Web Analytics Made Easy - StatCounter

Viaduct Tenders

Get complete information related to latest Viaduct Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Viaduct Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Viaduct Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :40958771 Due date: 21 Jul, 202521 Jul, 2025 34.06 Lacs
Tender For repairing and renovation of existing median near al-bl crossing, painting repairing of footpath allied walls at street no. 03 repairing of mastic asphalt road after micro tunneling for damaged drainage line its allied works at salt lake bypass

Central Government/Public Sector

CTN :40962135 Due date: 25 Jul, 202525 Jul, 2025 NA
Tender For custom bid for services - farm filed and operation job contract -1a. field/farm job work for the period 01.09.2025 to 31.08.2026 67160 man hours/12 months= 23 points- wetting of saw dust 6 qtls. mixing bag filling, autoclaving,, spawning, shifting bags to incubation room, composting yard,, spwan unit, incubation room, wetting wheat straw 8 qtls., mixing, filling in tunnel,, spawning of oyster and milky mushroom, shifting to, incubation room, composting yard,, spawning area, wetting wheat straw 3 ton, mixing ingredients, stack, formation, mixing ingredients on alternative day and filling, in tunnel, phase-ii composting, -dowetting of saw dust 6 qtls. mixing bag filling, autoclaving,, spawning, shifting bags to incubation room, composting yard,, spwan unit &, incubation room, wetting wheat straw 8 qtls., mixing, filling in tunnel,, spawning of oyster and milky mushroom, shifting to, incubation room, composting yard,, spawning area, wetting wheat straw 3 ton, mixing ingredients, stack, formation, mixing ingredients on alternative day and filling, in tunnel, phase-ii composting and continuation of, experiments of previous month, -dospawning of button mushroom compost, shifting bags to, incubation rooms, media preparation, cotton plugging., spawning area, and cropping, rooms, maintaining of cropping room condition, 13 rooms (12x16), like watering, cleaning, casing., -, harvesting, removal of used bags, preparation of casing,, casing of bags, cropping rooms, used bags emptying in pits, collection of used bags,, washing and treatment for empty rooms., -dowetting of cotton ginning mill waste (4 qtls.), mixing of, ingredients, stacking, turning, filling in tunnel, spawning,, plastic sheet covering, room cleaning, dusting of office and, labs etc., composting yard, wetting of wheat straw (4 qtls.) for milky and oyster, mushroom (3 qtls.) filling in tunnel, spawning, casing,, harvesting, watering, etc., composting yard, and cropping, room, daily watering in 13 cropping rooms, harvesting and, cleaning of cropping rooms, cropping rooms, removal of used bags, cleaning of rooms, disposing in, pits,, cropping rooms, and nearby area, substrate wetting (4 qtls.) of paddy straw mushroom,, mixing of ingredients, pile making, turning and filling in, tunnel, composting yard, wetting of wheat straw (4 tonnes) mixing ingredients,, shifting of tunnel, spawning, casing and watering,, harvesting, etc., cropping room, wetting saw dust, mixing wheat bran, filling in bags,, autoclaving, spawning, shifting to incubation rooms,, watering, cleaning, composting yard, watering in cropping rooms, cleaning, casing, filling,, packing, pesticide spraying, media preparation, millipore, water., cropping rooms, wetting of wheat straw (2 tonnes), stacking, turning, filling, in tunnel, spawning, bag filling, shifting to incubation room,, casing, watering, harvesting, etc. and continuation of, experiments of previous month, composting yard, and cropping, rooms, wetting wheat straw (4 qtls.) for oyster mushroom, mixing,, filling in tunnel, spawning, bag removal, watering,, harvesting, cleaning of rooms, etc., -dowetting saw dust (3 qtls.) mixing, autoclaving, spawning,, shifting to incubation room, etc., -docasing material preparation, tunneling, casing, watering,, digging pits, etc., -dowetting saw dust, mixing wheat bran, filling in bags,, autoclaving, spawning, shifting to incubation rooms,, watering, cleaning, -dowetting 6 qtls. of saw dust for shiitake and agrocybe,, mixing, filling in bags, autoclaving, spawning, shifting to, incubation rooms, etc., composting yard, wetting 6 qtls. wheat straw, mixing ingredients, turning,, inserting pvc pipes, covering with sheet, spawning,, shifting bags to incubation rooms,, -domaintaining cropping rooms, watering, cleaning, etc. cropping room, casing mixture preparation, sieving, filling in tunnel, casing, on spawn run bags, watering, -doharvesting, re-casing, watering, cleaning, etc. cropping rooms, wetting of wheat straw (4

corporations/Associations/Others

CTN :40935023 Due date: 28 Jul, 202528 Jul, 2025 62.61 Crore
Tender For relief trunkmain of 1600 mm dia. by micro tunneling from panjrapole cross road to madhuli hotel in east zone of annual maintenance contract area

