Get complete information related to latest Suction Tank Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Suction Tank Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Suction Tank Repair Tenders.
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For corrigendum : supply of supply of spares for 70 mva areva make generator transformers : - oil circulating pump motor set , online moisture monitoring sensor , transformer m kiosk annun panel 12 point , transformer m kiosk annun panel 8 point , ct ratio 350by1acc class5p20 , ct ratio 350by1acc class 1by2 , ct ratio 350by1 acc class x , current transformer wtict2 , current transformer wtict1 , oti with 2-sets of contacts , 250mm dia magnetic oil level guage , temperature transducer pt-100 sensor , temperature transducer pt-100 for oti , flexible separator main tank conservator , silica gel breather main tank conservator , silica gel orange spherical type , globe valve- 15 bore , globe valve- 25 bore , gate valve- 50 bore , gate valve- 100 bore , gate valve- 25 bore , butterfly valve- 50 bore , butterfly valve80 bore , butterfly valve- 100 bore , non return valve- 100 bore , isolating valve , cooler drainpipe valve , under and over voltage , o-ring for valve 100 bore pipe , o-ring for valve 80 bore pipe , o-ring for valve 50 bore pipe , o-ring for valve 25 bore pipe , o-ring for valve 15 bore pipe , rubber cord 19 mm thickness , rubber cord 10 mm thickness , rubber cord 8 mm thickness
Tender For tender for supply of mt spares d d -nipple grease conical hd straight 8mm , nipple grease conical head straight 1 4 , steel jerrican empty 20ltrs , nipple grease special 1 4bsf zerk straig , nipple grease conical head angled 1 4 an , nipplegrease button head 1 8 bsp 9mm , nipple grease conical head straight 793 , cap tyre valve type head 880z tr vc-2 , valve core tr ci long short , sheet cellular 25mm thick 2m 1m , sensor water temperature , spring shoe return no 1 , seal outside cover , tank coolant vehicular , repair kit for air pressure governor , tank coolant vehicular
Tender For corrigendum : procurement of cleaning materials for h gollahalli gp for the year 2025-26/2026-27 - sanitizer, safety helmets, bleaching powder 33% chlorine, malathion dust 5.0%e.c, alum crystal, white scented phenyl, black phenyl, fogging chemical (with fuel mix), pesticide (fogging chemical with water mix), malathion oil 5.0% e.c, toilet cleaning acid, soft broom, coco broom, pvc hand gloves 16 inches, gum boots branded, mask branded, weed control chemical, sodium hypo chloride, apron, clip mop set it use moping purpose to office only, mop small cloth to use office table and chairs cleaning purpose only, bamboo ladder, toilet cake or odonil fragrance of wash room purpose only, the composition of malathion tech 5.0% based on 95% chain clay 10% soapstone, mini small fogging machine to spray for mesquites no warranty product to use diesel and mini gas can, giantbigfogging machine 1.9 ltr consumption ltr per hr chemical tank 5ltr capacity hand pump 3 to 4 time then cahrgeble battery running 1 year service warranty only with spares and labour charge are extra. to diesel and petrol running only, battery & manual sprayer to wear the back side 16ltr capacity tank no warrant for battery only service warranty 6months without spares only , with push cart set and 3phase honda motor and pump 100 meter flexible hose cable 2no spray guns 250 ltr capacity tank 1 year warranty for motor out of service is free up to 1year spare are chargeable, grass cutter or weed cutter 2 stroke engine with weed cutter 250meter wire 2sets of blades 1 year service warranty period without spares only china make only no brand petrol and oil running, grass cutter or weed cutter 4 stroke engine honda or other brand made company only 1 year motor warranty only without spares running petrol only, ammonium salt of glyphosate 71 % sg powder, system herbicide glyphosate 41% sl, plastic bucket, water jug normal size, plastic dust pan, metal dust pan, small web stick 8 feet, metal type big web stick16 to 24 feet length, garbage cover small size, coco broom with 5 feet length only natural product to sweep the outdoor only, sanitizer, safety helmets, bleaching powder 33% chlorine, malathion dust 5.0%e.c, alum crystal, white scented phenyl, black phenyl, fogging chemical (with fuel mix), pesticide (fogging chemical with water mix), malathion oil 5.0% e.c, toilet cleaning acid, soft broom, coco broom, pvc hand gloves 16 inches, gum boots branded, mask branded, weed control chemical, sodium hypo chloride, apron, clip mop set it use moping purpose to office only, mop small cloth to use office table and chairs cleaning purpose only, bamboo ladder, toilet cake or odonil fragrance of wash room purpose only, the composition of malathion tech 5.0% based on 95% chain clay 10% soapstone, mini small fogging machine to spray for mesquites no warranty product to use diesel and mini gas can, giantbigfogging machine 1.9 ltr consumption ltr per hr chemical tank 5ltr capacity hand pump 3 to 4 time then cahrgeble battery running 1 year service warranty only with spares and labour charge are extra. to diesel and petrol running only, battery & manual sprayer to wear the back side 16ltr capacity tank no warrant for battery only service warranty 6months without spares only , with push cart set and 3phase honda motor and pump 100 meter flexible hose cable 2no spray guns 250 ltr capacity tank 1 year warranty for motor out of service is free up to 1year spare are chargeable, grass cutter or weed cutter 2 stroke engine with weed cutter 250meter wire 2sets of blades 1 year service warranty period without spares only china make only no brand petrol and oil running, grass cutter or weed cutter 4 stroke engine honda or other brand made company only 1 year motor warranty only without spares running petrol only, ammonium salt of glyphosate 71 % sg powder, system herbicide glyphosate 41% sl, plastic bucket, water jug normal size, plastic dust pan, metal dust pan, small web stick 8 feet, metal type
Tender For repair to vehicle eicher ba no 11d 186709e ml complete cylinder head repair and overhauling as given in sl no 1 of specification document , ml for opening the existing alternator from the vehicle as given in sl no 2 of specification documents , taking down and removing old battery from vehicle carefully as given in sl no 3 of specification document , repair replacement of seat cover of best quality as given in sl no 4 of secification document , taking vehicle eicher to workshop for rectifying as given in sl no 5 of specification document , ml for alignment and wheel balancing of the vehicle as given in sl no 6 of specification document , supply and replace the defective spares in self motor as given in sl no 7 of specification document , complete gear box taken from the vehicle and opening as given in sl no 8 of specification document , ml for taking down the diesel tank and fuel pipes as given in sl no 9 of specification document