Get complete information related to latest Stop Actuator Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Stop Actuator Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Stop Actuator Tenders.
Tender For annual rate contract on proprietary basis for servicing and supply of spare parts for emerson eim and biffi make actuators for nrpl region - gst % for the tender please select the rate of gst in cell ay13. rate selected shall be applicable for the entire boq., arc on proprietary basis for servicing and supply of spare parts for emerson (eim & biffi) make actuators nrpl region, speed magnetic card assembly part no.4800000211, terminal board part no.4800000m30, power card part no.494pow1020, local interface part no.4800000010, encoder icon 3000 part no.4800003000, processor card icon 3000 part no.494con3301, processor card icon actuator part no.494con3201, position sensor part no.4800000020, bearing kit icon 010 part no.bearingkit010, worm wheel part no.3800100050, worm shaft part no.3800300060, return spring manual control lever part no.3800100091, lever assembly icon 010 part no.4800100150, finger assembly icon 010 part no.4800100180, seal kit icon 010 part no.480010ksl1, worm wheel part no.3800200050, worm shaft part no.3800200060, manual return spring part no.3800200092, lever assembly icon 020 part no.4800200150, finger assembly icon 020 part no.4800200180, seal kit icon 020 part no.480020ksl1, bearing kit icon 020 part no.bearingkit020, bearing kit icon 030 part no.bearingkit030, worm wheel part no.3800300051, worm shaft part no.3800300061, spring part no.3800300090, lever assembly icon 030 part no.4800300150, finger assembly icon 030 part no.4800300180, seal kit icon 030 part no.480030ksl1, electric motor sm11 part no.480sm11100, electric motor sm15 part no.480sm15100, electric motor sm16 part no.480sm16100, electric motor sm21 part no.480sm21100, electric motor sm22 part no.480sm22100, electric motor sm23 part no.480sm23100, electric motor sm31 part no.480sm31100, mcm cover assembly part no.p/n-84832, emerson tec2 4:1 conversion kit, emerson tec2 1:1 conversion kit, act spares itc/service - panipat- 9250, act spares itc/service - panipat- 9260, act spares itc/service - karnal- 925g, act spares itc/service ambala 9269, act spares itc/service nabha 925c, act spares itc/service sangrur 9254, act spares itc/service bhatinda 925h, act spares itc/service jalandhar 926c, act spares itc/service roorkee 9267, act spares itc/service najibabad 9265, act spares itc/service una 9268, act spares itc/service bijwasan 9260, act spares itc/service meerut 9264, act spares itc/service mathura 9262, act spares itc/service agra 9261, act spares itc/service bharatpur 9263, act spares itc/service rewari 9259
Tender For supply of materials as per the technical specifications given in the work order.shifting of material to work place.inspection of material in presence of indenter.power off the existing system, isolation & removing of existing seal steam control valve hydraulic actuator assembly and shifting to designated area (stores.replacing the new electrical actuator system in the existing location, ensuring of all power, signal cables and power on the system.calibration of electrical actuators and operation shall be carried out locally and from dcs (control room) and feedback shall be ensured.it is the complete responsibility of the firm to execute the job & to bring back the system in to operation without time delay.any additional spares, tools required for carry out the above work shall be contractor/supplier scope.power and signal cable will be supplied by kpcl and cable laying is in contractor scope.the necessary tools, tackles, instruments etc. required for commissioning, testing/ checking the healthiness of the system has to be arranged by the supplier.it is the complete responsibility of the contractor to see that total system shall be commissioned without delay & should function smoothly.any additional sparesitems/tools required to execute the work shall be suppliers scope. additional mechanical civil works shall be included in contractor s scope. single point responsibility of the supplier to execute the job without latching delay.during the warranty/ guaranty period the supplier have to replace any no. of defective spares with good ones (new items) at free of cost, required for smooth functioning of the system. hence you are informed to arrange for new items immediately without any delay.the bidder shall arrange to submit 02 sets of operation and maintenance manual along with approved drawings.the scope is of retrofit/enhancement feature for existing system. hence, it is the responsibility of the contractor to visit the site and study the existing arrangement of the electrical actuator to be retrofitted.integrated site acceptance test for supplied electrical actuator shall be demonstrated to kpcl & mutually acceptance of the same.if any additional materials required for completion of work, the bidderhave to supply and system shall be commissioned with minimum down time.