Get complete information related to latest Upvc Pipes Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Upvc Pipes Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Upvc Pipes Tenders.
Tender For work of flue gas duct repair from economiser outlet to aph inlet, hot &cold air duct repairs above 9 mtr. level, g.s. line valve servicing of unit 4 boiler at ntps 210 mw during coh.
Tender For providing of custom bid for services - crn 4629 service contract for calibration of flue gas analyser and supply of spares at igstpp jharli jhajjar haryana
Tender For repair of bag house equipment in crmp- 1) cage repair( bending minor welding & painting), 2) cleaning and fixing of bags( opening the chamber, removing the venturies, taking out bags cleaning with and refixing) once in year, 3) cleaning of dust collecting hopper of bag house, 4) repair of dust hopper and its doors, 5) bag house screw conveyor body repair, 6) bag house screw conveyor hanger bearing with shaft changing, 7) bag house screw conveyor end bearing changing, 8) bag house screw conveyor coupling repairs, 9) bag house screw conveyor changing, 10) en masse conveyor drive sprocket changing, 11) en masse conveyor tail sprocket changing., 12) en masse conveyor drive chain fixing, 13) en masse conveyor links changing, 14) en masse conveyor drive unit coupling repair, 15) en masse conveyor drive chain rejointing in snap, 16) maintenance of rotary air locks (twice in a year), 17) bucket elevator belt rejointing in case of snap, 18) bucket elevator drive pulley changing, 19) bucket elevator boot pulley changing, 20) bucket elevator fallen buckets fixin, 21) pulse jet solenoid valves repair and maintenance, 22) drier maintenance in compressor house (4 driers), 23) maintenance of compressed air pipe line, 24) id fan casing removal and fixing back to faciltate for fan changing, 25) id fan casing cutting and fixing back during bearing changing, 26) id fan casing changing, 27) id fan casing repair work, 28) id fan suction duct patch work, 29) id fan delivery duct patch work, 30) to make arrangement for chimney cleaning on id fan delivery duct near chimney and duct opening and closing there.., 31) dust hopper gate replacement, 32) dust hopper vibrofeeder replacement, 33) dust hopper body repair patch work, 34) flexible hose to pulse jet replacement, 35) pulsing pipe changing, 36) pulsing pipe repair, 37) cyclone patch work, 38) flue gas duct leaks arresting patch works.
Tender For digital enhancement uptime services for forbes marshall make 6 nos. dust analyzers (unit 1 to 6) and 2 nos flue gas analyzers of unit 2 & 4 and maintenance services for flue gas analyzer of unit 6 at stps, suratgarh.
Tender For purchase of water suply material - submersible motor pump for use in 200mm dia borewell(tubewell), single phase 215volt line-to-neautral, 50hz frequency, motor rating 3.73 kilowatt/05 horsepower, discharge head- 100m/328.08foot or high, number of stages 08 or more, for handling of clear,cold,drinkable water, conforming to is:8034 and is:9283, bee energy star rating- 3star or more, bis certified make, popular make:- waterman,rockwell,kirloskar,duke plasto, lubi, uom- each, submersible motor pump for use in 200mm dia borewell(tubewell), three phase 415volt line-to-line, 50hz frequency, motor rating 7.4 kilowatt/10 horsepower, discharge head- 120 m/393.7 foot or high, number of stages 08 or more, for handling of clear,cold,drinkable water, conforming to is:8034 and is:9283, bee energy star rating- 3star or more, bis certified make, popular make:- waterman,rockwell,kirloskar,duke plasto, lubi, uom- each, submersible motor pump for use in 200mm dia borewell(tubewell), three phase 415volt line-to-line, 50hz frequency, motor rating 9.3 kilowatt/12.5 horsepower, discharge head- 120 m/393.7 foot or high, number of stages 12 or more, for handling of clear,cold,drinkable water, conforming to is:8034 and is:9283, bee energy star rating- 3star or more, bis certified make, popular make:- waterman,rockwell,kirloskar,duke plasto, lubi, uom- each, submersible motor pump for use in openwell, three phase 415volt line-to-line, 50hz frequency, motor rating 14.9 kilowatt/20 horsepower, discharge head- 100 m/328.08 foot or high, number of stages 08 or more, for handling of clear,cold,drinkable water, conforming to is:14220:1994 reaffirmed 2009, bee energy star rating- 3star or more, bis certified make, popular make:- waterman,rockwell,kirloskar,duke plasto, lubi, uom- each, submersible motor pump for use in openwell, three phase 415volt line-to-line, 50hz frequency, motor rating 7.46 kilowatt/10 horsepower, discharge head- 100 m/328.08 foot or high, number of stages 08 or more, for handling of clear,cold,drinkable water, conforming to is:14220:1994 reaffirmed 2009, bee energy star rating- 3star or more, bis certified make, popular make:- waterman,rockwell,kirloskar,duke plasto, lubi, uom- each, submersible motor pump for use in openwell, three phase 415volt line-to-line, 50hz frequency, motor rating 11.19 kilowatt/15 horsepower, discharge head- 100 m/328.08 foot or high, number of stages 08 or more, for handling of clear,cold,drinkable water, conforming to is:14220:1994 reaffirmed 2009, bee energy star rating- 3star or more, bis certified make, popular make:- waterman,rockwell,kirloskar,duke plasto, lubi, uom- each, submersible motor pump for use in openwell, three phase 415volt line-to-line, 50hz frequency, motor rating 48.49 kilowatt/65 horsepower, discharge head- 100 m/328.08 foot or high, number of stages 08 or more, for handling of clear,cold,drinkable water, conforming to is:14220:1994 reaffirmed 2009, bee energy star rating- 3star or more, bis certified make, popular make:- waterman,rockwell,kirloskar,duke plasto, lubi, uom- each, starter for 5hp single phase motor pump, star-delta starter for 10hp three phase motor pump, star-delta starter for 12hp three phase motor pump, star-delta starter for 15hp three phase motor pump, star-delta starter for 20hp three phase motor pump, rigid upvcpipes for supply of potable water for public consumption, as per is 4985:2000 latest, one end socketed and other end plain such that the two pipes could be joined with the help of solvent cement, bis certified make, lengh of one unit of pipe 20foot/6meter nominal outside diameter- 63mm, pressure nominal- 0.60mpa/6.0 kg per square centimeter, uom- each, rigid upvcpipes for supply of potable water for public consumption, as per is 4985:2000 latest, one end socketed and other end plain such that the two pipes could be joined with the help of solvent cement, bis certified make, lengh of one unit of pipe 20foot/6meter nominal outside diameter- 75mm, pressure nomina
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot