Get complete information related to latest Towel Clip Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Towel Clip Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Towel Clip Tenders.
Tender For mtps-i ?? chp-i ?? deep screening, through packing, lifting the track line, ballast deficiency makeup work with 40mm hard broken stone ballast, grinding the elongated edges of rails and reversing the grounded rails into its position in wagon tippler iii inhaul to a length of 226 mtr after level crossing and breaking the embedded damaged concrete, removing coal powder on the track lines, removing the concrete sleepers, providing bed pcc mix 1:4:8, laying the psc sleepers (drg.no:t2496), rails with fittings, check rails at level crossing and providing pcc concrete 1:2:4 to a length of 45 mtr in wagon tippler iii inhaul etc.
Tender For mtps i chp i deep screening through packing lifting the track line ballast deficiency makeup work with 40mm hard broken stone ballast grinding the elongated edges of rails and reversing the grounded rails into its position in wagon tippler iii inhau
Tender For supply of goods, improved switch expansion joint - 60 kg to rdso drg. no. t-6902 (alt-5) (with 80 mm gap) listed in the drawing including check rails if any but excluding rubber pads, as per specification irs: t-10-2023 with latest alteration and as per technical specifications for isej provisional' 2008 and wit h latest alterations as amended up to the date of tender notice. (the alteration in drawing, specifications and str issued by rdso up to one month prior to tender opening date shall be applicable to this tender) . note: in terms of railway board letter no. 2022/track-i(p)/fabricators dt- 28.04.2022, the firm will be re sponsible for procurement/purchase of rails (inspected by ir's inspecting agency) required for manufactu ring of tendered item. details of fittings as per attached annexure-c [ warranty period: 30 months afte r the date of delivery ]
Tender For usfd testing of rails and welds as per "indian railway manual for ultrasonic testing of rails and weld (revised 2022)" of double line track in new khurja to new bhaupur section between dfc km 851.300 to km 514.00, including yard and ir connection of dfccil for two years in edfc under cgm/tundla.
Tender For sr. den/north/sbc sec : sw i : collection and supply of ballast at makajapalli (mkj) depot (quantity : 21,540 cum) including leading and loading in connection with the work of (i) through ballast recoupment of points and crossings - 4 points at orh yard and 5 points at mkl yard (total - 9 nos). (ii) through turnout renewal of existing 1in12 curved switch and cms crossing with tws and weldable cms crossing - 08 nos at ynk yard (100 a, 101 a, 102 b, 103 a, 104 a, 105 a, 105 b, 106 b). (iii) through sleeper renewal (primary) for a length of 0.474 km at 8 bridges (pd 14, pd 21, pd 24, pd 84, pd 86, pd 127, pd 129, pd 139) in sse/pway/sspn sec. (iv) complete track renewal (p) of existing 60kg rails on 60kg psc with 60kg 90 uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn and 56/134-58/100 up between orh-tdv station in sse/pway/hup section. (v) through turnout renewal of existing curved switch and cms crossing with 60kg tws and 60kg weldable crossing-1 in 12 - total 48 nos in sbc-spgr sec in aden/ypr sec and tbr of points & crossings - 13 nos (5 nos in ndv, 4 nos in tdv & 4 nos in gbd yards) in sbc-spgr & sbc-dmm sec. (i) sbc-dmm sec : balance works in dpe-hup section in connection with ynk-pkd doubling project.sw ii : supply of ballast (cess collection) in connection with the work of extension of rd-6 to 580m duly slewing rd5 and modification in goods circulating area in dbu station.
Tender For execution of p.way works like trr(p), tsr(p), tbr, tfr, ttr (by tws & ors), renewal of sejs, glued joints, dowels & broken screw spikes, renewal of turnout sleepers, deep screening of points & crossings, deep screening of coal choked yard lines and mid-section lengths to avoid mud pumping, casual renewal of p&c sleepers, sej sleepers, dowels of p&c sleepers, reconditioning of inserts, replacement of broken screws, chair plates, fabrication of check rails, greasing of fishplates, opening of jammed ercs, grinding of rails, standardization of sand humps, dead ends & trolley refuges and other associated track works under the jurisdiction of senior section engineer/p.way(in-charge)/korba of bilaspur division.
Tender For track linking (excluding supply of rails, sleepers, ballast, thick web switch, s and t and ohe works) between km. 492.116 (f/hwh) to km.499.577 (f/hwh) of route e including other miscellaneous works in connection with construction of angul-sukinda new bg rail line under khurda road division of east coast railway in state of odisha, india