Tender For removal of silt inside the pump house repair and varnish of pumping machinary and providing and fixing monoblock and electricl accessories providing and fixing12 hp mono block pumpset
Tender For annual repair & m/0 lwss barota susnal in tehsil ghumarwin distt bilaspur(sh:- repair of 20hp pump kirloskar make set no.1 stages 7(b) repair of 3 hp submersible mono block ksb set no.ii and allied accessories)
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - municipal corporation bhilai supela; repairing of power pump submersible or mono block or open well pump repairing & rewinding testing etc complete job 1 point 0 h p - 2..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - municipal corporation bhilai supela; repairing of power pump submersible or mono block or open well pump repairing & rewinding testing etc complete job 3 h p - 5 h p po..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - municipal corporation bhilai supela; repairing of power pump submersible or mono block or open well pump repairing & rewinding testing etc complete job above 5 h p powe..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - municipal corporation bhilai supela; repairing of power pump submersible or mono block or open well pump repairing & rewinding testing etc complete job repairing of open..,repair, main
Tender For providing installation of 20hp electric mono block pump set and 10hp 6inch borewell submersible pump set and other repair work of pump house at gec campus farmagudi.
Tender For design, drawing, construction, testing, commissioning of collecting well capacity 300kl with canal intake arrangement by 300 mm dia d.i. connecting pipeahead of collecting well 50 m long , raw waterpumps and motors 61975 lph & 34m head -3 no, raw water electric sub station 100 kva/33/0.415 kv with all required work, 3 mld conventional type water treatment plant,clear watercentrifugalpumps and motors 59550 lph & 80m head-3 no clear water electric sub station 160 kva/33/0.415 kv with all required work, 270 kl capacity 30 staging mbr. , providing, laying, jointing and testing & commissioning of raw waterpumping main di k-9 250 mm dia length 1800 m and clear waterpumping main 250 mm dia length 7069 m &clear water gravity mains pipe di k-7 300 mm dia – 1636m., o-pvc pipe pn-16 250mm to 110mm dia dia – 61525m., total length- 63161 m with all required valves & specials, providing and fixing bulk flow meters for entire scheme upto village ohts allied all civil works including boundary wall around wtp campus, after completion of all components of the scheme 03 months of testing and 09 months trial run of entire scheme (with defect liability period of one year). (on risk and cost bases)multi village scheme -dugga-batrablock- bhaiyathandistrict –surajpur
Tender For design, drawing, construction, testing, commissioning of floating pontoon of size 5x3 mtr at jhumka dam, raw water electric sub station100 kva/11/0.415 kv with all required work,raw water hscf pump sets 2 no of 10hphaving discharge - 97656 lph and against 20.0m head at floating pontoon station site, 2.0 mld conventional type water treatment plant, clear watercentrifugalpump set 03 nos of 30hp having discharge 93750 lph against 101m head, clear water electric sub station 100 kva/11/0.415kv with all required work at wtp site, 120 kl capacity 30m staging mbr-1 no at village salka,100 kl capacity 16m staging mbr-2 no at village salka, providing, laying, jointing and testing & commissioning of raw waterpumping main di k-9 pipe 250 mm dia- 200m and clear waterpumping main 150 mm dia di k-9 pipe-3820 m,di k-9 pipe200mm dia-1210 m ,total length-5030 m& clear water gravity mains di k-7 pipe 300 mm dia l= 6128m.& o-pvc pipe pn-16, 160mm dia – 5423m. 250 mm dia –7487m, 110mm dia – 31711 m. total length- 50749 m with all required valves &specials,as per attached key plan map, providing and fixing bulk flow meters, nala crossing and work include taking permission to pwd, wrd deptt. etc. allied all civil works including boundary wall around wtp campus. work completion is 12 months including rainy season integrationof all component, comprises of three month testing & 09 month trial run of entire scheme (with defect liability period of one year). (on risk and cost basis)group water supply scheme narkeliblock- baikunthpurdistrict –korea