Get complete information related to latest Tools Accessories Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Tools Accessories Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Tools Accessories Tenders.
Tender For construction of ms steel shed for gymnastic room varandah with simple gymnastic tools/accessories aside natungram playground. under r/hijuli -i (scheme id apas/01/090/118/0002)
Tender For supply of materials as per the technical specifications given in the job order.shifting of material to work place.inspection of material in presence of indenter & stores.power off the existing system, isolation & removing of existing hea system equipments and shifting to designated area (stores).replacing the new hea system instruments in the existing location, ensuring of all power & pneumatic connections and power on the system.establishing cable connectivity between local jbs to supplied instruments is in your scope.checking of all the corners hea system instruments healthiness by operating locally. remote operation shall be carried out from the ucb.any additional items, tools, accessories required to carry out the above work shall be contractor/supplier scope.shifting of released material to stores or designated area.training of plant personnel for operation and maintenance of new hea ignition system.it is the complete responsibility of the firm to execute the job & to bring back the system in to operation without time delay
Tender For supply of materials as per the technical specifications given in the job order.shifting of material to work place.inspection of material in presence of indenter & stores.power off the existing system, isolation & removing of existing bhel vision -20 m pressure vessel/cable/ ascertor/electronics cabinet/rdu equipments and shifting to designate area.replacing the new ewli system pressure vessel/cable/ ascertor/electronics cabinet/rdu in the existing location, ensuring of all connections and power on the system.checking/testing of healthiness (alarm, trip, analog output contacts and display) of the system and commissioning.any additional items, tools, accessories required for carry out the above work shall be contractor/supplier scope.satisfactory operational performance has to be ensured.shifting of released material to stores.training of plant personnel for operation and maintenance of new ewli ignition system.it is the complete responsibility of the firm to execute the job & to bring back the system in to operation without time delay