Web Analytics Made Easy - StatCounter

Water Centrifugal Pump Tenders

Get complete information related to latest Water Centrifugal Pump Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Water Centrifugal Pump Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Water Centrifugal Pump Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45540427 Due date: 04 Jul, 202604 Jul, 2026 20.00 Lacs
Tender For repair/maint of centrifugal pump sets, submersible pump set, panel starters, flocculator and chemical dosing system and connected items under ge ramgarh cantt

State Government

CTN :45317693 Due date: 01 Jun, 202601 Jun, 2026 NA
Tender For repair/renovation of milton roy make chemical dosing pump installed at tube wells delivery and main delivery lines inside bhagirathi wtp in ac-68.

State Government

CTN :45317703 Due date: 01 Jun, 202601 Jun, 2026 NA
Tender For repair/renovation of milton roy make chemical dosing pump installed over new and old ugrs at bhagirathi bps in ac-68.

Central Government/Public Sector

CTN :45287972 Due date: 11 Jun, 202611 Jun, 2026 45.00 Lacs
Tender For repair and maint of overhead water tank, air compressor, irp, chemical dosing system, borewell, starter panel incl external pipeline network and connected items installed at various pump houses at af stn mohanbari

corporations/Associations/Others

CTN :45192961 Due date: 26 May, 202626 May, 2026 5.76 Lacs
Tender For regular operation and maintenance of water supply scheme with material at industrial area, residential colony and commercial complex jhunjhunu phase-i and ii - item rate, regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing/rewinding, lowering and un-lowering etc.the scope of work also includes repair and maintenance of panel board, main switches, kit-kates, electric connections, service cableand submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells.it is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular upkeeping of log book etc. and other works as mentioned in tender document / scope of work complete in all respect and as directed by engineer in-charge., regular operation and maintenance of pump houses located at wss complex/complexes.the work includes operation of distribution line main valves for daily supply of water of the industrial area at supply times specified by corporation. regular operation of pump house installed with existing centrifugal / monoblock pump / motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction/delivery pipes jointing material, panel, main switches, kit-kates, electric connections, service cable including cost of material and labour required for repairing / rewinding, removal and replacement etc. for uninterrupted functioning of electric panels and pump sets with regular up-keepment of log books, repair of leakages in pump glans and ms/ci/ac pipeline system inside of wss campus complete, regular chemical dosing in cwr maintaining general cleanliness at pump house and wss campus complete in all respect as directed by engineer in-charge., repair & maintenance of existing distribution / rising main pipe line system consisting of ac pressure pipeline /pvc/upvc/hdpe/ci/ di lines for maintaining smooth water supply in area covered under the scope of work.the scope of work includes timely repairing of leakage in all existing distribution / rising main pipeline of all sizes by digging out suitable size of pit in soft & loose soil / hard soil including cutting of bituminous / cement concrete / wbm / wmm surface at any site of work at no extra cost.it is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit / trench by excavated soil by ramming it at all sides of pipes & upto ground level. contractor will do dewatering at his own level by making necessary arrangements, if required. contractor will usetheir own t&p and jointing materials, however the pipe line and sluice valves (if required) etc. shall be provided by the corporation but the contractor shall have to deposit the damaged material in riico store. but no additional payment shall be made on account of any material or transportation charges.

Central Government/Public Sector

CTN :45031921 Due date: 26 May, 202626 May, 2026 30.00 Lacs
Tender For corrigendum : repair/ maint of external water supply distribution system including reconditioning of irp, chemical dosing pump, rising and distribution pipe lines and other connected items installed at pump houses at af stn dinjan under ge (af) mohanbari

State Government

CTN :45163807 Due date: 28 May, 202628 May, 2026 20.67 Crore
Tender For design, drawing, construction, testing, commissioning of collecting well capacity 300kl with canal intake arrangement by 300 mm dia d.i. connecting pipeahead of collecting well 50 m long , raw water pumps and motors 61975 lph & 34m head -3 no, raw water electric sub station 100 kva/33/0.415 kv with all required work, 3 mld conventional type water treatment plant,clear water centrifugal pumps and motors 59550 lph & 80m head-3 no clear water electric sub station 160 kva/33/0.415 kv with all required work, 270 kl capacity 30 staging mbr. , providing, laying, jointing and testing & commissioning of raw water pumping main di k-9 250 mm dia length 1800 m and clear water pumping main 250 mm dia length 7069 m &clear water gravity mains pipe di k-7 300 mm dia – 1636m., o-pvc pipe pn-16 250mm to 110mm dia dia – 61525m., total length- 63161 m with all required valves & specials, providing and fixing bulk flow meters for entire scheme upto village ohts allied all civil works including boundary wall around wtp campus, after completion of all components of the scheme 03 months of testing and 09 months trial run of entire scheme (with defect liability period of one year). (on risk and cost bases)multi village scheme -dugga-batrablock- bhaiyathandistrict –surajpur

