Get complete information related to latest Surge Hopper Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Surge Hopper Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Surge Hopper Repair Tenders.
Tender For bid to ras tender for supply of travel axle for bunker shuttle conveyors c c -drive travel axle for conveyors17a/b , non drive shaft/shuttle con 21a1b1a2b2 , non drive travel axle for stage-2non drive travel axle for stage-2 , non drive travel axle for conveyors 17 a/b , non drive axle for conveyors 3 , 6a , & 6b , drive travel axle for conveyors 3 , 6a and 6b
Tender For corrigendum : replacement of existing damaged gi sheets of various buildings and conveyors of coal plant area at ukai tps.(wt-5126 civil ph)
Tender For corrigendum : btps-chp-preventive and breakdown maintenance of gear box/ couplings/ scoop couplings for the conveyors bcn-4a/b 5a/b, bcn 10, 6a/b, 7a/b and tripper as and when required in mm-iii sub division of mm/chp/btps for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Tender For corrigendum : tggenco-ktps-vii stage-chp-mm-procurement of different sizes of valves for cooling water lines for crushers and 5a/b conveyors-quotation called for-regarding
Tender For btps - chp - replacement of new/reconditioned flap gates, diversion plates, actuators, guide pipes, counter weight structer, oil top up and greasing, belt sway, etc for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor bcn-1a/1b, bcn-2a/2b, bcn-3a/b and ilms 1 and 2 and contingency reclaim belt conveyors -1 and 2 from 01.04.2026 or actual date of commencement of work to 31.03.2027 required in mm-i sub division of mm/chp/btps.
Tender For btps - chp - periodical maintenance of diversion plates, scrappers and skirt rubber for the conveyors bcn- 4a/b, 5a/b, 6a/b, 7a/b, bcn - 10 and trippers as and when required in mm-iii subdivision of mm/chp/btps for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027