be stopped if any of the weigh feeders is not dischargin g even after operating air blasters and the same to be informed to concer ned shift incharge. 4. checking and cleaning of all belt conveyors, chutes and trolleys of all the service bunkers at the beginning of shift and periodically. 5. operation of trolleys of the service bunkers and communicate with elbd s after positioning of trolley for coal feeding. 6. gate changing and diversion of belt routes of service bunker s as rquir ed for operation. unit of measurement is "each". each is defined as the scope of job mentione d done in blending section in mt & expansides of old coal handling plant o f coke ovens in a day. the jobs are continuous in nature and shall be carried out round-thecloc k in three running shifts (a,b &c) the tenderer shall take up all works whi ch are specifically mentioned as per requirement in special terms and cond itions and also all facilitating activities which are necessary to maintain and ensure normal production..