Web Analytics Made Easy - StatCounter

Transmission Line Item Tenders

Get complete information related to latest Transmission Line Item Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Transmission Line Item Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Transmission Line Item Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :41757339 Due date: 30 Sep, 202530 Sep, 2025 7.24 Lacs
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - replacement of type-a tower no-12 of 220kv south of wazirabad-kashmere gate d/c transmission line; electrical system or installation; as per nit

Central Government/Public Sector

CTN :41666743 Due date: 29 Sep, 202529 Sep, 2025 NA
Tender For procurement of acv auxiliary ard-25 spares - equipment: ac system, make / model:- sutrak carrier / tm 31 hd, primary filter- metal bowl, control cable series 40 (port) 28.0mtr, 4280 mm propeller pitch hose assembly 6. fittings @, 6800 mm propeller pitch hose assembly 5, fuel shut-off cable 24 mtrs, control cable series 40 (stbd) 24.5 mtr, hydraulic fluid low with plug and socket (electrotec), level sensor nmea 2000 3281-0321mm, out board strip 1, flexible exhaust link, standard closed segment, fwd landing skid rubber mount, filter drier, equipment: cpp system, make / model:- ghl uk, st/st rod end rh male m16 gar hw16rr, balanced steering cylinder kit 7065, 3010 mm propeller pitch hose assembly 4, 3220 mm propeller pitch hose assembly 1, long arm riveting plier, line mounted relief valve-rv10 26c3b n 15, taperlock bush aft lift fan (55mm dia) 3525-55, propeller layshaft bearing sleeve nut and tab washer, plumber block lip seal, key 18x10, key 20x12, key 18x11, transmission pulley, 6850 mm propeller pitch hose assembly 9, 4550 mm propeller pitch hose assembly 3, 1570 mm hose assembly 1. fittings @ 90 degree, 1520 mm hose assembly 3. fittings @ 110 degree, 2270 mm propeller pitch hose assembly 2, 1170 mm steering hose assembly 6, 1570 mm steering hose assembly 7, sleeve (h2313 ), eriks tpe r seal (85x120x12) 316 st/st, lock washer(mb13), 22313ek skf bearing, dowty seal 1/2" st/st, equipment:- deck / hull / skirt, sikaflex gun skeleton m301-075, rivet alum 4.8 x 19 mm, pop rivet alum 3.2 x 9.7mm, pop rivet 4.8 x 10mm/ 5 mm big head rivet/ rivets pop 4.8mm (ad66sb ), screw csk posi a2, nut/ nylock nut m6 a2/ m6 nut nylone, washer m6 penny a2/ m6 penny washer, standard craft tool kit, hull emergency repair kit contains: 1xalum sheet 2mm, standard open segments, skirt emergency repair kit, 4130 mm skirt shift assembly 4. bulkhead ram.stbd (h0021807), inboard 4mm cheveron strap, hose assly 3/8"(360 mm skirt shift hose), hose assly 3/8"(370 mm skirt shift hose), metal oval hatch, rapid link 14mm large mouth, hose assly 3/8" (240 mm skirt shift hose assly 7 valve-valve (h0021810), hydraulic cyclinder seal kit skirt system, d shackle 20mm ed621120, strop matrix inboard 5+f68mm (red), strop matrix inboard 4mm (red), round inspection hatch/ plastic round hatch, strop matrix outboard 4mm (black), rope strop 7/8 870mm, cold skirt bonding agent, strip shackle 8mm, d shackle 8mm, nut cap nylon 1/2" 05500 13cn, bridge plate, strop matrix outboard 5mm (black), vetus ufo stainless deck ventilator, skirt shift matrix assembaly, outer loop, inner loop, rivet alum pop, washer m8, m10 washer form b, rudder, elevator blade, 2830 mm skirt hose assembly 1. bulkhead - ram. port(h0021804), starboard inboard rudder, tie rod long, tie rod feedback, tie rod short, temperature switch, rod end m 12 (sme 45.12), rod end m8, inboard 5mm chevron strop, hose clamp, 8mm key pin shackle, 8mm bow shackle, equipment: lift fan, make / model :- ghl uk, shaft lift fan, fwd lift fan bearing, taper lock bush3020x50, washer spring m12, screw m12x30, taper lock bush 75 mm bore, bolt m8 x 25 hex hd a4, drive belt 14mgt-1610, aft lift fan bearing, lift fan shaft seals - aft, equipment:- steering, make / model:- accu steer hm-260, emergency steering hydropack, equipment:- electrical, make / model:- accu steer hm-260, strip led, orange beacon, light stern with assy/3541002 24v, light starboard side 24v 3541002(green), spare bulb, bulb (flap switch)en507026, spare bulb 02-90400006, essential supply isolator 24 v dc coil albright sw80-1907, canbus cable can-201

State Government

CTN :41672726 Due date: 09 Sep, 202509 Sep, 2025 55.19 Lacs
Tender For name of the work major overhauling of 02 nos kt1150 engines and 01 novt28 l engine cummin s make of san locomotives assisting for dismantling of kt1150 and vt28 l engines from the locomotives joint inspection of testing of overhauled engines shall be conducted between kpcl representative and firms representative joint inspection report of testing jirt after completion of re assembly shall be furnished to this office joint inspection of testing may be waived off at the discretion of the undersigned but the test report shall be furnished.removal and re installation of engine. this includes the complete procedure of safely removing the engine from the locomotive and, after completion of the necessary repair or overhaul work, re-mounting the engine back into the locomotive. all required tools, fixtures, lifting mechanisms, and safety measures shall be managed by the vendor.engine alignment process the alignment process involves precise positioning and securing of the engine to ensure correct interfacing with the locomotives drivetrain coupling systems, and support structures this includes, but is not limited to mounting of the engine onto the engine bed frame using proper alignment tools and calibrated instruments ensuring parallelism and angular alignment of the engine relative to the transmission or traction system verifying coupling concentricity and ensuring there is no misalignment that may lead to premature wear vibration or operational issues tightening of mounting bolts to specified torque values and rechecking alignment post tightening conducting necessary trial runs and adjustments if any to confirm proper functionality before final handover all the released items shall be returned in separate packing along with overhauled engines to kpcl

Central Government/Public Sector

CTN :41679111 Due date: 22 Sep, 202522 Sep, 2025 48.50 Lacs
Tender For repair / maint of lt external electric power transmission system, control panel , ceiling fan ,wall mounted fan, dg set, amf panel , summer appliances and other allied electrical works at site p thane under ge(af)thane

Private Sector

CTN :41625529 Due date: 09 Sep, 202509 Sep, 2025 NA
Tender For request for proposal document for selection of bidder as transmission service provider through tariff based competitive bidding process to establish inter-state transmission system for inter-regional strengthening between special repair grid and wr grid is issued by rec power development and consultancy limited
 Loading, Please wait...

Connect us via What's Up