Tender For dismantling, of 27b ilms extracting terminal lead, shifting, relocationg of 10 ton hoist at jt-6 and supply and fixing of bearing for 75 kw dc motor for apron feeder at wt-4 in chp-2 area
Tender For supply of 9040m25d86 tower spares for etp-oem spares for automobiles, foot operated pedal bin orbucket for bio - medical waste collection, spares for tripperand apron feeder, high mast lighting tower for large areawith led flood lighting system, spares tyre for tyrecoupling, xlpe cable for working voltages up to andincluding 1.1 kv as per is 7098 (part 1), pvc fills for collingtower, spare / add on battery packs for transreceiver -handheld, spares for coal mills of thermal power stations,personal safety kit reflective luminous garments
Tender For work of repairing and reconditioning of damaged apron feeder pans in chp 3x660 mw ktps, koradi. ref. :- ktps / pur / 2025-26 / chp-mm-660 / rfx-t-58984
Tender For online electronic bids through electronic tendering system (ets) are inviting e-tender in two bid system for the supply of ropeways spares - ropeways spares, bush for apron feeder, material en-9, as per drg m-1212-27, bush for roller size: 70*59.64*38 mm, en-9, as per drg m-1212-01, apron chain roller with 02 no. gun metal bush fitted, en-19, as per drg m-1212-01, shaft for apron feeder, en-19, as per drg m-1212-27, deliver period: single phase (within 8-9 weeks).note: mtc is required from a government approved lab for all items.
Tender For 1) operation & maintenance work contract for hydraulically operated pedestal mounted stone grapple machine on as and when required basis installed in c.h.p.-ii (1x500 mw), t.p.s., khaperkheda, 2) work of complete repairing, reconditioning and refurbishment along with all required spares & accessories for the travel system of shuttle conv. 1 to 4 installed at chp-i, tps khaperkheda, 3) work of providing, fixing and testing of coal flow establishment system for conveyor chutes of apron feeder no. 1 to conv. 2c, apron feeder no. 2 to conv. 2d and conv. 3a to conv. 4a installed at chp-i (4 x 210 mw), tps khaperkheda, 4) work of annual overhaul maintenance of air preheater for unit no. 4, 5) work of repairing flue gas duct from eco outlet to esp inlet during unit no.4 coh., 6) work contract for conveyor belt jointing by cold / hot vulcanizing process at c.h.p.-ii,t.p.s. khaperkheda, 7) servicing of various doors, manholes of boiler during unit no. 4 aoh, 8) biennial work contract for housekeeping/cleaning to be carried out in service building acw/ccw p/h, time office etc at unit-5, 500mw, khaperkheda tps., 9) supply & application of chemical bonded plastic refractory for boiler during unit no. 4 aoh., 10) procurement of 22" victaulic coupling and sampling plug assy for coal pipes for unit 3 & 4, 11) work of radiography and interpretation of hp weld joints in boiler unit 4 during coh, 12) work of repair of boiler first & second pass buck stay in unit no. 4 coh., 13) supply of pa fan shaft for ndv 18 tiefstack in unit no. 1 & 2., 14) procurement of dresser coupling & coupling collars for coal pipe in unit no. 1 aoh, 15) procurement of guillotine gates chain links for u#4 coh for ahp-i, 16) supply & application of chemical bonded and firecrete refractory in boiler second pass and flue gas duct during unit no. 4 coh., 17) procurement of glands packing & spiral gaskets for coh u#1&4., 18) supply & application of fire crete refractory and allied works of bah for unit no. 4 coh, 19) procurement of fabricated burner tilt pins, levers & spares for 210 mw unit aoh, 20) procurement of spares for bfp recirculation valves.(u # 4 coh)., 21) servicing of gates & dampers of air & flue gas path in unit no. 4 aoh., 22) procurement of rcw headers and scalloped bars for unit 1 aoh of bah., 23) replacement of damaged g.i. roof sheets above at wagon tippler, bobr hopper area and various conveyor belts galleries at chp-i, khaperkheda tps., 24) procurement of various low pressure and low temperature steel consumable for u#1 coh., 25) supply of liner assembly (in 2 halves) for upper housing of coal mill xrp-803 hp at unit no. 1 & 2., 26) work of fabrication and replacement of reheater coil stub bend assemblies during unit no. 4 coh, 27) overhauling/servicing of low pressure valve during unit no. 1 & 4 capital overhaul, 28) procurement of various gromet slings for capital overhauling of unit 1 and 4, 29) removal and shifting of ndct drift eliminator during coh at unit no. 05, 1x500 mw, tps, khaperkheda., 30) work of providing and fixing of conveyor spillage control equipment at chp-i, tps, khaperkheda.
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; power house equipment, apron feeder in coal handling plant; service provider
Tender For btps - chp - removal of spilled over coal, fine dust and wet coal at apron feeder floor and bcn - 2ab tunnel including fg floors by head loads on to running conveyor required in mm/chp/btps from 01.08.2025 or actual date of commencement of work to 30.11.2025
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu