Get complete information related to latest Tinman Solder Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Tinman Solder Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Tinman Solder Tenders.
Tender For supply of under frame arrgt for emu c to drg no.(573)icf/mrvc/c/bt-1-1-001, alt 'k' col 2. firm shall fulfil the manufacturing facility as per icf/md/spec-147, issue status-01 rev.02 with amendment no.02. special condition : the underframe should be supplied as normal side up and side bearer side down. packing condition as per drg no. icf/j&t/misc-2487, alt 'b' stage inspection details. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : supply and delivery of school requisites 2026 - angle grinder-grinding wheel, diameter 110 mm , power range, 750w to 2000w, 240v + key (eu), band saw-table size 400 x 548, mm, 900 w or 340 x 335 mm, 350, w 240 v + blade and sense (eu), bench drilling machine-13mm, chuck, 240v, minimum table size, 260 x 180 mm + chuck key (eu), bench grinder-minimum 250 w,, 240v, circular saw-minimum 1.5kw,, 240 v + fence and cross-cut guide, (eu) (table mounted), compressor -output 50l/min, 6, bar, 340 w + supply hose and clips, (eu), spraygun-0.7 mm nozzle, diameter, 800 cl capacity (approx), (0.7 mm - 1.4 mm), drilling machine (portable)-, chuck diameter 3 - 16mm, 240 v +, chuck key, extension cable-20 metres, hot wire cutter-40 w, 240v, jig saw (portable)- power range, 300 600 w, 240v + allen, key(eu), metal lathe-1.5kw, distance, between centres 750 mm, including tool bit, boring bar,, knurling tools, parting tools, tail, stock, chuck key, centre drill, dead, centre, revolving centre, face, plate, 4-jaw and 3-jaw chucks., (eu), planer / thicknesser-maximum, planing width 310mm,maximum, thicknesser capacity 230, mm,power range 3kw to 4kw,, 240 v + fence(eu, router (portable)- power range, 1200w to 1800 w, 240v + key, (eu), sander orbital-power range 250, w to 300 w, 240v (eu), soldering iron-80 w, strip heater-140 w, 240v, welding machine-electric arc, 6kw, 150a, 240v (with protective, casing) incluing clamp, cables and, shield. (eu), wood working lathe-distance, between centres 1093 mm, 550, w, 500 - 2000 revolutions per, minute including face plate, dead, centre, revolving centre, turning, tools and tool rest., abrafile frame-4" deep/blade, length 6" (+ blade on frame), adjustable spanner-jaws open : 22, mm length: 200 mm, adjustable spanner-jaws open : 31, mm length: 300 mm, anvil-50kg, bench hook*-material: beech, size:250 mm x 150 mm, bench shear (guillotine)- up to 4, mm sheet and 10 mm rod, bradawl-minimum blade length, 32 mm, carpenters mallet-4.5 head width, centre punch-round head,, knurled body, 4" length, centre square-std size 75 mm, chisels- mortice-size: 6 mm, chisels- mortice-size: 9 mm, chisels -bevelled edge-size: 12, mm, chisels -bevelled edge-size: 19, mm, chisels -bevelled edge-size: 25, mm, chisels- firmer-size: 6 mm, chisels- firmer-size: 12 mm, chisels- firmer-size: 25 mm, cold chisels-type: flat, size:150 mm x 12 mm, combination drill-std drill set, combination pliers-size: 200 mm, coping saws-blade length: 150, mm, corner clamps-cramping capacity, 4" mild steel type, countersunk bit-head diameter:, 3/8" length: 2", dividers-length 6", engineers square-length 6", engineers vice-jaw width: 6", engineer's swivel base table (50, mm), forstner bit-bit set: sizes 10, 12,, 15, 16, 18, 20, 22, 25, 26, 28, 30,, 35, 40, 45 & 50 mm, gcramps-capacity: 6", gcramps-capacity: 12", hacksaw-non-adjustable 12", tubular frame wing nut tensioning, device for 12" blades, hammer: ballpein-0.5 lb, hammer: ballpein-0.75 