Get complete information related to latest Water Lifting Pump Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Water Lifting Pump Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Water Lifting Pump Tenders.
Tender For supply of spare parts articles / items for four wheeler part-iii - eicher 10.75 / eicher 10.90 bus lucas ac dynamo armature, eicher 10.75 / eicher 10.90 bus lucas ac dynamo bearing, eicher 10.75 / eicher 10.90 bus lucas ac dynamo carbon, eicher 10.75 / eicher 10.90 bus lucas ac dynamo commutator, eicher 10.75 / eicher 10.90 bus lucas ac dynamo complete, eicher 10.75 / eicher 10.90 bus lucas ac dynamo cutout, eicher 10.75 / eicher 10.90 bus lucas ac dynamo diode, eicher 10.75 / eicher 10.90 bus lucas ac dynamo pully, eicher 10.75 / eicher 10.90 bus lucas ac dynamo rectifier body, eicher 10.75 / eicher 10.90 bus lucas ac dynamo rectifire(-) / rectifire(+), eicher 10.75 / eicher 10.90 bus lucas ac dynamo rotter coil, eicher 10.75 / eicher 10.90 bus lucas ac dynamo starter coil, eicher 10.75 / eicher 10.90 bus lucas ac dynamo pump complete, eicher 10.75 / eicher 10.90 bus lucas ac dynamo pump rotter, eicher 10.75 / eicher 10.90 bus lucas ac dynamo pump body, eicher 10.75 / eicher 10.90 bus lucas ac pump complete, eicher 10.75 / eicher 10.90 bus lucas ac pump diaphrame, eicher 10.75 / eicher 10.90 bus lucas ac pump repair kit, eicher 10.75 / eicher 10.90 bus tvs ac pump to fuel tank pipe, eicher 10.75 / eicher 10.90 bus banco acceletor cable with cashing, eicher 10.75 / eicher 10.90 bus tvs acceletor paddle complete, eicher 10.75 / eicher 10.90 bus tvs acceletor spring, eicher 10.75 / eicher 10.90 bus tvs acclator rod, eicher 10.75 / eicher 10.90 bus m.m air cleaner complete, eicher 10.75 / eicher 10.90 bus m.m air cleaner hari, eicher 10.75 / eicher 10.90 bus tvs air cleaner hose pipe, eicher 10.75 / eicher 10.90 bus tata air compressure body, eicher 10.75 / eicher 10.90 bus tata air compressure connecting rod, eicher 10.75 / eicher 10.90 bus tata air compressure head, eicher 10.75 / eicher 10.90 bus tata air compressure housing, eicher 10.75 / eicher 10.90 bus tata air compressure pipe, eicher 10.75 / eicher 10.90 bus tata air compressure piston, eicher 10.75 / eicher 10.90 bus tata air compressure piston ring, eicher 10.75 / eicher 10.90 bus tata air compressure repair kit, eicher 10.75 / eicher 10.90 bus tata air compressure valve, eicher 10.75 / eicher 10.90 bus mico air filter, eicher 10.75 / eicher 10.90 bus tata air govenor complete, eicher 10.75 / eicher 10.90 bus tata air govenor kit, eicher 10.75 / eicher 10.90 bus tata air govenor piston, eicher 10.75 / eicher 10.90 bus tata air governor bearing, eicher 10.75 / eicher 10.90 bus tata air tank complete, eicher 10.75 / eicher 10.90 bus tata air tank socket, eicher 10.75 / eicher 10.90 bus tata air tank steel pipe, eicher 10.75 / eicher 10.90 bus lucas alternator rotter, eicher 10.75 / eicher 10.90 bus lucas alternator starter, eicher 10.75 / eicher 10.90 bus banco alumenium bit, eicher 10.75 / eicher 10.90 bus banco alumenium channel, eicher 10.75 / eicher 10.90 bus banco alumenium pipe, eicher 10.75 / eicher 10.90 bus lucas ampere meter, eicher 10.75 / eicher 10.90 bus m.m axel lock, eicher 10.75 / eicher 10.90 bus m.m axel packing, eicher 10.75 / eicher 10.90 bus m.m axel spring, eicher 10.75 / eicher 10.90 bus m.m axel washer, eicher 10.75 / eicher 10.90 bus m.m axle bearing (inner/outer), eicher 10.75 / eicher 10.90 bus m.m axle nut, eicher 10.75 / eicher 10.90 bus m.m axle oil seal, eicher 10.75 / eicher 10.90 bus m.m axle stug, eicher 10.75 / eicher 10.90 bus tata balance rod (f/r), eicher 10.75 / eicher 10.90 bus m.m bable penion, eicher 10.75 / eicher 10.90 bus m.m bable penion washer, eicher 10.75 / eicher 10.90 bus m.m bable socket, eicher 10.75 / eicher 10.90 bus m.m back door handle, eicher 10.75 / eicher 10.90 bus m.m back gear penion, eicher 10.75 / eicher 10.90 bus m.m back gear shaft, eicher 10.75 / eicher 10.90 bus lucas back light bulb, eicher 10.75 / eicher 10.90 bus lucas back light complete, eicher 10.75 / eicher 10.90 bus lucas back light glass, eicher 10.75 / eicher 10.90 bus lucas back switch, eicher 10.75 / eicher 10.90 bus tvs balance rod bush, ei
