Web Analytics Made Easy - StatCounter

Washing Tank Tenders

Get complete information related to latest Washing Tank Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Washing Tank Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Washing Tank Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43332588 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For supply of retention tank with s-trap & without pressurised flushing for lwlrrm coaches to drg.no.mi006418, alt-c, anx-1 and as per specn. mdts-26001, rev-04(except clause 3.5 pressurised flushing system) for special terms and condition for procurement of retention tank system for lhb coaches.

Central Government/Public Sector

CTN :43087530 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For corrigendum : supply of retention tank with s-trap & without pressurised flushing for lwlrrm coaches to drg.no.mi006418, alt-c, anx-1 and as per specn. mdts-26001, rev-04(except clause 3.5 pressurised flushing system) for special terms and condition for procurement of retention tank system for lhb coaches.

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

State Government

CTN :43328333 Due date: 15 Jan, 202615 Jan, 2026 NA
Tender For const of solar system water tank and sinking deep well at mudipara ramnagar i

Central Government/Public Sector

CTN :43332109 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For supply of water tank replacement 3500 ltrs,hose reel replacement,hub greasing,wheel alingment,pressure guage,compound guage,throttle wire with outer,pto pneumatic system,differential oil,coolant replacement,gear oil, pto oil, pump oil,wiper blade replacement,r2 foam line,labour charges,engine servicing complete overhauling,painting of complete vehicle,pneumatic valve,hose pipe radiator 2 inch,pto bearing,pto oil seal,air pipe 8 mm,hex nipple brass x 4mm,pto overhauling,pto packing,oil filter,diesel filter,throttle wire,throttle outer,2 inch jubly clamp,half inch jubly clamp,ss nut bolt 10x40 with washer,high tension nut bolt with washer 10x35,half inch cooling line pipe,exhaust primer service,exhaust primer nozzle,labour charges

Central Government And Public Sector

CTN :43312866 Due date: 30 Dec, 202530 Dec, 2025 NA
Tender For strengthening overhead water tank, underground water storage system at port colony, 0ot vadinar

CTN :43321760 Due date: 02 Jan, 202602 Jan, 2026 NA
Tender For supply of automatic tank gauging system for 04 underground fuel tank including 100 rfid tag

CTN :43332682 Due date: 15 Jan, 202615 Jan, 2026 NA
Tender For supply and installation of electric online automatic water chlorination dosing system for borewell and piped water supply tank municipal council sakti

CTN :43185364 Due date: 29 Dec, 202529 Dec, 2025 NA
Tender For corrigendum : supply of fabrication of generator off loading system , fabrication of dummy drop tankand transportation trolley , inclusion of wing tips with hard points on pralay , fabrication of inhibition rig for facilitating the storage servicing of drop tank
 Loading, Please wait...

Connect us via What's Up