Tender For supply of set of screwless rail-mounted terminal block suitable for 2.5 sq. mm conductors, 2 in 2 out, disconnecting type, front entry, cage clamp, comprising of: (i) terminal block: 12 nos. (04 red, 04 yellow, 04 green); (ii) end plate: 02 nos. (iii) end stopper: 02 nos. (iv) carrier rail of dimension 35 mm %d7 7.5 mm, 1 mm thickness, unslotted, of length 1 metre. (v) marker strip for 12 terminal blocks, as per rdso spec. no. spn/189/2004rev. 2, and as applicable in irs-s-75/2006 rev. 2 & irs-s-23 [ warranty period: 30 months after the date of delivery ]
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of
Tender For corrigendum : supply of scrap conveyor link : : - carrier element 5m 810 7810 012 , carrier element 5m 810 7810 013 , chain pin as per drg 591 7721 006 , anti noise plate as per drg 591 7721 007 , dummy please do not quote for this item
Tender For supply of front suspension bush e e - front suspension bush , rear door lock assembly , bush carrier plate , ball joint , differential bearing , steering rack end , hub bearing , hub seal
Tender For supply of fuse tb type-1 1in-1 out cbl upto 2.5 , fttb type-1 1in-1 out cbl upto 2.5 sqmm , fttb type-1 1in-1 out cbl upto 2.5 mm , fttb type-1 1in-2 out cbl upto 2.5 m , fttb type-2 1in-1 out cbl 4.0 sqmm r , fttbtype-2 1in-1 out cbl 4.0 sqmm bk , fttb type-2 1in-2 out cbl 4.0 sqmm , fttbtype-2 1in-2 out cbl 4.0 sqmm , 2posi plugin bridge for ftb cbl 2.5 sqmm , 2posi plugin bridge for fttb cbl 2.5 sqmm , end plate for feed through tb type-1 , end plate for fttb1in-1 out cbl 4.0 mm , end plate for fttb1in-2 out cbl 4.0 mm , end plate for fttb diode1in-1 out cbl , end plate for fttb 1in-1 out cbl 2.5 m , screwless end stop for fuse and feed tb , terminal marker for fuse tb 1-12 , terminal marker for fttb 1-14 , fttb with diode 1in-1 out cbl upto 2.5 , end cap for din rail 35 x 7.5 mm , terminal strip marker carrier