Web Analytics Made Easy - StatCounter

Water Recirculator Tenders

Get complete information related to latest Water Recirculator Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Water Recirculator Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Water Recirculator Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :44591352 Due date: 11 May, 202611 May, 2026 2.45 Lacs
Tender For corrigendum : work for lifting of heavy chemicals from operation and maintenance store -ii to etp, d.m plant, ph-iv 2x250mw, unifilter plant, purolater plant, shed near clarifier of ab type colony domestic water supply etc stps sarni.

State Government

CTN :45064323 Due date: 20 May, 202620 May, 2026 1.04 Lacs
Tender For ktps-v stage- i and c- erection of new earth pits ( 6 nos) at ahp, clarifier, chlorination and dm plant dcs system.-reg

CTN :45057581 Due date: 16 May, 202616 May, 2026 9.50 Lacs
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of

CTN :45058197 Due date: 22 May, 202622 May, 2026 NA
Tender For supply of cat. no: 16707501001 premium make complete gearbox for clarifier bridge (cpp) gearbox type: a-237, s , cat. no: 08801600005 premium make complete gearbox for clarifier stirrer (tpp) gearbox model: v-500, , cat. no: 08801700005 premium make complete gearbox for clarifier stirrer (cpp) gearbox model: a-287,

Central Government/Public Sector

CTN :44895788 Due date: 07 May, 202607 May, 2026 NA
Tender For corrigendum : tender for supply of assembly and spares for agitators gearbox in desalination plant -ro 1 cip agitator gb , 20 1 , 750rpm wheel s , clarifier ft gb , 10 1 , 150rpm gb asse , clarifier ft gb , 10 1 , 150rpm worm wheel , clarifier ft gb , 10 1 , 150rpm worm shaft , clarifier ft gb , 10 1 , 150rpm wheel shaft , antiscalant agitator , gb , 15 1 , 100rpm ww , antiscalant agitator , gb , 15 1 , 100rpm whs , ro-2 cip agitator gb , 15 1 , 100rpm gb asse , ro-2 cip agitator gb , 15 1 , 100rpm worm wh , ro-2 cip agitator gb , 15 1 , 100rpm worm sh , ro-2 cip agitator gb , 15 1 , 100rpm wheel s , poly agitator , gb , 15 1 , 100rpm worm wheel , poly agitator , gb , 15 1 , 100rpm worm shaft , poly agitator , gb , 15 1 , 100rpm wheel shaft

State Government

CTN :43579078 Due date: 10 Jan, 202610 Jan, 2026 NA
Tender For corrigendum : design and build sewage treatement plant of installed capacity 16 mld primary clarifier, 1 nos of main pumping station, along with all appurtenant structures and allied works, including (ii) survey, designs and build interception drain tapping of 01 nos drain, inculding rising mains of 50 meter and disposal of treated effluent through popeline. (iii) operaton & maintenance of the complete works of sewage treatment plant, interception & diversion works, and effluent channel for a period of 15 years in muzzafarpur town, state of bihar, india.

CTN :44985531 Due date: 13 May, 202613 May, 2026 NA
Tender For supply of slipring assembly for clarifier of pt plant at unit 3&4 sikka tps

CTN :44985537 Due date: 12 May, 202612 May, 2026 2.61 Lacs
Tender For labour charge for removal/transportation of silt, mud and water algae from cooling tower, cw pump house, clarifier & miscellaneous sump unit # 6 at utps. (civil ph)

Co-operative

CTN :44756889 Due date: 04 May, 202604 May, 2026 60.00 Lacs
Tender For supply, installation, testing and commissioning of 2000 lph ghee clarifier unit to mandya dairy

State Government

CTN :45030331 Due date: 11 May, 202611 May, 2026 NA
Tender For procurement of centre mechanism assembly for bagasse clarifier
 Loading, Please wait...

Connect us via What's Up