Get complete information related to latest Tungsten Carbide Die Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Tungsten Carbide Die Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Tungsten Carbide Die Tenders.
Tender For supply of control and trip valves for fuel oil system - ldo flow control valve nb80 300 a , diagnostic software b , actuator diaphragm for control valves c , gland packing for control valves d , pneumatic actuator assembly e , diaphragms orings f , smart positioner for control valve g , pneumatic air filter regulator h , air lock relay i , ldo main trip valve aa , light oil 3 way return trip valve bb , burner trip valves atomising air cc , burner trip valves lfo dd , burner trip valves air scavenging ee , ldo main trip valve nb100 300 ff , gland packing for fo trip valves gg , actuator diaphragm for burner trip vlves hh , gland packing for burner trip valves ii , actuator diaphragm for fo trip valves jj
Tender For supply of rotary actuator with linear translation mechanism , automation hardware including motion controller and motors , hmi for system monitoring and parametric control , system control panel , system integration and programming
Tender For purchase of sports exercise physiology lap equipments - cardiopulmonary exercise testing system system should be compact can be used in laboratory operation and low maintenance costs and easy servicing. system should be state of the art computerized telemetry breath test analyzer for on-line breath by breath measurement of exercise test of respiratory system to measure following parameter: time, ve, bf(rr), hr, feo2, feco2, peo2, peco2, vo2, vco2, ve/vco2(eqco2), ve/vo2(eqo2), rq(rer), vd/vt, vo2/kg, vo2/kg/hr, met, watt(work), hr, ttot, ti, te, ti/te, ti/ttot, pef, pif, br, vet, sum, tv/te, o2 kinetics, oxygen deficit, oxygen debt parameters and indirect calorimetric. wireless hr recording system, indirect cardiac output by wassermann algorithm system should comply ats and ers guide line and it should be ce certified., iso certified system should have automatic ambient conditions measuring system. system should work under temperature range 0 to 50 celsius. system should have facility for automatic calibration of analyzers. volume transducer calibration with precision calibration syringe. system should meet following technical specification flow rate measurement: measuring headpiece should be either through turbine /dvt/ pneumotach and dead space less then 40 ml, it should not be affected by humidity , flow range +/- 18 l/s and accuracy 2% oxygen analyser : should be either electrochemicalcell/paramagnetic and measurement range 0- 100 %,response time t90 100 ms and accuracy +/-0,04 % and- resolution 0,02 %carbon dioxide analyser : should be ndir (infraredabsorption) and measurement range 0 - 10 %,-response time t90 90 ms , accuracy +/- 0,04 %, andresolution 0,02 % software should support latest windows or latest andin corporate customized predicted normal equations.software should be capable of changing graphics displays during real time testing. system should have facility for automatic treadmill or bicycle ergo meter control. should be supplied with software, standard accessories for operation manual carrying case for field use. system should be supplied with latest data acquisition system, deskjet printer and ups. system should comply en iso 13485:2003, en iso 9001:2000, ec certificate93/42/eec, programmable treadmill running machine with user terminal (display &keyboard) stand- alone and remote control via rs232 running surface: l:170 cm (minimum), w: 65 cm (minimum) maximum possible load: 200 kg (440 lbs) speed range: 0-40 km/h elevation: 25% (14 maximum elevation) motorized adjustment, reverse belt rotation. motor system 3.3 kw, single phase ac motor, maintenance free and brushless power transmission: frequency inverter, poly v- belt, very quiet operation safety system: emergency-off safety stop switch (safety lanyard with actuator, pull cord and clip); potential equalization bolt; transformer for potential-isolation from the mains ambient condition: temperature: +10to +40 degrees c, humidity 30 to 70% display (resolution): lcd display heartrate monitoring: wireless transmitter; the treadmill should be able to interface with well-known compatible metabolic gas analyzer as per standard and custom exercise protocols different programs safety harness-1. indispensable accessory for stress testing, accident prevention and for the general safety of athletes.2. safety arch with different heights and widths to fit all running machines.3. an emergency stop at the crossbar of the safety arch allows automatic stop of the running belt in the moment a fall occurs.4. the harness and chest belt (available in 5 sizes: xxs, s, m, l, xl) secure the subject and prevents falling over to the front.5. chest belt straps do not pinch or restrict the athlete", programmable ergometer functional design and excellent stability, load up to 160kg. easy to use saddle, handle bar and pedals speed independent and dependent power control handle bars are easy to change to suit different tests, rotatable by 360 degrees. mechanical/motor-assisted seat a
Tender For supply of seal kit for solenoid valve,connection size 1/4 bsp(f),rating 24vdc-h,5/2 way,make rotex,solenoid valve type vaf213-2g-24v-dc-h, seal kit for solenoid valve,connection size 1/4 bsp(f),rating 24vdc-h,5/2 way,make rotex,solenoid valve type vaf214-2g-24v-dc-h, 5/2 way spool type single sov with coil, model vaf213-2g+24vdcwithout manifold make rotex service mrs sv1 & sv2 of mill reject system, complete solenoid valve,connection size 1/4 bsp(f),rating 24vdc-h,5/2 way,make rotex type vaf214-2g-24v-dc-h, complete set for actuator,make rotex ,actuator model no. ecf200, seal / maintenance kit for actuator, make rotex ,actuator model no. ecf200, limit switch assembly for actuator, model- ecf200, make-rotex, complete power cylinder set consisting of a. pneumatic postioner,b. air lock relay,c.afr, & d.flow control valve, make rotex,model spc-d-s-mp2-av-bg-su-100/100, bellow for power cylinder, make rotex , power cylinder model no. c-d-s-av+bg+su-mp2-100/100
Tender For supply of materials as per the technical specifications given in the work order.shifting of material to work place.inspection of material in presence of indenter.power off the existing system, isolation & removing of existing seal steam control valve hydraulic actuator assembly and shifting to designated area (stores.replacing the new electrical actuator system in the existing location, ensuring of all power, signal cables and power on the system.calibration of electrical actuators and operation shall be carried out locally and from dcs (control room) and feedback shall be ensured.it is the complete responsibility of the firm to execute the job & to bring back the system in to operation without time delay.any additional spares, tools required for carry out the above work shall be contractor/supplier scope.power and signal cable will be supplied by kpcl and cable laying is in contractor scope.the necessary tools, tackles, instruments etc. required for commissioning, testing/ checking the healthiness of the system has to be arranged by the supplier.it is the complete responsibility of the contractor to see that total system shall be commissioned without delay & should function smoothly.any additional sparesitems/tools required to execute the work shall be suppliers scope. additional mechanical civil works shall be included in contractor s scope. single point responsibility of the supplier to execute the job without latching delay.during the warranty/ guaranty period the supplier have to replace any no. of defective spares with good ones (new items) at free of cost, required for smooth functioning of the system. hence you are informed to arrange for new items immediately without any delay.the bidder shall arrange to submit 02 sets of operation and maintenance manual along with approved drawings.the scope is of retrofit/enhancement feature for existing system. hence, it is the responsibility of the contractor to visit the site and study the existing arrangement of the electrical actuator to be retrofitted.integrated site acceptance test for supplied electrical actuator shall be demonstrated to kpcl & mutually acceptance of the same.if any additional materials required for completion of work, the bidderhave to supply and system shall be commissioned with minimum down time.