Tender For part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18
Tender For i. operation of piped water supply schemes by deploying pump operators and payment of electricity charges and. ii. comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws), single village piped water supply schemes (svs), ward level piped water supply schemes in quality affected wards (wls_quality) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge.
Tender For operation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge.
Tender For remainign work of ward no-6, 7 and 13 ward level pipe water supply scheme and its design, construction, supply, testing and commissioning of piped water supply schemes with electric driven pumps for non-quality habitation wards in bhagalpur districts of bihar on turn-key basis with 3 months trial run after commissioning and comprehensive operation and maintenance of 60 months after successful completion of trial run period under mukhyamantri nishchay yojna (non-quality affected) on turn-key basis under p.h. division, bhagalpur west, bhagalpur in block-goradih, panchayat-bishanpur, ward no.-6, 7 & 13 (group no-01)
Tender For maintenance and operation of dg sets, storm water pumps, substation and electrical installation, lt panel board at storm water pump houses under pwd, emd south east and sub division r-23,24 and 2025 under south east road-2, new delhi.
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of
Tender For est.no.rsd/ow/773/2025-26 providing replace switchboards, led tube lights, ceiling fans, gysers, water cooler , water pumps, switchgears and cables for nursing collage, hostels and dharmashala near premices civil hospital ratnagiri tal dist ratnagiri