Tender For design, drawing, construction, testing, commissioning of collecting well capacity 300kl with canal intake arrangement by 300 mm dia d.i. connecting pipeahead of collecting well 50 m long , raw waterpumps and motors 61975 lph & 34m head -3 no, raw water electric sub station 100 kva/33/0.415 kv with all required work, 3 mld conventional type water treatment plant,clear watercentrifugalpumps and motors 59550 lph & 80m head-3 no clear water electric sub station 160 kva/33/0.415 kv with all required work, 270 kl capacity 30 staging mbr. , providing, laying, jointing and testing & commissioning of raw waterpumping main di k-9 250 mm dia length 1800 m and clear waterpumping main 250 mm dia length 7069 m &clear water gravity mains pipe di k-7 300 mm dia – 1636m., o-pvc pipe pn-16 250mm to 110mm dia dia – 61525m., total length- 63161 m with all required valves & specials, providing and fixing bulk flow meters for entire scheme upto village ohts allied all civil works including boundary wall around wtp campus, after completion of all components of the scheme 03 months of testing and 09 months trial run of entire scheme (with defect liability period of one year). (on risk and cost bases)multi village scheme -dugga-batrablock- bhaiyathandistrict –surajpur
Tender For design, drawing, construction, testing, commissioning of floating pontoon of size 5x3 mtr at jhumka dam, raw water electric sub station100 kva/11/0.415 kv with all required work,raw water hscf pump sets 2 no of 10hphaving discharge - 97656 lph and against 20.0m head at floating pontoon station site, 2.0 mld conventional type water treatment plant, clear watercentrifugalpump set 03 nos of 30hp having discharge 93750 lph against 101m head, clear water electric sub station 100 kva/11/0.415kv with all required work at wtp site, 120 kl capacity 30m staging mbr-1 no at village salka,100 kl capacity 16m staging mbr-2 no at village salka, providing, laying, jointing and testing & commissioning of raw waterpumping main di k-9 pipe 250 mm dia- 200m and clear waterpumping main 150 mm dia di k-9 pipe-3820 m,di k-9 pipe200mm dia-1210 m ,total length-5030 m& clear water gravity mains di k-7 pipe 300 mm dia l= 6128m.& o-pvc pipe pn-16, 160mm dia – 5423m. 250 mm dia –7487m, 110mm dia – 31711 m. total length- 50749 m with all required valves &specials,as per attached key plan map, providing and fixing bulk flow meters, nala crossing and work include taking permission to pwd, wrd deptt. etc. allied all civil works including boundary wall around wtp campus. work completion is 12 months including rainy season integrationof all component, comprises of three month testing & 09 month trial run of entire scheme (with defect liability period of one year). (on risk and cost basis)group water supply scheme narkeliblock- baikunthpurdistrict –korea
Tender For design, drawing, construction, testing, commissioning of intake well 6m dia 22m height approach bridge 45m length, approach road, electric sub station 250 kva/11/.415 kv with all required work,raw water v.t. pumps and motors 03 no each of 15hp which can discharge 88076 lph against totalhead of29 m at near village katkona, 3.0 mld conventional type water treatment plant, 02-nos of clear watercentrifugalpumps and motors each of 12.5 h.p. which can discharge ,25963 lph against head of 65m head and 3 nos of centrifugalpump of 95 h.p. which can discharge 71572 lph against 223m head ,along with the construction of 3 no of mbr,mbr-1 at village near salka 110 kl capacity 30 m staging mbr-2, 60 kl capacity 30 m staging at village katkona, mbr-3 215 kl capacity 30 m staging at village koda, providing, laying, jointing and testing & commissioning of raw waterpumping main di k-9 250 mm dia length 250 m and clear waterpumping main 150 mm dia di k-9 length 2810 m,200mm dia length 19109m,250 mm dia 4905m total 26824 m&clear water gravity mains pipe o-pvc pn-25 250mm dia – 6343m, ,250mm diao-pvc pn-16 -2063 mtr,160 mm diao-pvcpn-16– 31051m,110 mm diao-pvc pn -16-47136 m . total length- 86593 m with all required valves & specials as per attached key plan map, providing and fixing bulk flow meters, ,nala crossing and work include taking permission to department. likepwd, wrd etc. allied all civil works including boundary wall around wtp campus. work completion is 12monthsincluding rainy season integrationof all component,testing& trial run comprises of 03 month testing & 09 month trial run (with defect liability period of one year),balance work under bardar- multi-village water supply scheme of block khadgawan, district m.c.b (c.g.) (on risk and cost basis).
Tender For design, drawing, construction, testing, commissioning of intake well 6 m dia height 26.70 m with 3 no rose piece, a 350mm dia d.i. connecting pipe ahead of intake well 200 m long , raw waterpumps and motors 70298lph & 60m head -3 no, raw water electric sub station 100 kva/33/0.415 kv with all required work, 3 mld conventional type water treatment plant,clear watercentrifugalpumps and motors 67594 lph &105m head-3 no & 12916 lph & 40m head -2 no, clear water electric sub station 160 kva/33/0.415 kv with all required work, 650 kl capacity 25 staging mbr. rcc clear water sump capacity 20 kl, providing, laying, jointing and testing & commissioning of raw waterpumping main di k-9 250 mm dia length 1960 m and clear waterpumping main 100 mm dia di k-9 length 1276 m & 250 mm dia 3810 m total length 5086 m & clear water gravity mains pipe di k-7 350mm dia – 966m., di k-7 300mm dia – 5611m., & o-pvc pipe pn-16 250mm-3595m ,160mm dia – 7701 m., 110mm dia – 27796 m. total length- 45669 m with all required valves & specials, providing and fixing bulk flow meters & entire scheme upto village ohtsallied all civil works including boundary wall around wtp campus, quarters. after completion of all components of the scheme 03 months of testing and 09 months trial run of entire scheme (with defect liability period of one year). (on risk and cost bases) biharpur mvs