State Government

CTN :45163812 Due date: 28 May, 202628 May, 2026 16.76 Crore
Tender For design, drawing, construction, testing, commissioning of floating pontoon of size 5x3 mtr at jhumka dam, raw water electric sub station100 kva/11/0.415 kv with all required work,raw water hscf pump sets 2 no of 10hphaving discharge - 97656 lph and against 20.0m head at floating pontoon station site, 2.0 mld conventional type water treatment plant, clear water centrifugal pump set 03 nos of 30hp having discharge 93750 lph against 101m head, clear water electric sub station 100 kva/11/0.415kv with all required work at wtp site, 120 kl capacity 30m staging mbr-1 no at village salka,100 kl capacity 16m staging mbr-2 no at village salka, providing, laying, jointing and testing & commissioning of raw water pumping main di k-9 pipe 250 mm dia- 200m and clear water pumping main 150 mm dia di k-9 pipe-3820 m,di k-9 pipe200mm dia-1210 m ,total length-5030 m& clear water gravity mains di k-7 pipe 300 mm dia l= 6128m.& o-pvc pipe pn-16, 160mm dia – 5423m. 250 mm dia –7487m, 110mm dia – 31711 m. total length- 50749 m with all required valves &specials,as per attached key plan map, providing and fixing bulk flow meters, nala crossing and work include taking permission to pwd, wrd deptt. etc. allied all civil works including boundary wall around wtp campus. work completion is 12 months including rainy season integrationof all component, comprises of three month testing & 09 month trial run of entire scheme (with defect liability period of one year). (on risk and cost basis)group water supply scheme narkeliblock- baikunthpurdistrict –korea

State Government

CTN :45163815 Due date: 28 May, 202628 May, 2026 31.24 Crore
Tender For design, drawing, construction, testing, commissioning of intake well 6m dia 22m height approach bridge 45m length, approach road, electric sub station 250 kva/11/.415 kv with all required work,raw water v.t. pumps and motors 03 no each of 15hp which can discharge 88076 lph against totalhead of29 m at near village katkona, 3.0 mld conventional type water treatment plant, 02-nos of clear water centrifugal pumps and motors each of 12.5 h.p. which can discharge ,25963 lph against head of 65m head and 3 nos of centrifugal pump of 95 h.p. which can discharge 71572 lph against 223m head ,along with the construction of 3 no of mbr,mbr-1 at village near salka 110 kl capacity 30 m staging mbr-2, 60 kl capacity 30 m staging at village katkona, mbr-3 215 kl capacity 30 m staging at village koda, providing, laying, jointing and testing & commissioning of raw water pumping main di k-9 250 mm dia length 250 m and clear water pumping main 150 mm dia di k-9 length 2810 m,200mm dia length 19109m,250 mm dia 4905m total 26824 m&clear water gravity mains pipe o-pvc pn-25 250mm dia – 6343m, ,250mm diao-pvc pn-16 -2063 mtr,160 mm diao-pvcpn-16– 31051m,110 mm diao-pvc pn -16-47136 m . total length- 86593 m with all required valves & specials as per attached key plan map, providing and fixing bulk flow meters, ,nala crossing and work include taking permission to department. likepwd, wrd etc. allied all civil works including boundary wall around wtp campus. work completion is 12monthsincluding rainy season integrationof all component,testing& trial run comprises of 03 month testing & 09 month trial run (with defect liability period of one year),balance work under bardar- multi-village water supply scheme of block khadgawan, district m.c.b (c.g.) (on risk and cost basis).

State Government

CTN :45150975 Due date: 28 May, 202628 May, 2026 20.23 Crore
Tender For design, drawing, construction, testing, commissioning of intake well 6 m dia height 26.70 m with 3 no rose piece, a 350mm dia d.i. connecting pipe ahead of intake well 200 m long , raw water pumps and motors 70298lph & 60m head -3 no, raw water electric sub station 100 kva/33/0.415 kv with all required work, 3 mld conventional type water treatment plant,clear water centrifugal pumps and motors 67594 lph &105m head-3 no & 12916 lph & 40m head -2 no, clear water electric sub station 160 kva/33/0.415 kv with all required work, 650 kl capacity 25 staging mbr. rcc clear water sump capacity 20 kl, providing, laying, jointing and testing & commissioning of raw water pumping main di k-9 250 mm dia length 1960 m and clear water pumping main 100 mm dia di k-9 length 1276 m & 250 mm dia 3810 m total length 5086 m & clear water gravity mains pipe di k-7 350mm dia – 966m., di k-7 300mm dia – 5611m., & o-pvc pipe pn-16 250mm-3595m ,160mm dia – 7701 m., 110mm dia – 27796 m. total length- 45669 m with all required valves & specials, providing and fixing bulk flow meters & entire scheme upto village ohtsallied all civil works including boundary wall around wtp campus, quarters. after completion of all components of the scheme 03 months of testing and 09 months trial run of entire scheme (with defect liability period of one year). (on risk and cost bases) biharpur mvs
 Loading, Please wait...

Connect us via What's Up