lb, hammer: ballpein-1 lb, hammer claw-0.5 lb, hammer cross pein-0.75 lb, hand drill-chuck capacity 8 mm, hand files including handles-size:, 6", hand files including handles-size:, 8", hand files including handles-size:, 10", hand saws-22" long - cross cut, hand saws-22" long -rip, inside calipers-arm length 6", jack plane-14" long, jenny calipers-arm length 6", junior hacksaw-length blade 6", machine vice-maximumm jaws, opening 85mm, marking gauge-minimum length, 240mm, marking knife-length of body, 15cm, measuring tape-measuring length:, range 3m to 5 m, metalwork bench-size 2010 x 810, x 800mm, mitre box-mitre block 9" long, (plastic), mole grip-length 7, nail punch-set of 4 nail punches;, 1.5, 2.5, 3 & 5 mm, needle files-set of 6 - 14cm, oil can-2 pints capacity (1-2 pint), oil stone-150 mm length, outside calipers-arm length 6", pincers-length of body: 180 mm, pipe wrench-length: 300 mm, rasps-length size: 200 mm - 350, mm, ring spanner-set 6mm 25mm, riveting machine kit-sets rivets, up to 5 mm
Tender For supply of underframe complete for lwlrrm amrit bharat coaches to drg. no.lp11103,alt d, anx 9 without item 30 to drg. no.1.11012.0.03.095.001 with additional brackets to drg no 53811115, alt 'a'. the manufacturing facility as per icf/md/spec-147, issue status-01, rev-02 with amendment no.'02'. special condition : the underframe should be supplied as normal side up and side bearer side down. packing condition as per drg no. icf/j&t/misc-2487, alt 'b'. stage inspection details. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion.[safety item ]
Tender For supply of lwsczac shell kit 534 a one coach set of roof, sidewall and end wall for lwsczac 534 1. roof assembly to drg no 53416001, alt 'c' - 1 no, 2. final roof element cpl to drg no. 87716014, alt 'e' - 2 nos. 3. final roof element cpl to drgno. 87716015, alt 'e' - 2 nos. 3. side wall to drg no. 53414001, alt 'd' - 1 no. 4. endwall to drg no 59315007, alt 'b' - 2 nos. firm shall fulfill the manufacturing facility as per icf/md/spec-200, issue status-01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/spec-315, issue status-01,rev.00, with amendment no 01. b one coach set of welding parts on body shell and partition frames for lwsczac coaches to drg. no. 1. (lwsczac) 53410002, alt 'b' - 1 no. 2. (lwsczac) 53410054, alt 'l' - 1 no. 3. 58110016, alt 'a' - 6 nos. 4. 58110015, alt 'a' - 3 nos. 5. aaa10972, alt 'a' - 3 nos. 6. aaa10976, alt 'nil' - 1 no. 7. aaa10977, alt 'nil' - 1 no. 8. aaa10978, alt 'nil' - 1 no. 9. aaa10979, alt 'nil' - 1 no. 10. aab10007, alt 'a' - 4 nos. 11. aaa10963, alt 'nil' - 2 nos. 12. ssa10018, alt 'nil' - 3 nos. 13. aaa10967, alt 'nil' - 1 no. 14. ssa10021, alt 'nil' - 2 nos. 15. 58110017, alt 'c' - 2 nos. 16. aaa10970, alt 'nil' - 4 nos. 17. aaf10937, alt 'nil' - 3 nos. 18. (lwsczac)53410001, item.25, alt 'r' - 12 nos. 19. aab10014, alt 'nil' - 4nos. c under frame arrangement to drg no. 85111001 col 1. alt 'p' - 1 no. firm shall fulfillthe manufacturing facility as per icf/md/spec-147, issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'e'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing conditionas per icf/j&t/sk-1865, alt 'a'. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : supply of one coach set of end part for air conditioned emu trailer coaches to drg. nos. emu/c/ac-1-1-002, col-iii, alt 'd' -1 no, emu/c/ac-1-1-003, col-i, alt 'c' -1 no. special condition : special condition: i) the manufacturing facility requirement as per icf/md/spec-147,issue status-01,rev-02, amendment no.02. ii) body bolster to drg.no.icf/mrvc/c/ss-1-1-005,alt 'h', col.i to be provided without a)side bearers to drg.no.emu/m-1-1-027,alt 'z' col-ii.b)grubscrews to drg.no.icf/mrvc/c/ss-1-1-005, alt 'h' item-8, and c)side bearer covers to drg.no.emu/m-1-1-027, alt 'z' item-1. iii)the under frame end part should be supplied with normal side up and side bearer side down. details for satge inspection. