Get complete information related to latest Trolley Line Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Trolley Line Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Trolley Line Tenders.
Tender For vasai road- trd work in connection with proposed lifting of track & conversion of unregulated ohe of up diva and dn diva into regulated ohe.
Tender For gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h-beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
Tender For corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h-beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
Tender For jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
Tender For 1)conversion of fp/swr track to lwr track for 15.533 km( ed-6.892, ptj-7.181, s sa- 0.7 & nmkl -0.760) twsej- 22sets & gj - 148 sets 2.(i)casual renewal of conventiona lsejs with thick web sejs-140sets (ii) renewal of glued joints-200 sets over various sections of sa divn( 150 nos- 60kg & 50nos. -52kg) (3) renewal of guard rails and sleepers on bridges/rob/fob over salem division.
Tender For aden/central sub division:- (i):- proposed conversion of swp into lwr for a length of 10.967 km at various station yards in sse/pway/ bg/mdu,mg/mdu,mnm & adpt section.(ii):-through fittings renewal (plain track) of main line in sse/pway/mg/mdu & mnm jurisdiction. (iii):-through fittings renewal (plain track) of loop line and other lines at various station yards in sse/pway/bg/mdu,mg/mdu,mnm & adpt jurisdiction. (iv) through rail renewal (secondary) for a length of 2.445 km at various loop lines in madurai station yard.(v) deep screening by ballast cleaning machine for a length of 31.00 km at isolated locations between km:-439.300 to 482.800 on up main line in between station dg-ser in sse/p.way/bg/mdu section."
Tender For aden/south sub division ( in sse/pway/ vpt & svks section ) :- ctr (p) for 1.600 km by manual in kgd yard (road 1 up main line) and 0.100 km by manual in ty yard (down line), trr (s) for 4.231 km at various station yards, tsr (p) in road 2 at vpt yard, bridge and approach sleeper renewal for 4 bridges in sse/pw/vpt section, tfr (p) on plain track at various station yards and on main line for 49.593 km, conversion of swp intolwr on main lines for 1.639 km at vpt yard, and renewal of 10 sets of sej at vpt, srt, and svks stations.
Tender For aden/sct sub division:- yard improvement works at sse/pway/ sct & puu sectionsw-i : sengottai station:- dismantling of existing cement concrete apron & ctr(p) with 60 kg rails and psc-60 kg sleepers on road no.1.sw-ii renewal of sej 25 sets in loop line and 32 sets in puu section main linesw-iii conversion of swp into lwr on loop lines & other linessw-iv tfr (p) on plain track in yards