Get complete information related to latest Tweezer Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Tweezer Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Tweezer Scrap Tenders.
Tender For corrigendum : supply of balancing disc of bfp 200khi , bearing disc. of bfp 200khi , thrust collar of bfp 200khi , bfp bearing journal bearing, ss ds , balance drum 200khis , balance drum liner of bfp 200khis , thrust collar of bfp 200khis , thrust nut of bfp 200khis , o ring for bfp cartridge assy. body 200khis , o ring for suction side cartridge assy. 200khis , balancing drum o ring 200khis , oil ring of bfp motor bearing mat. brass , oil guard of bfp , labyrinth seal of motor bearing of bfp, material - aluminum
Tender For repair of veh d d - auxiliary gear box balancing rod , balancing rod removing the gear box and new balancing rod fitting , auxiliary gear box repair and service , auxiliary gear box mounting bracket , balancing rod , auxiliary gearbox mounting bush , popular shaft spider bearing , popular shaft universal joint old removing with lathe machine and new fitting , the gear box removing and above all parts removing and new parts , auxiliary gearbox balancing assy , auxiliary gearbox mounting bracket , male female nuts and bolt , ramp assy repair service and testing , liner sleeve , head gasket hino engine , connecting rod bearing , valve inlet exhaust , valve guide , valve seal , piston ring , turbo charger repair and service with damaged rings and packing change , head gasket taken to the lathe machine shop and checking the head , rotary pump removing the veh and taken to the pump house and pump , the above mentioned all parts removing the engine parts fully cleaning , balancing rod broken change , water pump , the above mentioned removing and new parts fitting and veh
Tender For supply of pump shaft_pn_1 , bearing bracket housing d e _pn_2 , cover for brg hous d e _pn_4 , sleeve nut d e _pn_7 , collar inter stage_pn_8 , bush inter stage_pn_9 , impeller 1st stage_pn_10 , impeller 2nd stage_pn_13 , wearing ring casing_pn_16 , shaft sleeve_pn_17 , water seal tube_pn_18 , water seal ring_pn_20 , gland half_pn_21 , lock washer for bearing_pn_24 , lock nut for bearing_pn_25 , shaft collar_pn_26 , cover for brg hous n d e _pn_28 , sleeve nut n d e _pn_29 , bearing bracket housing n d e _pn_44 , pump shaft_pn_m590bd2 , oil ring_pn_m590bd3 , gland half_pn_m590bd7 , water seal ring half_pn_m590bd9 , shaft sleeve d e _pn_m590bd10 , suction end casing_pn_m590bd11 , wearing ring casing neck ring_pn_m590bd12 , impeller_pn_m590bd14 , imp key_pn_m590bd15 , combined diffuser and return vane_pn_m590bd18 , neck bush_pn_m590bd19 , delivery diffuser_pn_m590bd21 , stay bolt_pn_m590bd22 , large seating and bush_pn_m590bd26 , imp key_pn_m590bd27 , balance valve_pn_m590bd30 , balance valve cover_pn_m590bd31 , shaft sleeve n d e _pn_m590bd32 , sleeve nut n d e _pn_m590bd33 , gasket_pn_m590bd36 , hex hd cap screw_pn_m590bd37 , oil sight window assy _pn_m590bd39 , bearing bush_pn_m590bd40 , brg cap and brg body d e and n d e _pn_m590bd41 , sleeve nut d e _pn_m590bd43 , stud bolt with nut_pn_m590bd45 , stud bolt with nut_pn_m590bd47 , balancing water conn line assy _pn_m590bd48 , hex hd bolt with nut_pn_m590bd53 ) /bid number : gem/2026/b/7547538 * /dated: 23-05-2026 & & / bid document 1 / 60
Tender For supply and installation of furniture for boys hostel - iii at nliu, bhopal - supply of furniture, providing steel almirah mirror having overall size 910w(+ 05mm) x 500d(+ 05mm) x 1980 (+ 05mm) h , top , bottom , side panel made up of 1mm thick crca sheet powder coated , legs or pedistal and shelves made up of 1.2mm thick crca sheet powder coated and height of thelegs or pedistal should be 130 mm(+ 05mm), shutter made up of 1mm thick crca sheet powder coated , no sharp edges of almirah ends, all shelve rack divided into equal parts , door die cast chrome plated handles fitted with washer & double nut , handles ring made of pvc cap , almirah all metallic panels screw with nut & bolt, metal pipe & 07 tank treatment with minimum 50 micron powder coating. shelving height-wise adjustable shelf mounting: uniformly distributed load capacity per each full shelf is 40 kg maximum. three horizontal shelf partitions are provided made of 1.2 mm crca steel top shelf clear space height from bottom is 1050 mm and second shelf height from bottom is 700 mm and third shelf height 350 mm; 1mm crca sheet fitted with heavy duty 25mm. hanging rod 02 nos. 25mm dia med guage ss capsule pipe is provided on the top in the centre. locking & handle - s.s. handle with 2 way locking mechanism with shooting rod/bolt arrangement. 