Web Analytics Made Easy - StatCounter

Test Set Tenders

Get complete information related to latest Test Set Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Test Set Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Test Set Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43601466 Due date: 12 Feb, 202612 Feb, 2026 NA
Tender For supply and installation of a multi-fuel variable compression ratio engine test setup with ac dynamometer at iit bhilai

Central Government/Public Sector

CTN :43606553 Due date: 06 Feb, 202606 Feb, 2026 6.15 Lacs
Tender For supply of items required for ev lab c c - demonstration and testing setup differential with motor controller and accelerator for e rickshaw electric tricycle , bldc hub pmsm and mid drive motor demonstration setup , two wheeler electric vehicle wiring harness sensors and powertrain workbench open chassis , training workbench led display speedometer for golf cart , scissor hydraulic service ramp foot operated for two wheeler

Central Government/Public Sector

CTN :43571173 Due date: 21 Jan, 202621 Jan, 2026 NA
Tender For corrigendum : procurement of three phase automatic relay testing kit for ntpc raipurelectrical training facility

Central Government/Public Sector

CTN :43563767 Due date: 06 Feb, 202606 Feb, 2026 3.96 Lacs
Tender For providing of calibration services - electrical, optical calibration, votage,current,resistance,rf power, frequency, oscilloscope, otdr, nav analyzer, radio comm test set; voltage, current, power (ac/dc), frequency, power factor, phase angle, resistance, votage,cu..

Central Government/Public Sector

CTN :43606364 Due date: 06 Feb, 202606 Feb, 2026 NA
Tender For supply of procurement of 03 types of gse items : : -hal_alh-afcs_looms for afcs test set , sk-alh-dse0990_wir har_wiring harness for chip burning mod , sk-alh-dse-0990_wir har--wiring harness for chip burning mod , sk-alh-dse-0990_wir har_wiring harness , alh-mro-swlc--dmc software loading box with cable

CTN :43606602 Due date: 06 Feb, 202606 Feb, 2026 NA
Tender For tender for supply of supply of cat 6a u/utp cable (305mtr/box) , supply of cat6a patch panel with 24 ports in 1 u form factor , supply of utp cat6a patch panel with 48 ports in 2u form factor , supply of utp cat6a 10gbps rj-45 patch cords solid conductor of 1 meter , supply of utp cat6a 10gbps rj-45 patch cords solid conductor of 2 meter , supply of utp cat6a 10gbps rj-45 patch cords solid conductor of 3 meter , supply of single cat6a i/o of 10gbps speed , supply of i/o faceplate as required , laying of cat 6a u/utp cable , installation of cat6a patch panel with 24 ports in 1 u form factor , installation of utp cat6a patch panel with 48 ports in 2u form factor , installation of utp cat6a 10gbps rj-45 patch cords solid conductor of 1 meter , installation of utp cat6a 10gbps rj-45 patch cords solid conductor of 2 meter , installation of utp cat6a 10gbps rj-45 patch cords solid conductor of 3 meter , installation of single cat6a i/o of 10gbps speed , installation of i/o faceplate as required , supply of 6 cores os2 singlemode , dry tube with corrugated steel armoured frlszh jacket indoor/outdoor optical fiber cable , supply of 19 inch rack mount 1u sliding modular fiber shelf 12 core liu , supply of adapter plate 12 lc aqua , supply of single mode lc/upc to unconnectorized , fiber pigtail , length 3 feet , supply of blank adapter pack , 4 panels , supply of fusion splice tray kit , 48 fiber , supply of 19 inch rack mount 1u sliding modular fiber shelf 24 core liu , supply of adapter plate 12 lc aqua , supply of single mode lc/upc to unconnectorized , fiber pigtail , length 3 feet , supply of blank adapter pack , 4 panels , supply of fusion splice tray kit , 48 fiber , supply of 1 meter lc-lc single mode duplex fiber optic patch cords , supply of 3 meter lc-lc single mode duplex fiber optic patch cords , laying of 6 cores os2 singlemode , dry tube with corrugated steel armoured frlszh jacket indoor/outdoor optical fiber cable , installationof 19 inch rack mount 1u sliding modular fiber shelf 12 core liu , installation of adapter plate 12 lc aqua , installationof single mode lc/upc to unconnectorized , fiber pigtail , length 3 feet , installation of blank adapter pack , 4 panels , installation of fusion splice tray kit , 48 fiber , installation of 19inch rack mount 1u sliding modular fiber shelf 24 core liu , installation of adapter plate 12 lc aqua , installation of single mode lc/upc to unconnectorized , fiber pigtail , length 3 feet , installation of blank adapter pack , 4 panels , installation of fusion splice tray kit , 48 fiber , installation of 1 meter lc-lc single mode duplex fiber optic patch cords , installationof 3 meter lc-lc single mode duplex fiber optic patch cords , splicing/termination of cable , supply of 9u wall mount rack with 2 fans , 2 horizontal cable managers , stationary shelf , 2 nos of hardware pkts. , 6 socket pdu with mcb. , supply of 12u wall mount rack with2 fans , 3 horizontal cable managers , stationary shelf , 2 nos of hardware pkts. , 6 socket pdu with mcb. , supply of l3 access switch having 48 nos. 10/100/1000 base-t ports , stacking , all ports capable of providing poe+ as per 802.3at , switch having a poe power budget of minimum 1440 watts , software defined networking (sdn) enabled with all licenses from day 1 complete as required and as per technical specifications , supply of l3 access switch having 24 nos. 10/100/1000 base-t ports , stacking , all ports capable of providing poe+ as per 802.3at , switch having a poe power budget of minimum 1440 watts , software defined networking (sdn) enabled with all licenses from day 1 complete as required and as per technical specifications , supply , installation , testing and commissioning of distribution switch- layer 3 switch , 24 x 1g/10g/25g sfp+ ports and 4 x 40g qsfp+ ports , full advanced layer 3 features , software defined networking (sdn) enabled with all licenses from day 1 , installed dual redundant hot-swappable power supplies from day 1 ,

