Get complete information related to latest Tippler Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Tippler Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Tippler Tenders.
Tender For corrigendum : comprehensive annual maintenance contract for hitachi make electronic interlocking ei stationof track hopper control room central yard east cabin east m3 yard west cabin west m4 yard of wagon tippler line at ntpc sipat for twoyears 2026 28
Tender For supply of modules chp a , overhauling, servicing of coal handling control room switch gear section b main bus chp a , overhauling,servicing of coal handling control room switch gear section b breaker ic, og, chp a , overhauling,servicing of coal handling control room switch gear section b panels chp a , overhauling,servicing of coal handling control room switch gear section b russian control modules chp a , overhauling,servicing of coal handling main building transfer point switch gear main bus transfer point section a, chp a , overhauling,servicing of coal handling main building transfer point of panels, chp a , overhauling,servicing of coal handling main building transfer point of russian control modules, chp a , overhauling,servicing of coal handling main building transfer point of switch gear main bus transfer point section. b, chp a , overhauling, servicing of coal handling main building transfer point of panels, chp a. , overhauling,servicing of wagon tippler, switch gear electrical wagon pusher sg room of russian breaker. , overhauling,servicing of wagon tippler, switch gear electrical wagon pusher sg room of russian resistance boxes a chp. , overhauling,servicing of wt sg sg room of wagon tippler resistance boxes, a chp. , overhauling,servicing of 0.4 kv swg sectiona, b, c, fhd swg section a, b and old and new stacker, reclaimer switch gear of chp a , overhauling, servicing of l.t. modules,panel of breaker ,ic coupler of chp, control room of bchp , overhauling,servicing of lt modules panel of breaker ,og feeder of chp, control room of bchp , overhauling,servicing of lt modules,panel of breaker , ic coupler of fuel handling control room of bchp , overhauling,servicing of lt modules,panel of breaker ,og feeder of fuel, control room of bchp , overhauling,servicing of old stacker re claimer panel , overhauling,servicing of old stacker reclaimer resistance box of bchp , overhauling,servicing of old stacker reclaimer control panel of bchp , overhauling,servicing of new stacker reclaimer panel , overhauling,servicing of newstacker reclaimer resistance box of bchp , overhauling,servicing of newstacker reclaimer control panel of bchp , servicing,overhauling and breakdown maintenances of mimic plant of chp. , overhauling ,servicing of tippler switch gear of b chp. , overhauling,servicing of wagon tippler room operator panel on off of bchp , overhauling,servicing of wagon tippler room incoming power panel of bchp , overhauling,servicing of wagon tippler room control modules of bchp , overhauling or servicing of wagon tippler room resistance box of bchp , overhauling or servicing of wagon tippler screw pad overhauling of bchp. , overhauling or servicing of wagon tippler over travel limit switch otls overhauling of bchp. , overhauling or servicing of wagon tippler mcc panel of tipper 11a, 11b, 12a, 12b of bchp.
Tender For annual maintenance contract annual maintenance contract for wagon tippler weighing systems as per defined scope of work and bill of quantities boq
Tender For corrigendum : supply and drained bed material/clinker handling in boilers. - loading of seived bed material in boiler from operating floor, spreading and leveling as per the direction of eic. the contractor has to arrange man power, if required during odd hours & sundays/ holidays, if required on emergency. frequency: as and when required., transportation of seived bed material , available in polythene bags, from ground floor to operating floor and coal scale area of boiler house and stacking it as per the direction of eic. frequency: as & when required., transportation of drained bed material, when boiler is in operation and drained clinker from boiler area to designated sieving area as per direction of eic. frequency: as and when required., collecting the bed material in polythene bags from areas wherever necessary for inspection of bed coils, wall tubes or for any other maintenance purpose and keeping the bed material either inside or outside of boiler bed, as per the direction of the eic. frequency: as and when required., removal of clinker from boiler 1 bed, using suitable methods without causing any damage to the bed coils/side wall tubes and transporting the removed clinker from the boiler to a specified area within 30 meters from ground floor of boiler house. after removal of clinkers, entire bed material and cleaning of nozzle distribution plates , all fluidization nozzles needs to be flushed out with compressed air and all nozzles needs to be pinned. frequency: as & when required., removal of clinker and bed material inside furnace (cross section 6.5m*6m) by engaging suitable manpower. location of clinker and bed material is between bed coils and fluidization nozzles. manpower engaged has to lie down between fluidization nozzles and bed coils and manually pass on clinker pieces to manholes available to be taken out. bed material can be drained through bed drains. since job to be executed is in constrained area, manpower engaged has to be physically fit. after removal of clinkers, entire bed material and cleaning of nozzle distribution plates, all fluidization nozzles of 4 compartments/ wind box needs to be flushed out with compressed air and all nozzles need to be pinned (pb# 2). frequency : as and when required.