Get complete information related to latest Vrb Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Vrb Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Vrb Repair Tenders.
Tender For supply of cadium copper conductor (130 sqmm) large span wire(37/2.10 mm) as per rdso specn.ti/spc/ohe/cat cu-cd /0971, str: ti-str-020-rev02. accepted - cadmium copper conductor (130 sqmm) large span wire(37/2.10 mm) as per rdso specn.ti/spc/ohe/cat cu-cd /0971, str: tistr- 020-rev02.make/brand : vmv [ warranty period: 30 months after the date of delivery ]
Tender For construction of 25.00 mtr. span rcc t-beam bridge on chewla to tapog road at rd. 8/700 under pmgsy-iv (package no. hp-09-779-a) (sh: geotechgnical investigation).
Tender For supply of instln of modular overhead partition and pvc laminate with 600 600 9 mm inclusive of complete fitting fixing and commissioning works , instln of acoustic soundproofing wall panels 12 mm inclusive of complete fitting fixing and commissioning works , instln of 300 1200 mm panel light fixtures inclusive of complete fitting fixing and commissioning works , instln of full span indoor carpeting inclusive of complete fitting fixing and commissioning works , instln of integrated glass door with ordnance crest embossed and inbuilt safety inclusive of complete fitting fixing and commissioning works , instln of integrated industrial evaporative duct air coolers with 30 to 40 l tank capacity inclusive of complete fitting fixing and commissioning works , instln of aoc historical information signage using backlit acrylic boards with led focus lighting inclusive of complete fitting fixing and commissioning works , instln of backer board made of durable and water resistant material inclusive of complete fitting fixing and commissioning works , solid wooden partition ) /bid number : gem/2026/b/7477729 * /dated: 01-05-2026 & & / bid document 1 / 13
Tender For rehabilitation of 45 mtr span malonipani bridge to bring back superstructure to its original position, replacement and fixing of all bearings and followed by load testing of bridge at km 12.572 on anini-mipi road under 1446 bcc/752 brtf/ce(p) udayak