5mm tk plain mirror (make-modi, asahi, saint gobain) of size 400 mm x 1200 mm is to be provided on one flap fixed with the help of m.s. clips/beading as per approval. whole steel structure is epoxy powder coated to the thickness of 50 microns in approved shade/color and texture. the work includes all required m.s. hinges, handle, lock, bolts and hardware of good and approved quality etc. compete. this job includes all installation, material & labor etc. complete and nothing will be paid extra for execution/installation of the item. items should have 5-year warranty., providing hostel bed overall size 1980w(+ 10mm) x 960d(+ 10mm) x 810h(+ 10mm), hostel bed made of prime quality round metal pipe of size 38mm dia 1.2mm & 50x25mm thick crca rectangular pipe 1.2mm thick, head rest designed with 38mm dia with 25mm round support pipes for supporting pillow having height of 810mm, bed mattress structure made from 50x25x 1.2 mm & 25x25x1.2 mm pipes, mattress support panel made of 12mm thick isi/bis grade bwp plywood, mattress panel height from floor should be of 450mm, four number of supports of size 25x25x1.2mm are given to mattress panel, additional 25x25x3mm angle used under ply along with headboard & footboard having length of 100 mm of each, the complete structure should be in knockdown construction and assembled with nut & bolts, all open edges of pipes should be covered by good quality ppcp shoes/caps, . all metal components should be pre-treated with zinc phosphating in minimum 07 tank process and then powder coated with epoxy polyester with approved shade, thickness of coating should be minimum 50 micron. .items should have 5 year warranty., providing study table overall size 900w(+ 05mm) x 600d (+ 05mm)x 750h(+ 05mm) , table top made up of 16mm thick bwp termite proof ply wood , 0.8mm mica on top and 0.6 mm balancing mica on bottom isi/bis standard as applicable for the product with 2mm thick pvc edge bending , understructure made of crca 40x40x1.2mm square metal pipe duly powder coated, understructure crca square metal pipe 40x40mm x 1.2mm thick made in knockdown condition, table provided with one side storage single drawers fixed pedestal with depth of 575mm(+/- 05mm) ,storage should be of size 300 mm (w) and 120 (h). the storage support ms pipe25x25x1.mm . storages made of 1.2mm thick crca metal sheet duly powder coated , all opend ends closed with ppcp caps & shoes, all metal parts shall be welded properly strongly and conformity with regulations, the table structure should be in knockdown condition, all metal components should be pre-treated with zinc phosphating in minimum 11 tank process
Tender For supply of auxiliary gear box balancing rod , balancing rod removing the gear box and new balancing rod fitting , auxiliary gear box repair and service , auxiliary gear box mounting bracket , balancing rod , auxiliary gearbox mounting bush , popular shaft spider bearing , popular shaft universal joint old removing with lathe machine and new fitting , the gear box removing and above all parts removing and new parts , auxiliary gearbox balancing assy , auxiliary gearbox mounting bracket , male female nuts and bolt , ramp assy repair service and testing , liner sleeve , head gasket hino engine , connecting rod bearing , valve inlet exhaust , valve guide , valve seal , piston ring , turbo charger repair and service with damaged rings and packing change , head gasket taken to the lathe machine shop and checking the head , rotary pump removing the veh and taken to the pump house and pump , the above mentioned all parts removing the engine parts fully cleaning , balancing rod broken change , water pump , the above mentioned removing and new parts fitting and veh