Tender For corrigendum : supply of spares and annual maintenance contract of sugarbaggingmachine on door delivery basis including servicing at sugauli plant, east champaran - supply of spares & servicing of sugarbaggingmachine at hbl plant, sugauli as per below mentioned & attached tender document:, weighing controller - htf 009, bag clamp input switch idca 122q, load cell 110 kg capacity make: sensotronics, load cell junction/ summing card, load bucket sensor m18 npn no, smps omron sbfs c05224 j, modular relay 8 channel- c/024v dc, air cylinder for course/fine/super fine- 40x50 compact- janatics, air cylinder for load bucket- 40x16 basic- janatics, air cylinder for bag clamp- 50x50 compact- janatics, modular relay 8 channels- c/024v dc, solenoid valve janatics 1/4-5/2.220v ac, make: janatics, mouth rubber- make: hi-tech, bag clamp rubber pad (1 set of 3 nos) make: hi-tech, rubber packing load bucket (1 set of 3 nos) make: hi-tech, frl unit 3/8 make: janatics, servicing of sugarbaggingmachine at hbl plant, sugauli as per below mentioned & attached tender document:, job scope includes providing annual maintenance contract (amc) and associated service engineer support shall include, but not be limited to, the following activities to ensure reliable performance of the sugarbaggingmachine throughout the crushing season:i. cylinder servicingii. complete machine servicingiii. controller and eprom memory maintenanceiv. seasonal re-commissioningplease refer to the detailed work scope mentioned under special terms & conditions.kindly note that all work shall be carried out by trained service engineers with adequate experience in handling similar machinery. the contractor shall ensure availability of necessary tools, consumables, and replacement parts (mentioned above) during servicing.
Tender For re babbiting-dismantling of bearings and pads from housing,rebabbiting of 10 nos tgb thrust pad along with all accessories,rebabbiting of turbine guide bearing, mid bearing & end bearing along with floating seals and all accessories,material composite test, ut test and dp test should be done for re-babbitted material,assembly of re-babbited bearings with blue match,submitting the video graphs of re-babbiting and reports of re-babbiting.re-alignment-the reason for shifting of generator shaft by 2 to 3 mm shall be analyzed and rectification works needs to be carried out,complete dismantling, assembling, painting and re-alignment of machine shaft,inspection of turbine shaft journal surface and repairs if required,inspection/replacement of worn out bushes and seals of guide vane, if necessary,inspection and repair of labyrinth ring, face plates, guide vanes and runner,guide vanes bed setting,tgb water cooler descaling work to improve the efficiency of cooler,complete assembly of machine,checking the magnetic axis of the generator and to ensure its alignment, checking of the unit leveling at all places and complete alignment of machine shaft,testing & commissioning of complete machine,painting of entire machine,checking of vibration & site balancing of machine,submission of vibration, balancing & alignment reports.flow switch-supply and installation of flow switch (flow rate110 lpm) along with 01 no 01 nc contact for inlet and outlet lubrication oil pipelines,supply and installation of pressure switch (30bar) for inlet and outlet lubrication oil pipelines,supply and installation of level switch for in tgb oil sump.replacement of new miv trunion shaft-dismantling of miv counter weight, miv servomotor assembly, and other related parts,lifting of miv from the bed,transportation of miv to the firms place, if required,replacing old nitrile rubber trunnion seals with existing profile by new one on both sides,replacements of miv trunnion shaft. providing of necessary drawings,material composite test, ut test and dp test should be done for new trunnion shaft & trunnion seals, bushes etc,all related fasteners and dowel pin to be replacing by new one,drive and non drive end trunnion bush, cupseals, stop end plate, washer ring etc need to be replacing by new one,repair of miv discand main body to be attended, if required,supply and replacement of miv disc rubber seal,pressure testing and commissioning should be carried out as per standard in presence of kpcl engineers,all tools & tackles required for the above mentioned works shall be arranged by contactor only.