Tender For the work consist of chipping plastering,excavation pcc and rcc work for column footings,gi structural work with pvc roofing sheet, plastering and scaffolding works
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; scaffolding jobs in sgp at rcf thal; as per scope of work
Tender For supply of the materials of nrlm shed work at halagi gp under mgnrega scheem - tmt bars fe 500halagi gp nrlm shed work site, portland cementhalagi gp nrlm shed work site, vitrified tiles 600x600 mmhalagi gp nrlm shed work site, ceramic tiles 30 x 30 cmshalagi gp nrlm shed work site, glazed tiles 300x450halagi gp nrlm shed work site, reeded glass 2 mm thickhalagi gp nrlm shed work site, white cementhalagi gp nrlm shed work site, border tiles 30 x 10 cmshalagi gp nrlm shed work site, brickhalagi gp nrlm shed work site, solid concrete blocks (40 20 20 cms) 5.00 n sqmmhalagi gp nrlm shed work site, name boardhalagi gp nrlm shed work site, pvc pipe of 10kg or cum,110 mmhalagi gp nrlm shed work site, pvc pipe of 6kg or cum,63 mmhalagi gp nrlm shed work site, pvc pipe of 4kg or cum,75 mmhalagi gp nrlm shed work site, polythylene pipes high density 32mm external diahalagi gp nrlm shed work site, tw beading for fixing glasshalagi gp nrlm shed work site, casurina poles 100 - 150 mmhalagi gp nrlm shed work site, add brush, putty, glue at 5% on cost of painthalagi gp nrlm shed work site, add brush, putty at 5% on cost of distemper primerhalagi gp nrlm shed work site, add brush, putty, sand paper at 2% on cost of painthalagi gp nrlm shed work site, add brush, putty, sand paper at 3% on cost of painthalagi gp nrlm shed work site, add white cement for pointing at 2% on materialhalagi gp nrlm shed work site, add white lead paint, gasket, cement, sand for making good the wall and floor at 2% on materialhalagi gp nrlm shed work site, handling loading and unloading 3% on materialhalagi gp nrlm shed work site, labour charges for lifting and placing in position and making connection at 7% on materialhalagi gp nrlm shed work site, add 5% for fittings and wastage chargeshalagi gp nrlm shed work site, add cement sand and grit 1% on materialhalagi gp nrlm shed work site, labour charges for handing errection of rcc rings etc.at 5%halagi gp nrlm shed work site, transportation charges of materials beyond 5 km at 10%halagi gp nrlm shed work site, add handling , loading and unloading at 1% on materialhalagi gp nrlm shed work site, add cutting and other wastage 5%halagi gp nrlm shed work site, add providing and removing scaffolding at 3% on labourhalagi gp nrlm shed work site, add wire brush, fine steel wool, putty, sand paper, at 3% on cost of painthalagi gp nrlm shed work site, add handling , loading and unloading at 2% on materialhalagi gp nrlm shed work site, add watering charges at 1 % on labourhalagi gp nrlm shed work site, add watering charges at 1 % on materialhalagi gp nrlm shed work site, distemper primerhalagi gp nrlm shed work site, enamel painthalagi gp nrlm shed work site, polyenthylene water storage tank of specified capacity lhalagi gp nrlm shed work site, ready mix primer paint (ready mix red lead paint)halagi gp nrlm shed work site, dry distemperhalagi gp nrlm shed work site, water proofing cement painthalagi gp nrlm shed work site, binding wirehalagi gp nrlm shed work site, plasticizer / super plasticizerhalagi gp nrlm shed work site, whiteninghalagi gp nrlm shed work site, fabrication charges.halagi gp nrlm shed work site, cost of 6.5mm m.s. coilhalagi gp nrlm shed work site, z sectionhalagi gp nrlm shed work site, mullion sectionhalagi gp nrlm shed work site, t sectionhalagi gp nrlm shed work site, mixer (concrete small used in culvert)halagi gp nrlm shed work site, s or p 100mmk traphalagi gp nrlm shed work site, indian type water closet of size 580 mm of specified make with footrestshalagi gp nrlm shed work site, lead or pvc connection pipe 32mm dia (for wash basin)halagi gp nrlm shed work site, c.i. / m.s. brackets for flushing cisternhalagi gp nrlm shed work site, brass stop cockhalagi gp nrlm shed work site, cp brass waste 32 mm of standard patternhalagi gp nrlm shed work site, cp brass chain with plughalagi gp nrlm shed work site, copper plated brass piller tap 15mmhalagi gp nrlm shed work site, white vitreous china clay flat back
Tender For request for bids for supply, installation and commissioning of slaughter house plant as per apeda standard - a: civil work items, dismantling the reinforcement cement concrete (r.c.c.) work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete., dismantling brick masonry in lime or cement mortar and stacking the material as directed with all leads, lifts etc., removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete., removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete., removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete, removing purlins from roof including stacking as directed with all leads , lifts etc. complete., removing rafters from roof including the materials as directed with all leads , lifts etc. complete., removing queen post truss from roof and stacking the materials as directed with allleads and lifts etc. complete, removing galvanized iron (g.i.) or asbestos cement (a.c.) sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete., excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the excavated material upto distance of 50 meters beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.50 m) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the cubic meter (cu.m) excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift from 1.5 to 3.0m.) by mechanical means, excavation for foundation in soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (lift from 1.5m to 3.0 m.) by mechanical means, lift upto 3.0 m, excavation for foundation in hard-rock by blasting including cubic meter (cu.m) trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (lift from 1.5m to 3.0 m) by mechanical means, filling in plinth and floors with approved excavated materials available at site in 30 cm layers include- ing watering and compaction with plate compactor to required proctor density etc complete., filling in plinth and floors with contractors material/brought from outside and approved by engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete., providing dry trap / granite / quartzite gneiss 200 mm thick hard core metal spread in two layers each of 125mm thick crushed to 100 mm consisting of m