CTN :43597998 Due date: 21 Jan, 202621 Jan, 2026 NA
Tender For supply, installation, testing, and commissioning of immersion cooling test setup with associated systems for smart kool experience centre at r&d, sewr

CTN :43606382 Due date: 27 Jan, 202627 Jan, 2026 3.62 Lacs
Tender For supply of telecommunication equiptments c c - pa lectern system make ahuja asl-3000r , insulation tape , alkaline battery 9 volt for cordless mic , alkaline battery 1 point 5 volt aa , lineman testing kit , fcbc 48v comma 25 amp , digital multimeter make fluke 101 or sanwa , ahuja tza 4000 usb two zone pa amplifier , online ups 2 kva dash 72v inbuilt bty 7 ah , lg xboom ol 100 comma 2000 watts multy wireless speaker , nose plier , cutting plier , tele cable multi 5 pair armoured , ups 01 kva microtek twin guard plus 1000 plus

CTN :43603846 Due date: 27 Jan, 202627 Jan, 2026 NA
Tender For supply, assembly, installation, testing and commissioning of complete material kit for zdm3 locomotives for kalka shimla railway at plw/patiala and their final commissioning and testing at diesel loco shed kalka as per rdso spec no. mp-0.08.00.89 (rev.-00) aug 2009, rdso drawing no. sk.dp-3944 and plw/sor/doc /ng/13010116/ksr (rev-0) of aug-2025. [ warranty period: 36 months after the date of delivery ]

CTN :43581451 Due date: 04 Feb, 202604 Feb, 2026 NA
Tender For tender for supply of supply installation and commissioning of fuel dual kit for dg sets : : - supply of the dual fuel kit for 910 kva dg 1 set in complete as per tender scope. , installation testing and commissioning for the dual fuel kit for 910 kva dg 1 set including pre and post emission test in complete as per tender scope , supply of the dual fuel kit for 910 kva dg 2 set in complete as per tender scope. , installation testing and commissioning for the dual fuel kit for 910 kva dg 2 set including pre and post emission test in complete as per tender scope. , supply of the dual fuel kit for 500 kva dg 1 set in complete as per tender scope. , installation testing and commissioning for the dual fuel kit for 500 kva dg 1 set including pre and post emission test in complete as per tender scope. , supply of the dual fuel kit for 500 kva dg 2 set in complete as per tender scope. , installation testing and commissioning for the dual fuel kit for 500 kva dg set including pre and post emission test in complete as per tender scope.
 Loading, Please wait...

Connect us via What's Up