Tender For work of preventive maintenance, shutdown & emergency maintenance of iac/sac compressor, air washery fan/pump motor, acw/fcw motor of stage-2-wtps on as & when required basis.
Tender For supply of circuit breaker for tractionmotorblower and oil cooling unit (pos no. 53.1.59.1) type 4 as per clw spec. no. clw/es/3/0096 alt.d or latest and abb document no. hbtb 585554 r 3083 or latest. ]
Tender For corrigendum : supply of motor pulley od-350 mm with 4 nos spc-5300 belts, p. no: 35347010, for 2ha2qt air compressor , pulley for station inst. air compressor motor 98 kw/140 hp having od310mm width 260 mm 6 nos. v belts , pulley for air washery blowermotor of unit no. 5 four groove v-pulley section" c" , pulley for air washery blowermotor of unit 3 & 4, five groove v- pulley section" c"
Tender For supply of tractionmotorblower including motor (wound with corona resistance wire) to drg./specn. no. (1) clw/es/3/0019/g & (2) spec/e-10/3/09 (motor) with amendment nos. 01 to 06. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of top gasket for tractionmotorblower (tmb) as per drg. no. 4tacp7ka-08 for wap-7/ wag-9 locos. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of de side end shield for m/s cgl make tractionmotorblower (tmb) motor for wag-9/wap-7 locos as per drg. no. elw/bsl/2/wag-9/35.010. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of de side end shield for m/s-cgl make tractionmotorblower (tmb) motor for wag-9/wap-7 locos as per drg. no. elw/bsl/2/wag-9/35.010 [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of wheel assembly of auxilary generator and tractionmotorblower for wdg4 locomotives emd part no - 10635179 dlw part no -17020657. [ warranty period: 30 months after the date of delivery ] ]
Tender For service contract for dismantling and fabrication, installation and com-missioning of new air duct of air washery system#3c of unit-6 including supply of material under emiph dept.