State Government

CTN :40912013 Due date: 30 Jul, 202530 Jul, 2025 9.76 Crore
Tender For transportation of metro rail cars and associated machines or equipnt, including loading or unloading with insurance coverage, from mandale depot to elevated viaduct of line 4 and 4a between gaimukh to cadbury metro station and vice versa.

Central Government / Public Sector

CTN :40919021 Due date: 19 Aug, 202519 Aug, 2025 NA
Tender For scr construction organisation: proposed construction of road over bridges (robs) with standard rdso spans including construction of rob road approaches (viaduct and reinforced earth wall portions) and limited height subways (lhs as 1 x 6.0m x 3.0m rcc box) between various railway stations in secunderabad division of south central railway. # sw-i: rob in lieu of lc no.6 at km:355/26-28 between kazipet-hasanaparti road. # sw-ii: rob in lieu of lc no.33 at km:251/11-13 between yadadri -wangapalli. # sw-iii: rob in lieu of lc no.40 at km:291/14-16 between peddapalli - raghavapuram. # sw-iv: rob in lieu of lc no.46 at km:282/8-10 between raghavapuram-ramagundam. # sw-v: rob in lieu of lc no.49 at km:275/46-48 between ramagundam- raghavapuram. # sw-vi: rob in lieu of lc no.64 at km:381/28-30 between warangal-chintalpalli. # sw-vii: rob in lieu of lc no.80 at km:436/11-13 at mahbubabad yard.

Central Government And Public Sector

CTN :40509420 Due date: 22 Jul, 202522 Jul, 2025 NA
Tender For corrigendum : detailed design consultancy services for 14 (fourteen) elevated stations viz. kharadi chowk dandekar pul, excluding viaduct in station portion on kharadi khadakwasla corridor of pune metro rail project.

State Government

CTN :40775056 Due date: 17 Jul, 202517 Jul, 2025 61.00 Lacs
Tender For pre and post monsoon deep cleaning work at viaduct of metro line 2a, line 7 and charkop depot line for the period of 3 years.

Central Government / Public Sector

CTN :40865669 Due date: 03 Jul, 202503 Jul, 2025 NA
Tender For balance re work of katni grade separator bypass line project, which involves design, supply, installation, testing and commissioning of 2x25kv / 25 kv, ac, 50hz ohe on viaduct, retaining wall and ground

Central Government And Public Sector

CTN :40546621 Due date: 18 Aug, 202518 Aug, 2025 1424.00 Crore
Tender For corrigendum : design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Central Government / Public Sector

CTN :40808825 Due date: 07 Aug, 202507 Aug, 2025 NA
Tender For scr construction organisation: proposed construction of road over bridges (robs) with standard rdso spans including construction of rob road approaches (viaduct and reinforced earth wall portions) and limited height subways (lhs as 1 x 6.0m x 3.0m rcc box) between various railway stations in secunderabad division of south central railway. # sw-i: rob in lieu of lc no.6 at km:355/26-28 between kazipet-hasanaparti road. # sw-ii: rob in lieu of lc no.33 at km:251/11-13 between yadadri -wangapalli. # sw-iii: rob in lieu of lc no.40 at km:291/14-16 between peddapalli - raghavapuram. # sw-iv: rob in lieu of lc no.46 at km:282/8-10 between raghavapuram-ramagundam. # sw-v: rob in lieu of lc no.49 at km:275/46-48 between ramagundam- raghavapuram. # sw-vi: rob in lieu of lc no.64 at km:381/28-30 between warangal-chintalpalli. # sw-vii: rob in lieu of lc no.80 at km:436/11-13 at mahbubabad yard.
 Loading, Please wait...

Connect us via What's Up