Tender For supply of overhauling kit for governor booster pum [overhauling kit for governor booster pump motor consisting of the following 05 items: 1) oil seal cr 5068 - 01 no. 2) spring steel finger spring washer of id:10.4mm, od:29.9mm, thickness:0.51mm - 01 no. 3) m.s flat washers of id:20.76mm, od:29.9mm, thickness: 0.44mm - 01 no. 4) m.s motor fixing studs of length: 137.44mm, dia:4.25mm, thread length: 38mm - 01 no. 5) 9/16 1/2 inch male brass adapter - 01 no. ]
Tender For custom bid for services - 30 mw & 14 mw tg miscellaneous works at nspcl-bhilai power plant-2- 10.10 tmstu61bd000 steam tur(bearing pedestal)attend defect: 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. clean front pedestal housing., 5. take measurement as per instruction of eic. (involves checking of pinion shaft/gear, assembly, main oil pump gear wheel, gov. assembly & checking the backlash of gears.), 6. attend the defect/trouble shoot the problem in front pedestal as per instruction of eic., this includes the following work beside defect attending as per instruction of eic., 7. dismantle pinion shaft and record the alignment w.r.t to the gov. assembly., a) dismantle mop (main oil pump) bearings and gear., b) do servicing of mop and replace damaged items., c) dismantle governor assembly (consists of gop-governing oil pump and other, elements)., d) do servicing of gop and replace damaged items., e) assemble mop and governor assembly., f) put governor assembly in position., g) do alignment of the pinion shaft w.r.t to governor assembly., h) put electronic over speed shaft (pinion shaft) in position., i) put mop assembly in position., j) record backlash of gears and if requires, do adjustment., 8. measure the clearances of first three rows of oil gland fins & its servicing, 9. assembly of oil gland segments (new or old) and setting of clearances., 10. after the work, box up front pedestal top cover., 11. link control valve linkages, oil piping etc., 12. do rig test for setting governing characteristics., 10.20 tmstu56oh000 steam tur (bearings) serv- 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. check bearing interference, toc, soc etc., 5. remove turbine front bearing top & bottom halves., 6. do the dpt and ut of turbine bearing., 7. check thrust bearing pads and do dpt, ut and blue matching., 8. check toc, soc, bearing interference of bearing after servicing., 10.30 tmstu01bd794 steam tur (<=30mw#) repl-gland- 1. removal of first 2 rows of hp front steam gland segments., 2. servicing of (new or old) gland segments and springs., 3. measurement of dimensions and machining of gland segments if required., 10.40 tmtgs01bd701 turbine gov. sys (<=30mw#) maintenance- i) attending passing defect in four nos. steam control valves, ii) servicing of two nos. hydraulic servomotors (including relay gear) of control valves, iii) inspection & servicing of speed governor and setting its governor characteristics (rig test)., iv) inspection & servicing of cies valve (left & right)., 1. ensure ptw from concerned person., 2. breaking of insulation around steam control valves & removal of debris from site., 3. dismantle linkages and decouple all four nos. control valves from spring box assembly, 4. remove spring box assembly from position., 5. dismantle bonnet bolts & remove all four control valves., 6. check blue contact / kerosene test of plug with respective seats., 7. do lapping of all control valves, replace plug/other components, if required., 8. assemble all control valves and tighten bonnet bolts., 9. servicing of cies valves (left & right), 10.servicing of spring box assembly hinges & pins etc., 11.place spring box assembly & couple all control vales with spring box., 12. servicing of two nos. hydraulic servomotors of control valves., 13. servicing of primary relay oil cylinder for checking for excessive draining of oil. replacement of relay gear power, piston if needed., 14. servicing of secondary relay., 15. servicing of linkage., 16. replacement of steam leak-off and impulse line pipes as per eic instruction. dp test of welding joints are to be, carried out., 17. inspection of speed governor, assessment of its component s healthiness, repl