Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - wt 5170g various maintenance works of wagon tippler 1 to 3 in coal handling plant at tps ukai on as and when required basis chp 1 and 2; as per schedule b and scope of w..
Tender For corrigendum : procurement of wagon tippler system spares for chp ntpc bongaigaon - guide shoe, tega mcnally bharat, guide shoe, mcnally bharat, adjustable guide top, tega mcnally bharat, guide shoe, tega mcnally bharat, adjustable guide btm, tega mcnally bharat, clmp arm gde bk, 1y001000270082, clamp arm brckt bot,6, tega mcnally, hyd cyl, 1b020+0002&18, sprg buffer, 1b020+0002&10, bracket, 1b020+0002&6, tega mcnally bharat, arm, 1b020+0002&2,tega mcnally bharat, sac, hinge shaft, 1b020+000285, guide wheel assy, 1b020+&4, top beam assy, 1b020vd001000188, cup&cone,tega mcnally bharat, bush bearing, tega mcnally bharat
Tender For providing of operation and maintenance power house / power plant - work of realignment & relinking of rail track at inhaul & outhaul of wagon tippler 1 of btps
Tender For tggenco ytps 5x800mw chp em ii carrying out preventive, operational and emergency breakdown maintenance works of c and i including plc and connected field equipments, ups panels and its batteries, integrate weigh bridge and other equipments pertaining to wagon tippler 3 and 4 including sac, af, dc, hpp, paddle feeders 5 to 8, stacker 2 and 3 and reclaimer 2, crushers 5 to 8 and vgf 5 to 8 for the period of 3 month from the date of commencement of work at chp ytps
Tender For labour charges for attending miscellaneous maintenance works like changing plummer blocks, hydraulic hoses, o-rings, chain links, buffer springs, emergency and breakdown works etc., for wagon tippler i,ii and iii from the date of issue of loi to 30.09.2026.
Tender For biennial service contract for operation and maintenance of both wagon tippler and stacker cum reclaimer- 1 and 2 at chp stage-ii and iii (2x 500mw , 660 mw) sgtpp.
Tender For corrigendum : carrying out of preventive, operational and emergency maintenance works of lt switchgears, lt motors, lt cables in paddle feeders 5, 6, 7 8, wagon tippler 3 4, stacker 2 3, reclaimer 2 and crusher motors scoop panels, vgf 5, 6, 7 , 8 etc pertaining to stage ii from actual date of commencement of work to a period of 3 months at chp ytps for the fy 2025 to 26.