Tender For bid to ras corrigendum : supply of repair to tata mobile 088271h - labour charge for servicing and replacement and fixing of unserviceable filter , engine oil 15w40 , diesel fuel filter , oilfilter , coolant , steering oil , break oil , clutch oil , air filter , labour charge computerised wheel alignment and wheel balancing , labour charge for removing and refixing after fuel tank cleaning , labour charge servicing replacement defective parts of door and making up the bends and rubber hose , labour charge servicing and replacement of unserviceable front disc , brake rubber boot , labour charge for servicing external clogging of intercoolers and radiator making up defects as reqd , material and labour for servicing and replacement of unservicable drive belts , labour charge serving and making up defects for bleeding of clutch actuation system , labour charge servicing and replacement of necessary defects for proper sealing of air intake system , labour charge servicing and tightening all fasterners , fasterners with acessories , labour charge for checking and replacement as necessary defects in electrical system ensure usage of genuine fuses with correct ratings condition of fuse and relay holding , fuses with relay , labour charge for check steering wheel play check for proper condition of ball joints and rubber boots of tie rod drag link for looseness damage , rubber boots of tie rod , labour charge for complete servicing of door with necessary replacement , labour charge for checking of wiper assembly and replacement of unserviceables parts and painting , wiper motor stator rewinding , wiper motor armature winding , wiper motor fxing materials , wiper linkage , wiper blade , wiper arm , labour charge for complete dismantling and servicing of rear load leaf spring and bending and refitting the same and replacement of unserviceables parts , rear spring bushing kit , centre bolt , clamp , labour charge for complete burnt starter from vehicle and replacing following parts , solenoid switch , carbon brush set , bushing set , fitting kit , labour charge for complete dismantling of steering from the vehicle , replacement of steering center line assy , replacement of steering center line pin kit , material and labour for rectifing denting filling painting as existing , material and labour for servicing washing and greasing
Tender For repair and rewinding of borewell 02 to 7.50 hp motor and pump repair under raibag tp. - the lifting of submersible pumpset from well., the re-errection charges of pumping machineries including overhauling and painting, the motor base with pin, the circlips, the gun metal bearing, centrifugally cast aluminium bronze bearing bush, the stud and nuts, the carbon housing (thrust bearing block assembly complete with segment bearing pad., the carbon housing, the lock ring, the lower flange, the upper flange, replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one year for the stator of motor 4 to 5 h.p, the discharge outlet (do) bearing do steel brush do bearing., the impeller (shell moulded with aluminium and bronze.), the guide vane, the oil seal and steel bush, the oil seal., the intermediate piece (ip) with ip leaded bronze brush., replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for the bowls of same type and make., rewinding of submersible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and testing. for all types of submersible pumpsets etc.(with guarantee period not less than 6 months) for all types of submersible pumpsets above 7.0 hp and upto 7.5h.p., the labour charges for overhauling of the pump set., supply of the brass filter, supply of the strainer, supply of cable guard, the non return valve (nrv) assembly complete with rubber o ring., the pump coupling (stainless steel), the pump key (stainless steel), the pump shaft made out of stainless steel counterless ground with key way (upto 8 stages). extra for each stage at rs.40/-, the allen screw, the steel bearing bush (do steel bush), rewinding of submersible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and testing. for all types of submersible pumpsets etc.(with guarantee period not less than 6 months) for all types of submersible pumpsets above 3 hp and upto 5.0 h.p.