Get complete information related to latest Tree Cutting Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Tree Cutting Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Tree Cutting Tenders.
Tender For corrigendum : work of removing/cutting grass, trees and all type of vegetation with root by digging and providing & spraying anti weed spray chemical as and when required basis in switchyard at unit-8,wtps.
Tender For corrigendum : supply of flood fighting materials with utilisation as an when required basis during the monsoon period 2025 for the jurisdiction of ranaghat irrigation section i under ranaghat irrigation sub-division ranaghat nadia. - supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg)., earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same onembankments, clannels, filling depressions in requisite profile, levelling as per direction of the engineer-in-charge within a lead of (d) beyond 3.00 km and upto 4.00 km (this rate inclussive royalty @ rs.29.00 per m3, compensation @ rs.25.00 per m3 & cess @ rs.5.30 per m3 with the basic rate). assembled=rs. (229.00+29.00+25.00+5.30)=rs. 288.30, labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per irection of engr-in-charge (cost is excluding the cost of any types of filling materials).nb:- volume of earth/ sand filled bags should not be less than 0.028cum/ bag., extra rate for item no above for each additional lead of 60 metre or partthereof beyond the initial lead of 30 metre., dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts, cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by engineer-in-charge
Tender For corrigendum : supply of flood fighting materials with utilisation as an when required basis for coming monsoon 2025 under the jurisdiction of ranaghat irrigation section ii under ranaghat irrigation sub division. - supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg)., earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same onembankments, clannels, filling depressions in requisite profile, levelling as per direction of the engineer-in-charge within a lead of (d) beyond 3.00 km and upto 4.00 km (this rate inclussive royalty @ rs.29.00 per m3, compensation @ rs.25.00 per m3 & cess @ rs.5.30 per m3 with the basic rate). assembled=rs. (229.00+29.00+25.00+5.30)=rs. 288.30, labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per irection of engr-in-charge (cost is excluding the cost of any types of filling materials).nb:- volume of earth/ sand filled bags should not be less than 0.028cum/ bag., extra rate for item no above for each additional lead of 60 metre or partthereof beyond the initial lead of 30 metre., dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts, cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by engineer-in-charge
Tender For corrigendum : procurement of flood fighting materials along with cutting cleaningofjungles along withclosesurveillance of the banks of river bhagirathi attarapur embankment durinng the monsoonperiod of theyear2025under thejurisdictionofranaghat irrigation sub div. - supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg)., earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same onembankments, clannels, filling depressions in requisite profile, levelling as per direction of the engineer-in-charge within a lead of (d) beyond 3.00 km and upto 4.00 km (this rate inclussive royalty @ rs.29.00 per m3, compensation @ rs.25.00 per m3 & cess @ rs.5.30 per m3 with the basic rate). assembled=rs. (229.00+29.00+25.00+5.30)=rs. 288.30, labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per irection of engr-in-charge (cost is excluding the cost of any types of filling materials).nb:- volume of earth/ sand filled bags should not be less than 0.028cum/ bag., extra rate for item no above for each additional lead of 60 metre or partthereof beyond the initial lead of 30 metre., dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts, cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by engineer-in-charge
Tender For dismantling cc leveling and compacting excavation for road way cutting of trees clearing grass granular sub base clearing grass demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 cc 1_1 5_3 centering and shuttering plastering etc