Web Analytics Made Easy - StatCounter

Transformer Rectifier Repair Tenders

Get complete information related to latest Transformer Rectifier Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Transformer Rectifier Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Transformer Rectifier Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Private Sector

CTN :45564320 Due date: 21 Jun, 202621 Jun, 2026 NA
Tender For disposal, strictly on "as is where is" basis", burnt affected damaged transformer oil-approx quantity-41,000 liter (41 kl), "for additional information, please see the participant form." belonging to m/s. saurya urja company of rajasthan limited

CTN :45554785 Due date: 18 Jun, 202618 Jun, 2026 NA
Tender For annual tender for work of replacement of fail, burnt, augmentation dist.transformer mansa sdn under vijapur division office.

CTN :45554789 Due date: 18 Jun, 202618 Jun, 2026 NA
Tender For annual tender for work of replacement of fail, burnt, augmentation dist.transformer gozariya sdn under vijapur division office

corporations/Associations/Others

CTN :45402483 Due date: 19 Jun, 202619 Jun, 2026 NA
Tender For corrigendum : replacement of burnt and damage transformer under edd siddharthnagar

corporations/Associations/Others

CTN :45563342 Due date: 23 Jun, 202623 Jun, 2026 NA
Tender For work for replacement of burnt/ damaged distribution transformer under edd ii anandnagar

State Government

CTN :45512781 Due date: 27 Jun, 202627 Jun, 2026 NA
Tender For providing of custom bid for services - for reclamation of burnt and old transformer oil at various workshop under ewd, kanpur/jhansi/banda

CTN :45377056 Due date: 15 Jun, 202615 Jun, 2026 NA
Tender For corrigendum : providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - ins vikramaditya; repair rewinding of transformer 63kva, 380/220 view winding burnt; service provider

corporations/Associations/Others

CTN :45508579 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For auction sale of burnt transformer oil without drum at store gwalior

Central Government/Public Sector

CTN :45493102 Due date: 16 Jun, 202616 Jun, 2026 NA
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423; l006 during boat davit operation smoke observed from control transformer in control panel of boat davit and abnormal noise observed from hoisting gearbox lim..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423; l013 port blower of water jet compartment is not getting start zero insulation measured suspected winding burnt defect to be identified and rectified and sys..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423; l022 smoke observed from ac control panel during operation di dr carried out by ss and observed contactor coil and no nc switch burnt out contactor coil and..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423; l 023 main engine control battery charger is non operational defect identification carried out by ss and observed that control pcb is burnt same to be repair..

CTN :45112925 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For bid to ras tender for supply of disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva , shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva , draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva , m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed , all as per item no 4 above but lt copper coils complete all as specified and directed , m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva , m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed , m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed , dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account , s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed
 Loading, Please wait...

Connect us via What's Up