Get complete information related to latest Water Pump Impeller Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Water Pump Impeller Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Water Pump Impeller Tenders.
Tender For tender for supply of coupling key part no 01 for beacon weir secondary raw waterpump , shaft nut part no 03 for beacon weir secondary raw waterpump , o ring water thrower , part no 8 for beacon weir secondary raw waterpump , lantern ring , part no 16 for beacon weir secondary raw waterpump , distance piece , part no 18 for beacon weir secondary raw waterpump , stuffing box bush part no 19 for beacon weir secondary raw waterpump , impeller key part no 24 for beacon weir secondary raw waterpump , pipes , part no 25 for beacon weir secondary raw waterpump , coupling bush for beacon weir secondary raw waterpump , coupling pin for beacon weir secondary raw waterpump , shaft sleeve fam for beacon weir secondary raw waterpump , gland plate for beacon weir secondary raw waterpump , crw pumps jtc-33cl/1 stage pum for beacon weir secondary raw waterpump , water thrower , part no 7 for beacon weir secondary raw waterpump , grease nipple for beacon weir secondary raw waterpump , bearing housing de part no 04 for beacon weir secondary raw waterpump , bearing housing nde part no 12 for beacon weir secondary raw waterpump , stud bolt with nut m12x80 part no 26 for beacon weir secondary raw waterpump
Tender For miscellaneous works in thermal-2 - miscellaneous works in thermal-2, the work shall be carried out on a manday basis and includes collection, segregation, and shifting of metallic and non-metallic waste materials from the thermal-2 building premises. the activities cover handling of rusted metallic items, structural scrap, insulation materials, oil sludge/oil slick, mud, debris, and other miscellaneous scrap lying at various locations such as the ground floor near boiler area, pipe rack area, tg floor area, cooling tower area, and other surrounding premises. the work also includes bringing down waste materials from different floors of boiler units 1, 2, and 3 to ground level and consolidating them at a designated location. all manpower, tools, tackles, and equipment shall be provided by the contractor. payment shall be made based on actual mandays engaged and certified by the engineer-in-charge., the work shall be executed on a manday basis and includes loading and unloading of segregated metallic and non-metallic scrap/waste materials within the fact ud / petro plant premises as directed by the engineer-in-charge. all required manpower, tools, tackles, and handling equipment including concrete lump breakers shall be arranged by the contractor. payment shall be made based on actual mandays engaged and certified by the engineer-in-charge., transportation of scrap and waste materials loaded under sl. no. 2 from cpp - pd premises to the designated scrap yard, waste dumping area, or any other location within the fact ud / petro plant premises, as directed by the engineer-in-charge. the contractor shall provide a suitable truck having carrying capacity up to 2 tonnes for the purpose.the rate per trip shall be inclusive of all charges such as vehicle hire, driver wages, fuel, and any other incidental expenses.copies of the relevant scrap dispatch advice and weighbridge report shall be submitted by the contractor for each lot of material transported. the quantity indicated is tentative and payment shall be made based on actual number of trips certified by the engineer-in-charge., the work shall be performed on a manday basis and includes moving and rearranging used materials and equipment parts such as valves, pumps, flanges, motors, radiators, drums, welding sets, structural items, roof sheets, and other related materials stacked at various locations including cpp building north and south entrance areas, boiler feed pump area, tg floor area, and other specified locations, as instructed by the engineer-in-charge. required cleaning materials, rigging materials, tools, tackles, and manpower shall be arranged by the contractor. the eot crane at the tg floor may be used free of cost, subject to availability. loading and unloading for shifting within the petro plant premises shall be in the contractor s scope. payment shall be made based on actual mandays engaged and certified by the engineer-in-charge., the work shall be carried out on a manday basis and includes removal of vegetation from the outer side walls and top platforms of cooling tower cells, removal of vegetation from the side walls and floor of the cooling tower pond, and removal of accumulated mud, slurry, and other unwanted materials within the cpp cooling tower area. all manpower, tools, tackles, and equipment required for execution shall be arranged by the contractor. cleaning of all four cooling tower cells shall be treated as a single activity., the work shall be executed on a manday basis and includes thorough cleaning of the furnace oil (fo) pump house area. furnace oil spillage on floors, including areas beneath oil heaters, around pumps, condensate drains, and adjoining areas, shall be removed by spreading sawdust and collecting the oil-soaked sawdust for proper disposal as instructed by the engineer-in-charge. sawdust, cotton waste, manpower, tools, and all other materials required for complete execution of the work shall be arranged by the contractor. payment shall
Tender For corrigendum : supply of complete bowl and column assembly for electrical driven fire waterpump , thrust bearing for fire waterpump , o ring for fire waterpump part no 5220101 , o ring for fire waterpump part no 5250101 , o ring for fire waterpump part no 5240101 , transmission bearing for fire waterpump , impeller shaft bearing part no 3540101 , impeller shaft bearing part no 354201 , impeller shaft with sleeve for fire waterpump , intermediate shaft for fire waterpump , impeller shaft bearing for fire waterpump , head shaft for electrical driven fire waterpump , head shaft for diesel fire waterpump , intermediate shaft for diesel driven fire waterpump