Web Analytics Made Easy - StatCounter

Telephone Cable Laying Tenders

Get complete information related to latest Telephone Cable Laying Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Telephone Cable Laying Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Telephone Cable Laying Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :45231232 Due date: 08 Jun, 202608 Jun, 2026 NA
Tender For supply and execution items for reliability improvement of signalling inst. section of sr. dste/1/lko of lucknow div. nr. - excavating and refilling of trench to the level of ground with rammed earth asper drg. no.(nr/s&t/con/1.1/97a) so as not to form a drain 0.3 mtrs wide & 1mtr deep on both side of the station along side the track. it shall confirm to the safe distance as per signalling and cable plan in all type of soil, it also includes clearence of roots of trees and bushes., excavating and refilling of trench 0.3 mtrs wide & 0.8 mtr deep on pitced/stone/bricks paved surface, road/crossing/platform etc. and restoration of surafce to original condition., laying of signalling/telecom/power cables of different sizes as per attached guidelines (drg. no.(nr/s&t/con/1.1/97a) or latest on signalling cable laying and as per cable route plan approved by railways through trenches, rcc pipe, dwc pipe, gi pipe etc and meggering of cable before and after its laying of all type of outdoor cables. contractor have to transport cable from any store of lko division to site carefully. meggering to be done for each drum separately. meggering sheets to be supplied and filled up by contractor and submitted to railways, as per instructions by consignee., supply and laying of 2nd class bricks in the trench and laying as per drg. no. (nr/s&t/con./1.1/97a) or latest and as per instruction of the site engineer., boring and trenchless cabling along with supply and insertion of hdpe/dwc self lubricated pipes as per rdso spec no. rdso/spn/204/2011 ver 1.1 or latest of 120mm nominal dia in the bore at the depth of 1.4 meter to 2.1 meter from formation level (level of earth below ballast) as per drawing and as directed by engineer incharge by trenchless technology for laying of signalling /telecom/power cable under track /culvert etc. cable laying covered separately. inspection-consignee for supply of dwc/hdpe pipe. the following required coupling arrangement should also be supplied: 1. suitable snap fit couplers withrubber o ring, 2. spacers, 3. tees. 4. bend. 5. end cap(1 no. =6mtr ,straigh tpipe). (a) the cost shall include horizontal boring through any intermediate obstruction, either natural or man made or any boundary etc. (b) the rate is inclusive of all the materials equipment and labour required for during trenchless horizontal boring under the railway track. nothing extra shall be admissible on any account than the rate quoted above. (c) the pipeis to be laid underrailway track/road /culvert. all necessary arrangement are to be provideand all precautions are to be end is not deviated from the horizontal level line by more than 250mm in horizontal and vertical direction. (d) the rate shall be inclusive of direction and protection of underground utilities encountered during boring. (e) the payment for boring shall be made only when dwc/hdpe pipe are laid in the bore., concreting unschduled items in concrete of 1:3:6 ratio in cement, coarse sand and aggregate 25mm at different places in the yard and plastering top in fine plaster of 1:4 cement sand ratio. it also includes the excavation of earth as required at site and as per instruction of site incharge. the volume in cubic metres shall include the volume occupied by any ci foundation, trestle, ms angle or flat or gi pipe required to be embedded in the casting. cement coarse sand and aggregate 25mm are to be supplied by the contractor., earth work for excavation and refilling around location boxes and signals etc. where necessary including 50m lead and 1.5m lift. the lead is to be measured from centre of gravity of location to the centre of filling and lift from main ground level. the earth work should be well rammed including breaking of clods, levelling and dressing etc. as per instruction of engineer at site., brick work with well burnt bricks in foundations and plinths with cement and sand (ordinary) mixture of 1:4 ratio. all material is to be supplied by the contractor.

Central Government/Public Sector

CTN :44931970 Due date: 13 May, 202613 May, 2026 NA
Tender For design, manufacture, supply, installation, testing and commissioning of microprocessor based electronic interlocking system (rdso spec no. rdso/spn/192/2019 ver. 2 with latest amendment) at budha pushkar (alteration, indoor & outdoor work), pushkar, nand, kod, riyan, bhesra kalan, katyasani stations along with supply, installation, testing and commissioning of various indoor & outdoor signalling & telecom systems/gears.the work includes excavation of trench, laying of cables in polyolefin duct/rcc half round pipes/gi pipe/dwc/hdpe/trench etc., casting of foundations of macls signals/apparatus cases, supply-installation of point machines, apparatus cases, macls signals, track circuit equipment (dc track circuit & single msdac in all stations yards), earthing, data loggers, eld, facs, afdas, iot based rdpms etc.the work includes addition/alteration in the existing electronic interlocking (kyosan make ei) at budha pushkar station & associated indoor and outdoor works in c/w new bg line in pushkar - merta section.the work also includes signalling and telecom work for shifting of existing s&t gears (lc gates, signals and location boxes, s&t cables, hassdac/ssdac, etc.) for removal of infringements of s&t gears coming in alignment of new bg line.the telecom work includes design, supply, installation, configuration, testing and commissioning (sitc) of telecom indoor and outdoor equipment including ip-mpls system with power supply arrangement, trenching, laying, jointing and termination of 4*48 fibre optical fiber cable (two on each side of the track) cable along with fibre management system & telecom asset management system and 6 quad cable along with provision of passenger amenities including ipis at pushkar & katyasani and other telecom works at stations, block sections, tss/sp/ssp etc. in c/w new bg line work in pushkar - merta section of ajmer division of north western railway.
 Loading, Please wait...

Connect us via What's Up