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of sole barwith cross members. # assembly of body bolster arrangement. # welding of ribs with sole bar. #placing & welding of top sheet arrangement. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (c) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # final product inspection. note: applicationof aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrosion. suitable packing to be done to prevent damage during transit, unloading and rust prevention during storage. [safety item ]
Tender For lwscz shell kit (a) lscz - one coach set of roof, 2 mm sidewall and end wall for lwscz coaches. 1) sidewall assembly to drg.no. (329) icf/sk3-1-4-091, alt 'b' , col- 1 - 1 no. 2) roof assembly to drg.no. (lwscz) 73916001, alt 'd', col-i - 1 no. 3) end roof assembly to drg.no.(ls) 58116066, alt 'h', col-i - 2 nos. welding pin to drg no 81410012 alt nil to be assembled on roof and sidewall 4) endwall to drg.no. (lslrd) 74115001, alt 'j'-2 nos. the firm shall fulfil the requirement as per icf//md/specn.200, issue status 01, rev 04 with amendment no. 01. the firm shall fulfil the requirement as per icf/md/spec-315, issue status-01, rev.00, amendment no. 01. firm has to supply roof and sidewall without applying etch primer. (b)one coach set of body shell items and partition frames for lwscz2(814) coaches to drg nos, 1. 81410002, alt nil- 1no. 2. 81410005, alt 'e'- 1 no. 3. 58210036, alt 'b'- 2 nos. 4. 67010011, alt 'a'- 2 nos. 5. 58110017, alt 'c'- 2 nos. 6. aag10457, alt nil- 4 nos. 7. aab10338, alt nil-16 nos. 8. 58110015, alt 'a'- 6 nos. 9. 58110016, alt 'a'-3 nos. (c) under frame arrangemnt to drg no. 81411001 alt 'f' the manufacturing facility as per icf/md/spec-147, issue status-01 rev.02 with amendment no.02. special condition : a) -packing as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1867, alt. 'nil' -packing as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk-1865, alt "a". c) packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up and side bearer side down. stage inspection details. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly& welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor withcross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : shell kit for memu dmc2 jk 946 a. roof assembly 94416001 000 01, alt 'nil' - 1 no. location of sidewall 94414001 000 01, alt 'nil' - 1 no. end construction pail end 94615001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status 01, rev.0 0with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu dmc2 jk 946 to drawing nos: 1. 94410003 000 01, alt 'a' - 1 no 2. 74510257 000 01, alt 'nil' - 1 no 3. 94410004 000 01, alt 'nil' - 1 no 4. 74510045 000 01, alt 'nil' - 1 no 5. 94410005 000 01, alt 'nil' - 1 no 6. 94410002 000 01, alt 'b' - 1 no. 7. 94410076 000 01, alt 'nil' - 1 no 8. 94410072 000 01, alt 'nil' - 1 no 9. 94410054 000 01, alt 'nil' - 2 nos. c. under frame arrangement 94411001 000 01, alt 'a' - 1no. firm shall fulfill the manufacturing facility as per icf/md/specn-147, issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'e'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing conditionas per icf/j&t/sk-1865, alt 'a'. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]